Garrard County Emergency Operations Center

Garrard County Emergency Operations Center

The Following Bids are Requested:

1 PAVING
2 GENERAL TRADES
3 MASONRY
4 ROOFING
5 ALUMINUM WINDOWS AND STOREFRONTS
6 DRYWALL AND FRAMING, ACOUSTICAL CEILINGS
7 PAINTING / COATINGS
8 FLOORING
9 MECHANICAL
10 ELECTRICAL
11 COMBINATION

Lancaster, KY

Click Here to View

Pine Creek, Cram Creek and Pert Creek Phase 2 Water System Improvements

Pine Creek, Cram Creek and Pert Creek Phase 2 Water System Improvements

Construct approximately 38,120 feet of 3-inch through 8-inch water main, prefabricated booster pump station, master meter vault, pressure reducing vaults, and related appurtenances.

Letcher Co, KY

Click Here to View

Idle Hour Trunk Sewer Replacement

Idle Hour Trunk Sewer Replacement

The Project Includes providing all construction, labor, material, tools and test equipment necessary for the construction of 2,287 ft or 21 inch sanitary sewer, 195 ft of 10 inch sanitary sewer, 710 ft of 8 inch sanitary sewer, 34 manholes, and all other necessary appurtenances

Lexington, KY

Click Here to View

The Sampson Branch Watershed Project

The Sampson Branch Watershed Project

This project consists of the providing of all materials labor and equipment for the construction of: Furnish and install, complete and ready for service, 505 L.F. of 60″ diameter storm drain under +/- 30 feet of cover. Remove and/or grout approximately 480 L.F. failed 48″ storm drain. Relocate utilities and restore surfaces as necessary. Maintain existing storm drainage throughout construction.

London, KY

Click Here to View

Eagles Nest Pump Station

Eagles Nest Pump Station

Contract 12 consists of one (1) above ground water pump station.

Pulaski Co, KY

Click Here to View

Fleming 2012 Water Project

Fleming 2012 Water Project

Approximately 46,000 LF of 3-inch to 8-inch water line replacement and upgrade, including appurtenances.

Engineer’s Estimate is $900,000

Fleming Co, KY

Click Here to View

Harlan Housing Authority Waste Line Replacement

Harlan Housing Authority Waste Line Replacement

Waste Line Replacement (six-story Apartment Building)

Harlan, KY

Click Here to View

Putnam Stadium Locker Rooms

Putnam Stadium Locker Rooms

The project scope is to install aluminum grandstand bleachers and press box along with the demolition of the existing stadium structure. The project scope will include electrical and plumbing work, along with concrete foundations for masonry, roofing and railings.

Ashland, KY

Click Here to View

Runway 6-24 Crack Repairs and Overlay Project Wendell H Ford Airport

Runway 6-24 Crack Repairs and Overlay Project Wendell H Ford Airport

Runway 6-24 Crack Repairs and Overlay Project

Chavies, KY

Click Here to View

City of Frankfort Forest Villa Manhole Rehabilitation

City of Frankfort Forest Villa Manhole Rehabilitation

The project scope includes the rehabilitation of a manhole and an open cut repair of one of its pipe penetrations along with replacement of the cover of a second manhole with a hatched lid.

Frankfort, KY

Click Here to View

City of Frankfort Crestwood I&I Rehabilitation Project

City of Frankfort Crestwood I&I Rehabilitation Project

Frankfort, KY

Click Here to View

Meadows Northland Arlington Neighborhood Improvement Project Phase 5C

Meadows Northland Arlington Neighborhood Improvement Project Phase 5C

Construct all associated sanitary and storm sewer piping and structures as shown. Provide all erosion control measures, concrete sidewalk, curb and gutter, and asphalt paving as required.

Lexington, KY

Click Here to View

Mckee Housing Authority Sidewalks and Porch Pads

Mckee Housing Authority Sidewalks and Porch Pads

The replacement of sidewalks and installation of additional porch pads.

McKee, KY

Click Here to View

TARC Customer Service Kiosk Replacement

TARC Customer Service Kiosk Replacement

The Transit Authority of River City will receive sealed bids for the furnishing of all labor, materials and the performance of all work required for the Union Station TARC Customer Service Kiosk Replacement Project.

