Sealed proposals for furnishing all labor, materials and equipment and performing all work necessary to construct a 10 Unit T-Hangar Building at the Lake Cumberland Regional Airport in Somerset, KY.
This project consists of one bid package for the construction of a 10 unit T-Hangar building, exterior water faucets, and electrical components on a concrete slab. Site work shall be performed by others under separate contract, and not included in this bidding project.
WKU-PDC-2014-025 Construction Honors College/International Facility
WKU-PDC-2014-025 Construction Honors College/International Facility
This project shall be for the new construction of the Honors College/International Facility on the main campus of WKU. All trades will be needed on this project.
Construction of a one-story 13,765 square foot building for use as a community space and adult education and training and includes associated site work, general construction, fire protection, plumbing, HVAC, and electrical.
Partial renovation of five rooms in the basement of the Young Library to create three new offices for the new presentation learning center as well as creating open learning areas for the center. Project will include electrical, HVAC modifications, reorganizing the current layout, fit and finish upgrades.
Subcontract construction portions of Maple Ridge Apartments, including, but not limited to, sanitary sewerage and domestic water, hot-mix asphalt paving, masonry, HVAC, packages waste water treatment plant, electrical, metal porch and stair fabrication, and exterior finishes.
OBannon Woods State Park Road and Parking Improvements
OBannon Woods State Park Road and Parking Improvements
Bids shall be taken from Prime Contractors pre-qualified by the Public Works Certification Board in the following classification: 1611.02 Asphalt Construction of Roads and Parking Lots.
The New Pleasant View Elementary project consists of a 45,380 square feet new construction. The project includes sitework, concrete, masonry, structural steel, finishes, mechanical, fire protection and electrical.
West Shelby Water District Phase 2 – Horizon Group Waterline Extension
West Shelby Water District Phase 2 – Horizon Group Waterline Extension
This contract consists of approximately 2,680 LF of 16” Ductile Iron waterline, 455 LF of Bored Steel Encasement for 16” pipe, 120 LF of Open Cut Steel Encasement for 16” Pipe, 380 LF of 8” PVC waterline, 80 LF of Bored Steel Encasement for 8” Pipe, 500 LF of 6” PVC waterline and appurtenances.
RFB-150-14
Scope of Work:
This project involves renovating four bathrooms in the Meadows Group Home. The bathrooms are similar except one has a roll in shower and three have a bath tub. The demolition of the project will include removal of the floor, the existing fixtures, and the existing gypsum board from 4’-0” to the floor. New subfloor and joist will be installed. In areas to receive mud set sloped tile floor the joists will be recessed. All bathrooms will receive new tile floors and walls to 4’-0” AFF. A new tile roll in shower will be installed. New water closets will be installed. The vanities will be replaced with new wall mount solid surface countertops with new drop in sinks. A goal of the project is to provide durable finishes that will stand up to a high use level.
Georgetown/Scott County EMA/OHS Antenna Tower Replacement
Georgetown/Scott County EMA/OHS Antenna Tower Replacement
The project is considered a “Turn-Key Project” and consists of the replacement of the existing Emergency Management communication antenna tower with a new self-supporting type antenna tower with antennas and waveguide ice bridge to the existing building and shall include all design engineering and all associated work for a complete antenna tower installation ready for use by the Owner. After new tower is installed and operational as confirmed by the Owner, the existing tower shall be removed as part of the scope of work.
The work to be bid upon is described as follows:
15,000 LF 6” PVC Force Main
12,000 LF 4” PVC Force Main
2,000 LF 3” PVC Force Main
6,000 LF 2” PVC Force Main
110 Individual Residential Grinder Pump Station
1 – 180gpm Pump Station with Odor Control
All Appurtenances
Estimate: $125,000.00
The project consists of removing and old generator located in the Admin. Bldg. and
associated transfer switch and providing a new generator located at the exterior of the
Admin. Bldg., transfer switches and associated distribution equipment with additional
capacity to handle existing and new anticipated loads. The new emergency power
distribution system will be separated into NEC 700 emergency loads and NEC 702
optional standby loads. Existing HVAC equipment used for cooling of data equipment
loads will be removed from the normal power distribution system and reefed from the
new emergency NEC 702 optional standby loads distribution system. The project
includes and expansion of the existing thru the building management system. The
project will include testing and commissioning of the new emergency power distribution
system prior to refeeding existing loads from the new distribution system.
Davis Park View
Construction of two-duplex apartment building, two single family buildings and two-quadplex buildings located in the city of Lexington
The buildings will include one and two levels and be constructed with wood framing, brick veneer, fiber cement siding, metal roof, and other materials required by the funding source.
SCOPE of WORK
General Scope of Work includes excavation and paving, concrete, masonry and, structural steel, metals, rough and finish carpentry, thermal protection, roofing, all finishing trades, fire protection, plumbing, HVAC and Electrical work. MBE / WBE trades are encourged to participate.
The project includes providing all construction supervision, labor, materials, tools and test equipment for the replacement and upsize of approximately 6,500 linear feet of sanitary sewer from manhole WR4_480 upstream to WR4_29 within the Wolf Run Sewer Shed of Lexington-Fayette County, Kentucky
Construction of a new 2.0 mgd water treatment plant. The construction of a new raw water intake and pump station; operations, filter, and chemical building; flocculation and/or settling basins; clearwell and high service pump station; one sludge lagoons
Raw Water and High Service Transmission Mains City of Greensburg
Raw Water and High Service Transmission Mains City of Greensburg
800 LF of 10-inch restrained joint, ductile iron water line pipe, 1600 LF of 10-inch PVC pipe, and 850 LF of 12-inch PVC water pipe and accessories; and 40 LF of 18-inch bore and cover pipe