14-131 / Crescent Hill Pump Station Slate Roof Replacement and Masonry
14-131 / Crescent Hill Pump Station Slate Roof Replacement and Masonry
Louisville Water Company is requesting Bids for providing all labor, rigging, tools, equipment, and materials to replace slate roofs and rehabilitate the exterior building envelopes at the Crescent Hill Pump Station Boiler Building, and Bath House. Work includes, but is not limited to, replacement/rehabilitation of slate roof, gutters, downspouts, concrete, masonry, painting and paint removal.
14-128 / Allmond Distribution Center Garage Overhead Crane Replacement
14-128 / Allmond Distribution Center Garage Overhead Crane Replacement
Louisville Water Company is requesting Bids for the installation of a new 2-ton, bridge crane in the mechanics garage at the Allmond Distribution Center. This installation shall include all labor, rigging, tools, equipment, and materials.
RFP for the Development of Louisville Gardens #072114
RFP for the Development of Louisville Gardens #072114
The Louisville Gardens is iconic and possesses a rich history of hosting marquee events ranging
from concerts to athletic events. The cultural purpose of this RFP is to return what is currently an
underutilized and dilapidated property to a venue which will once again be an important and relevant
community asset.
The format of this RFP is intended to be flexible rather than prescriptive. Proposals shall contain
a financial plan and an operational plan that describe the Respondent’s general vision and
implementation plan.
The RFP contains provisions to which Louisville will not agree under any circumstances. If a
proposal includes one of the provisions listed in the “Dealbreakers” section, then said proposal shall be
deemed non-responsive/non-responsible and will NOT be evaluated by Louisville.
2362.0 Commonwealth Stadium Rebid Work Category VV-XX-YY-ZZ
2362.0 Commonwealth Stadium Rebid Work Category VV-XX-YY-ZZ
Trade Contracts shall include:
Work Category Number VV – Waterproofing/Caulking
Work Category Number XX – Railings
Work Category Number YY – Carbon Fiber Strengthening
Work Category ZZ – Fence and Gates
Frozen Creek Waterline Extension Phase 3 Contract 1 – Waterlines
Frozen Creek Waterline Extension Phase 3 Contract 1 – Waterlines
Work is to include installation of approximately 350 LF of 8-inch, 17,080 LF of 6-inch, 19,745 LF of 4-inch, 1,000 LF of 2-inch waterline with 3,740 LF of various sized directionally drilled creek/river crossings, other appurtenances and 51 service connections.
The building is about 5300 sq.ft, wood stud walls, wood trusses , brick, vinyl siding, vinyl windows, aluminum trim and shingle roof. The project includes a commercial kitchen with walk-in cooler, walk-in freezer and commercial hood. Project will be constructed under a single prime contract.
The project consists of the removal and replacement of all exterior building brick veneer, windows, doors, roof shingles, building mounted utilities, HVAC equipment, etc. in New Albany, Indiana for the New Albany Housing Authority.
Bluegrass Airport TSA Ceiling And Lighting Renovation
Bluegrass Airport TSA Ceiling And Lighting Renovation
The Project shall consist of replacing ceiling tile, HVAC diffusers and lighting in the TSA Administration Office area and replacing ceiling grid, ceiling tile, HVAC diffusers and lighting in the TSA Break Room area.
Construction of 36 residential units consisting of three buildings located at 1052-1056 Cross Keys Road in Lexington, KY. The buildings will be three levels and be constructed with wood framing, brick veneer, fiber cement siding, asphalt shingle and membrane roof and other materials. General Scope of Work includes excavation and paving, concrete, masonry, metals, rough and finish carpentry, thermal protection, roofing, all finish trades, HVAC, plumbing, fire protection and electrical work.
Scope of Work at KY032-002 (1 Bedroom unit)
1. Removal of existing HVAC units and line sets
2. Install new mini-split heat pump units, including reworking existing duct work, installation of new line sets and wall bracket for exterior unit
3. Install new drywall soffits
4. Patch and paint existing walls and new soffits affected by work
CCK-1972-15 Medical Science Building Air Handling Unit
CCK-1972-15 Medical Science Building Air Handling Unit
Replace the existing 100% outside air 15,000 CFM air handling unit serving this building which is located in the basement. The unit is being replaced with a more efficient fan wall technology and is being sized at 20,000 CFM for future capacity. The unit will have a steam coil, chilled water coil, and humidifier similar to current condition. A clean steam to steam humidifier is being added for better indoor air quality. The control system for the unit is being replaced with a new electronic DDC system and alternate is being provided for adding the building heating system to the control system as well.