Louisville, KY

Click Here to View

Lexington-Fayette Urban County Housing Authority Central Office Exterior Improvements

Lexington-Fayette Urban County Housing Authority Central Office Exterior Improvements

Central Office Exterior Improvements

Lexington, KY

Click Here to View

Stratton Branch AML Water Supply Project

Stratton Branch AML Water Supply Project

This project consists of providing all materials, labor, and equipment for the construction of a water distribution system including 4,230 of PVC water line, 1,880 LF of ductile iron water line, 1,150 LF of HDPE service line, and 27 residential meters.

Prestonsburg, KY

Click Here to View

Cerulean 300,000 Gallon Water Storage Tank Barkley Lake Water District

Cerulean 300,000 Gallon Water Storage Tank Barkley Lake Water District

The construction of a 300,000 gallon water storage tank, site work, yard piping, access road, and fencing.

Cerulean, KY

Click Here to View

Water System Improvements Barkley Lake Water District

Water System Improvements Barkley Lake Water District

The installation of approximately 6,795 LF of 6-inch PVC pipe, 305 LF of ductile iron pipe, hydrants, water booster pumping station, telemetry and accessories.

Trigg Co, KY

Click Here to View

RFB-245-14 Beech Creek Dam and Spillway Channel Improvements

Kentucky Division of Water
Estimate:
$140,400.00

The project consists of the following main activities:
Remove accumulated sediment from the existing Beech Creek Dam spillway stilling basin and downstream channel; Remove rock in the channel bottom to lower the water level in the stilling basin; and Locate, install additional piping, clean, and videotape the existing foundation drains.

Manchester, Kentucky

click here to order

RFB-253-14 Butler Reserve Center Renovation Military Affairs

Butler Reserve Center Renovation Military Affairs
Estimate: $3,332,943.00

The Work consists of selective demolition and renovation to an existing military administrative/training building located next to Bowman Field, in Louisville, Kentucky, that consists of a 52,000 S. F., 2-story administration wing and a 12,000 S. F., one-story Assembly wing. Interior renovation work will entail: replacement of existing floor finishes throughout most of the facility, replacement of limited ceiling tiles, construction of limited interior walls with doors and frames, new HVAC, electrical upgrades, limited plumbing, painting; while exterior work will primarily consist of tuck pointing and sealing existing masonry as well as constructing a new “Rain Screen” wall system that will be comprised of brick,
aluminum and glass. Site work will include asphalt paving, limited grading and landscaping.

Louisville, Kentucky

click here to order

CCK-1959-14 Dairy Barn

CCK-1959-14 Dairy Barn

Construction of a new 22,800 SF Dairy Housing Research and Teaching Facility. The facility consist of two clay floor animal holding pack areas separated by cow feed bunk lanes and a middle feeding drive lane. The structure is to be structural steel columns and beams with light gage purlins and girts to support the exposed fastened metal roofing.

The site is greenfield. Minor grading will be required with adequate site available material.

Water is available nearby the site. The project will connect to an existing meter vault and run to a water room where a backflow preventer is located as well as a manifold to supply lines for future watering stations. Drain lines are connected to an existing waste drainage system. Sanitary sewer work is not required in this project.

Electric service is available from a nearby pole on site. This project will run empty conduit to a meter (where KU will run conductor in the conduit from the pole). This project includes a main disconnect, 200 AMP breaker panel and supply for receptacles and Owner provided, contractor installed lights and fans. Provisions for future communications is provided, but the communication work is not include in this contract.

This project moves four cow brushes from nearby barns as well as installs an automatic feed system for 16 cows in the southeastern pack.

Lexington, KY

Click Here to View

Clark County Middle School Roof Recoat

Clark County Middle School

Roof Recoat

Winchester, KY

Click Here to View

Franklin County Fiscal Court Buildings Electrical Conversion

Franklin County Fiscal Court Buildings Electrical Conversion

Electric Conversion of elevator, HVAC and kitchen equipment for the Franklin County Fiscal Court Buildings located at 313-315 West Main Street, 321 W Main Street and First United Methodist Church building located at 211 Washington Street, Frankfort, KY.

Frankfort, KY

Click Here to View

Water Street Arch Culvert

Water Street Arch Culvert

The scope of work includes a Unit Price Contract to provide Pre-cast Arch Culvert and related products.

Richmond, KY

Click Here to View

City of Frankfort Unit Price Concrete Projects

City of Frankfort Unit Price Concrete Projects

General concrete sidewalk and curb maintenance and construction and new sidewalk and curb construction work to be performed on an as needed, cafeteria style project scope with bid unit prices to remain in affect for a period of one year.

Frankfort, KY

Click Here to View