WKU-PDC-2015-001 Health Services Parking Lot Reconfiguration

WKU-PDC-2015-001 Health Services Parking Lot Reconfiguration

The parking lot reconfiguration project is for the WKU Health Services Parking Lot and will use Electrical services, paving, concrete, curbing, communications, landscaping and any other service needed to complete this parking lot reconfiguration.

Bowling Green, KY

Click Here to View

Warren Central High School Media Center Renovation

Warren Central High School Media Center Renovation

Media Center Renovation

Click Here to View

Trigg County Transportation Museum Exterior

Trigg County Transportation Museum Exterior

Exterior Renovation

Cadiz, KY

Click Here to View

Woodford County Public Schools Central Office Window Replacement

Woodford County Public Schools Central Office Window Replacement

Central Office Window Replacement

Please Note the pre-bid meeting is Thursday June 26th at 11:00.

Click Here to View

Robertson Apartments

Robertson Apartments

Renovation of the Robertson Building located at 100 West Main Street, Springfield KY 40069.

Springfield, KY

Click Here to View

City of Lancaster New Water Treatment Plant Transmission Mains

City of Lancaster New Water Treatment Plant Transmission Mains

Contract 404-09-03-New Water Treatment Plant Transmissions Main

Lancaster, KY

Click Here to View

RFB-2-15 New Truck Wash Facility

Bluegrass Station
Estimate: $254,366.00
This project includes the construction of a new free-standing building to be used for
washing large trucks with hand held sprayers. Pre-engineered Wash Equipment will be
direct purchased by the Owner, and assembled by the Contractor. This project will
construct a un-heated pre-engineered metal building around the wash area.
Construction shall include site grading, concrete footings and slab, masonry foundation
walls, pre-engineered metal building, metal roofing, metal siding and gutters, roll up
service doors and steel man doors. Domestic cold water will tap the existing 4″ main at
Burma Road and enter the building through a reduced pressure type backflow
preventer. Cold water will be supplied to the owner furnished, contractor installed
wash equipment. Minimal heat will be provided in the building with wet location, electric
unit heaters to provide freeze protection for the plumbing systems and not for human
comfort. The electrical service will originate from the existing overhead 3-phase line
adjacent to Burma Road near the new building site. The primary conductors will extend
overhead to a pole mounted transformer bank and through a weatherhead to the main
distribution panel (MDP). The MDP will serve the Hydrosite power electrical
panelboard and also serve an electrical power panel for that will subsequently feed
general receptacles have been located in the interior of the building, exterior
receptacles, lighting, and mechanical equipment. Lighting will be provided by wet
location rated, industrial type, T8 Fluorescent fixtures. The interior space will be
designed to a lighting level of 30 footcandles. Exit signs will be located at each exit,
with exterior egress lights. Exterior wall-packs will be provided above the garage door
for general exterior illumination and around the exterior perimeter of the building.
Plumbing and Electrical shall include connection to and extension of site lines and
pipes.

Lexington, Kentucky

click here to order

14-118 / Reutlinger Avenue Area Lead Service Renewals

14-118 / Reutlinger Avenue Area Lead Service Renewals

Louisville Water Company is requesting Bids for the renewal of lead services on Reutlinger Avenue, East Oak Street and Mary Street.
Design information indicates a total of 93 customer servic e renewals, 13 customer service discontinues and 19 meter exchanges.

Louisville, KY

Click Here to View

Flood Gate 118, Gate and Actuator Replacement Project

Flood Gate 118, Gate and Actuator Replacement Project

This contract is for the removal and replacement of gate118 and corresponding actuators.

Louisville, KY

Click Here to View

Lexington-Fayette Urban County Housing Authority Central Office Exterior Improvements Re-Bid

Lexington-Fayette Urban County Housing Authority Central Office Exterior Improvements Re-Bid

Central Office Exterior Improvements

Lexington, KY

Click Here to View

Champion Way 16″ Water Main Extension – Phase 2

Champion Way 16″ Water Main Extension – Phase 2

The program of work for which bids are to be submitted consists of, but is not limited to, the following: Approximately 1,970 lineal feet of new 16″ DI water piping and appurtenances. The work is shown on the Drawings and described in the Specifications.

Georgetown, KY

Click Here to View

Clark Co Airport Runway 18-36 Extension Project Phase 1

Clark Co Airport Runway 18-36 Extension Project Phase 1

The Division A Base Bid and Additive work will consist of miscellaneous demolition, approximately 200,000 CYS of earthwork, 1,991 LF of storm sewer, 3,035 LF of gravel access roads, and runway and taxiway markings.

The Division B Base Bid and Additive work shall consist of new electrical power installation to NAVAIDS, MALSR demolition, MALSR installation, and associated electrical and controls work.

Clark Co, KY

Click Here to View

RFB-8-15 Masonry Repairs Madisonville State Office Building

RFB-8-15
Estimate:
$205,724.00
Remove and replace damaged, spalled brick and stone. Masonry and stone pointing & repair. Remove and replace joint sealant at masonry control joints. Clean and seal brick and stone.

Madisonville, Kentucky

Click here to order

Martin County Middle School Roof Renovation

Martin County Middle School Roof Renovation

Roof Renovation

Warfield, KY

Click Here to View

Indian Fort Trail Phase 2 Project

Indian Fort Trail Phase 2 Project

The scope of work includes the installation of approximately 6,000 linear feet of a 10′ asphalt trail including construction associated with storm sewer pipe, sediment control, drainage structures, signage, and pavement striping.