The project involves the construction of a new wood-framed, one-story, slab on grade office, approximately 4200 square feet in area. The brick veneered facility has a standing seam metal roof in the base bid. The project includes preparation of a building pad and limited amount of sitework.
Louisville City Football Club Facility at Slugger FIeld #3259
Louisville City Football Club Facility at Slugger FIeld #3259
Request for Proposal a contract to provide all labor, materials and other necessary equipment for the Louisville City Football Club Facility at Slugger Field per the attached specifications.
14-87 / Watterson Expressway Area Lead Service Renewals
14-87 / Watterson Expressway Area Lead Service Renewals
Louisville Water Company is requesting Bids for the renewal of lead services in the Watterson Expressway Area. Design information indicates a total of 106 customer service renewals, one (1) customer service relocate, seven (7) customer service discontinues, and 33 meter exchanges.
A price contract for a portion of Louisville Metro Government’s need for the Annual Sidewalk & Curb Maintenance ReBid for a period of twelve (12) months, per the attached specifications.
Middletown Sanitary Recapture Phase I and II – Section A Project
Middletown Sanitary Recapture Phase I and II – Section A Project
This Contract provides for the installation of approximately 5,331 linear feet of 24-inch sewer and 3,292 linear feet of 21-inch sewer. This project also includes installing 29 sanitary manholes, erosion control, stream bank restoration, and appurtenant work. The project is generally located along Chenoweth Run Creek and terminates near the intersection of Avoca Road and Aiken Road.
Historic Switzer Covered Bridge
Estimate:
$ 64,100.00
This project includes the replacement of 25 roof squares of cedar shingles on the Historic Switzer Covered Bridge in Franklin County, Kentucky. This is a historic covered bridge over North Elkhorn Creek and special considerations will be required by the Contractor to prevent building debris from entering the creek. A Plan of Acton will be required by the Contractor for Owner to submit to the Division of Water. Trash collection and portable toilets will be required. There will be some minor carpentry repair and replacement required using rough cut materials. There will be a 20 year roof warranty required for the completed roof.
AML Reclamation Project
Estimate:
$ 81,915.00
We will install a new crossing at the failed crossing across the tributary running parallel to North Webb Road and perpendicular to KY 246. Temporary diversion of the stream in the work area is incidental to the overall project. Remove the existing pipes and concrete headwall. Remove sediment from the stream channel 25’ upstream and 50’ downstream for an average depth of ~1’maintaing stable side slopes. Do not remove trees or undercut the existing banks. Construct an interlocking block crossing. The roadway base will be set at the excavated channel flow path; all construction materials will be set below the 1’ lowered stream base. Efforts (equipment, labor, materials, etc.) necessary to divert the water around the work site will be incidental to site preparation. The crossing should have ~6:1 side slopes at with a 6’ bottom width. The No. 2 stone base, geo-grid, and concrete header and footer are paid under the roadway stone, geo-grid, and concrete bid items.
The upper project area will address sediment and poorly vegetated areas. We will clean out two existing silt traps. These Type B traps will not be lined with class II rock and will be deeper than normal traps to accommodate the metal precipitates from the acid mine drainage.
Eastern State Hospital
Estimate:
$323,100.00
The project is the selective modification to the nurse stations and adjacent areas on nine floors of the patient bed towers. The work is represented in the documents and generally includes the following:
Selective interior demolition and renovation for:
a. Modifications to 9 existing nurse station caseworks to allow the addition of low casework walls with half-doors and hardware.
b. Providing a 30”W x 36” H pass-through opening with coiling overhead door in each of 9 Medication Rooms located behind the Nurse Station areas. Openings to be made in metal stud/impact resistant gypsum board wall construction. Work includes termination of an existing duplex electrical outlet in a medication room behind each nurse station.
c. Providing manufactured handrails along both sides of the patient corridors in 7 floors of the patient towers.
Lake Cumberland Youth Development Center
Estimate:
$108,350.00
The project involves miscellaneous repairs for the Lake Cumberland Youth Development in Monticello, Kentucky. The work includes but is not limited to the following: asbestos abatement of resilient tile flooring mastic, minor interior wall demolition, new resilient tile and base, resinous flooring in the kitchen, interior painting, replacement of two doors in existing frames, and miscellaneous patching and repairing of adjacent finishes. Three window replacements, kitchen equipment vent, demolition of toilet. Alternate #1 includes installation of a new masonry wall and hollow metal door with associated finishes.