The Scope of work requested within this Invitation to Bid consists of purchasing and furnishing all labor, resources, supervision, materials, supplies, equipment, facilities and programming necessary to install the Founders Hall Observatory
Divide office S125 into two smaller offices. Update HVAC system in rooms S125B, S125 and S123. Offices S125 and S125B will be updated with new ceilings, paint and floor coverings.
RFB-10-15 Demolition and Reclamation-Bid Pack#1 Kitchen Buil
Paducah School of Art & Design
Estimate:
$310,647.00
This project consists of the demolition of the two-story metal, wood framed structure, demolition of the single story connector and reclamation of the wood components for potential reuse in the final product. Additionally, demolition of the architectural and MEP items will occur in the two-story masonry structure including, but not limited to, removal of the first floor structure, interior non-loadbearing walls, and roof.
CONTRACT 494-09-02 Construction of a new water treatment plant. The construction will include the construction of a new section of raw water transmission main, operations/ filter/chemical building, floc and settling basins, c1earwell and high service pump station, and sludge lagoons.
WKU-PDC-2015-001 Health Services Parking Lot Reconfiguration
WKU-PDC-2015-001 Health Services Parking Lot Reconfiguration
The parking lot reconfiguration project is for the WKU Health Services Parking Lot and will use Electrical services, paving, concrete, curbing, communications, landscaping and any other service needed to complete this parking lot reconfiguration.
Bluegrass Station
Estimate: $254,366.00
This project includes the construction of a new free-standing building to be used for
washing large trucks with hand held sprayers. Pre-engineered Wash Equipment will be
direct purchased by the Owner, and assembled by the Contractor. This project will
construct a un-heated pre-engineered metal building around the wash area.
Construction shall include site grading, concrete footings and slab, masonry foundation
walls, pre-engineered metal building, metal roofing, metal siding and gutters, roll up
service doors and steel man doors. Domestic cold water will tap the existing 4″ main at
Burma Road and enter the building through a reduced pressure type backflow
preventer. Cold water will be supplied to the owner furnished, contractor installed
wash equipment. Minimal heat will be provided in the building with wet location, electric
unit heaters to provide freeze protection for the plumbing systems and not for human
comfort. The electrical service will originate from the existing overhead 3-phase line
adjacent to Burma Road near the new building site. The primary conductors will extend
overhead to a pole mounted transformer bank and through a weatherhead to the main
distribution panel (MDP). The MDP will serve the Hydrosite power electrical
panelboard and also serve an electrical power panel for that will subsequently feed
general receptacles have been located in the interior of the building, exterior
receptacles, lighting, and mechanical equipment. Lighting will be provided by wet
location rated, industrial type, T8 Fluorescent fixtures. The interior space will be
designed to a lighting level of 30 footcandles. Exit signs will be located at each exit,
with exterior egress lights. Exterior wall-packs will be provided above the garage door
for general exterior illumination and around the exterior perimeter of the building.
Plumbing and Electrical shall include connection to and extension of site lines and
pipes.
14-118 / Reutlinger Avenue Area Lead Service Renewals
14-118 / Reutlinger Avenue Area Lead Service Renewals
Louisville Water Company is requesting Bids for the renewal of lead services on Reutlinger Avenue, East Oak Street and Mary Street.
Design information indicates a total of 93 customer servic e renewals, 13 customer service discontinues and 19 meter exchanges.
The program of work for which bids are to be submitted consists of, but is not limited to, the following: Approximately 1,970 lineal feet of new 16″ DI water piping and appurtenances. The work is shown on the Drawings and described in the Specifications.
Clark Co Airport Runway 18-36 Extension Project Phase 1
Clark Co Airport Runway 18-36 Extension Project Phase 1
The Division A Base Bid and Additive work will consist of miscellaneous demolition, approximately 200,000 CYS of earthwork, 1,991 LF of storm sewer, 3,035 LF of gravel access roads, and runway and taxiway markings.
The Division B Base Bid and Additive work shall consist of new electrical power installation to NAVAIDS, MALSR demolition, MALSR installation, and associated electrical and controls work.
RFB-8-15 Masonry Repairs Madisonville State Office Building
RFB-8-15
Estimate:
$205,724.00
Remove and replace damaged, spalled brick and stone. Masonry and stone pointing & repair. Remove and replace joint sealant at masonry control joints. Clean and seal brick and stone.
The scope of work includes the installation of approximately 6,000 linear feet of a 10′ asphalt trail including construction associated with storm sewer pipe, sediment control, drainage structures, signage, and pavement striping.