Berea, KY

Click Here to View

Pikeville Commons Lift Station Relocation Phase 1

Pikeville Commons Lift Station Relocation Phase 1

This project includes installation of 1,010 LF of 10-inch PVC gravity sewer with three manholes.

Pikeville, KY

Click Here to View

Magoffin Co New High School Bid Package #26 Polished Concrete

Magoffin Co New High School Bid Package #26 Polished Concrete

Polished Concrete

Salyersville, KY

Click Here to View

Highview Park Walking Path #3248

Highview Park Walking Path #3248

Furnish all labor, material and necessary equipment for the Highview Park Walking Path.

Louisville, Ky

Click Here to View

Water Line Relocation Race Track Hollow Road

Water Line Relocation Race Track Hollow Road

Contract 519-13-03
Water Line Relocation
Approximately 1,050 LF of 6-inch ductile iron water line relocation and related appurtenances.

Letcher Co, KY

Click Here to View

City of Maysville, Combined Sewer Overflows Phase 2

City of Maysville, Combined Sewer Overflows Phase 2

The work to be bid upon is described as follows:
Approximately 15,300 feet of 16-inch ductile iron force main, 1,300 feet of 4-inch PVC force main, 1,100 feet of 4-inch PVC conduit, one duplex lift station, SCADA system, and all necessary appurtenances and fittings needed to construct the proposed line and connect into the existing system.

Maysville, KY

Click Here to View

Pippa Passes Sewer Rehabilitation Contract 25

Pippa Passes Sewer Rehabilitation Contract 25

The work to be bid consists of:
Installation of approximately 5,000 LF of 8″ SDR 17 PVC folded/formed liner and other rehabilitation services.

Viccio, KY

Click Here to View

City of Owingsville, Wastewater Treatment Plant Modifications

City of Owingsville, Wastewater Treatment Plant Modifications

Furnish and install an industrial pretreatment facility including pre-engineered metal building, influent pump station, a complete dissolved air flotation system (influent screen, dissolved air flotation unit, chemical feed system, solids storage tanks, pumps, controls and facilities for a complete and operating system), all required electrical work and site work and piping as shown on the Drawings and as specified.

Owingsville, KY

Click Here to View

Ewing Fire Department Addition And Renovation

Ewing Fire Department Addition And Renovation

This project will consist of an addition 1,386 sf pre-engineered metal building addition to the existing garage bays of the Ewing VFD building. The project will also include areas of renovation to the exterior of the existing building, which will include the replacement of the existing doors and windows and the installation of new insulated metal wall panels on the existing metal building. The project will also include substantial renovations and refinishing of the existing wood-frame part of the facility.

Ewing, KY

Click Here to View

14-114/ Bullitt County Extension Program (BCEP) – WorldView Circle Area Main

14-114/ Bullitt County Extension Program (BCEP) – WorldView Circle Area Main

Louisville Water Company is requesting Bids for the installation of 700 +/- LF of four (4) inch ductile iron water main, 725 +/- LF of four (4) inch PVC water main, 200 +/- LF of six (6) inch ductile iron water main and one (1) fire hydrant. A pre-bid meeting to discuss the Project will be held on Tuesday, June 24, 2014 at 10:00 a.m. EST/EDT at Louisville Water Company, 550 South Third Street, Louisville, KY 40202. Attendance at this meeting is strongly recommended. Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Renee Fromme, email at rfromme@lwcky.com. The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $100,001 – $250,000. Pursuant to KRS 337.505-550, if the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: (1) the Contractor must pay Prevailing Wage; and (2) a Bid Bond is required. For this Contract, prevailing wage does not apply, and a Bid Bond is not required. Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in all of the following prequalification categories: 4” – 16” PVC Water Mains and 4” – 16” Ductile Iron Water Mains. For information about pre-qualification, contact the Buyer listed above. Award of the Contract will be based on base bid pricing and is at the Company’s sole discretion. Alternate bid(s) may or may not be awarded. The Company will award the Contract to the Bidder presenting a Bid that is responsive to the Specifications, is in substantial compliance with the Contract requirements, and presents the lowest and best price for performing the Work making up the base bid. The Company may accept the Bid that the Company determines is in the Company’s best interest, which may not necessarily be the least expensive Bid. Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com

Louisville, KY

Click Here to View

14-111 Filter Drain Valve Replacement at B.E. Payne Water Treatment Plant Phase 3

14-111 Filter Drain Valve Replacement at B.E. Payne Water Treatment Plant Phase 3

Louisville Water Company is requesting Bids for the replacement of four (4) filter drain valves, actuators, and associated piping at the B.E. Payne Water Treatment Plant. A pre-bid meeting to discuss the Project and to tour the work site will be held on Tuesday, June 24, 2014 at 10:00 a.m. EST/EDT. at B. E. Payne Water Treatment Plant, 7400 Upper River Road, Prospect, KY 40059. Attendance at this meeting is strongly recommended. Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Robin Heitz, email at rheitz@lwcky.com. The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $250,001 – $500,000. Pursuant to KRS 337.505-550, if the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: (1) the Contractor must pay Prevailing Wage; and (2) a Bid Bond is required. For this Contract, prevailing wage does apply, and a Bid Bond is required. Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in the Heavy Construction prequalification category. For information about pre-qualification, contact the Buyer listed above. Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.

Louisville, KY

Click Here to View