The project includes:
providing all construction supervision, labor , materia ls, tools, test equipment necessary for the reconstruction of pipelines and conduits by the installation of approximately 1,590 L.F. of 30-inch, resin-impregnated, flexible tube , and 10 manhole rehabilitations using a resin-based liner.
All work activities required and necessary to furnish and install all of the projects elevators and associated equipment essential for their complete and safe operation. The four elevators of this project include two electric traction passenger and two electric traction service elevators.
RFB-12-15 HVAC Upgrade Big Sandy Comm and Tech College
Magoffin Building
Estimate:
$170,382.00
Project consists of replacement of HVAC pneumatic and electronic controls with complete new control system including, graphics, programming, air flow monitors, actuators, valves, etc. Project includes cleaning of existing air handler interior, installing sheet metal over VAV box filter housings, and replacing hot water piping in mechanical room. For continued project description see Special Conditions.
RFB-13-15 Steam Line Relocation Ky State Penitentiary
Steam Line Relocation Ky State Penitentiary
Estimate:
$ 50,000.00
The Work consists of the following: All construction work associated with providing steam line relocation to Cell House #1, #2 and Administration Building. Extending a high
pressure steam line from Cell House #2 to the Administration Building. A steam pressure reducing valve station shall be provided prior to connection to the existing low pressure steam piping. A steam flash tank shall be provided to reduce the steam condensate pressure prior to connection to the existing condensate receiver.
Louisville Water Company is requesting Bids for annual unit for necessary labor, equipment, and tools to excavate, connect, backfill, and otherwise install, renew, or discontinue the aforementioned water service connections. This unit price Master Agreement will be for one year with an option to renew up to four (4) additional one-year terms at the sole discretion of the Louisville Water Company. The Consumer Price Index will be used as the cost adjustment factor. Bid Category Description :
A: INSTALLATION OF JIt-INCH & I-INCH WATER SERVICE CONNECTIONS Prequalification Category: I” & Smaller Water Services Estimated Contract Value Range: $300,000 to $500,000
B: INSTALLATION OF I ~-INCH & 2-INCH WATER SERVICE CONNECTIONS Prequalification Category: 1.5″ & Larger Water and Fire Services Estimated Contract Value Range: $ I00,000 to $250,000
C: INSTALLATION OF 4-INCH & LARGER WATER SERVICE CONNECTIONS Prequalification Categories: IS’ & Larger Water & Fire Services and 4″- I6″ Ductile Iron and 4″-16″ PVC Water Mains Estimated Contract Value Range: $80,000 to $ I00,000
D: FIRE SERVICE NEW INSTALLATION Prequalification Category: 1.5″ & Larger Water and Fire Services Estimated Contract Value Range: $200,000 to $300,000
E: FIRE SERVICE RENOVATIONS Prequalification Category: 1.5″ & Larger Water and Fire Services Estimated Contract Value Range: $200,000 to $300,000
F: FIRE HYDRANTS NEW INSTALLATION Prequalification Categories: 4″-16″ Ductile Iron and 4″-16″ PVC Water Mains Estimated Contract Value Range: $20,000 to $50,000 Revised 6/29/2012
G: FIRE HYDRANT REPLACEMENTS Prequalification Categories: 4″- I6″ Ductile Iron and 4″- I6″ PVC Water Mains Estimated Contract Value Range: $20,000 to $50,000
H: RENEWAL OF 3/4″-INCH & I-INCH WATER SERVICE CONNECTIONS Prequalification Category: I” & Smaller Water Services Estimated Contract Value Range: $20,000 to $50,000
I: DISCONTINUING 2-INCH & SMALLER SERVICE CONNECTIONS Prequalification Categories: I” & Smaller Water Services Estimated Contract Value Range: $20,000 to $50,000
J. LARGE METER RENOVATIONS Prequalification Categories: 1.5″ & Larger Water and Fire
This project is for the upgrading and modernization of three elevator traction system currently in service in Anderson Hall located at 512 Administration Drive on the University of Kentucky Campus. The three elevators share a common hoistway, machine room, and pit. The elevators are situated side by side. Each elevator has a capacity of 3500 pounds and all three are 8 floors in line.
Sealed bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 W. Liberty St., Louisville, KY 40203 for the construction of Shadow Wood WWTP Elimination, Contract No. 283487, Budget ID No. A09557, Drawing Record No. 283487, Sheets 1 through 9 will be received at the office of MSD until 12:00 P.M. Noon Local Time, July 31, 2014, and at that place and time be publicly opened and read.
Description and location of Project: Construction will include the installation of approximately 318 feet of 16-inch sewer pipe; 1,577 feet of 15-inch sewer pipe; trenchless installation of 16-inch carrier and 36-inch casing pipe; installation of 10 manhole structures; decommissioning of two pump stations; restoration of a treatment lagoon; decommissioning of Shadow Wood Wastewater Treatment Plant, and other miscellaneous appurtenant work.
Work of this proposed contract comprises of installing a new pre-engineered/manufactured pressbox with platform and existing bleacher systems. Electric and data connections to be Owner furnished and installed.
Nicholas Co Water District Phase 10 – Water Transmission Line
Nicholas Co Water District Phase 10 – Water Transmission Line
Phase 1 – Water Transmission Line
a) 19,000 LF – 6” CL 250 PVC Water Line
b) 14 EA – 6”, 4”, 2” Gate Valves
c) 6 EA – Blow off and Air Release Valves
d) 200 LF – 6” & 4” WL Bore and Jack
Berea Municipal Utilities Water Treatment Plant Solids Handling
Berea Municipal Utilities Water Treatment Plant Solids Handling
The work to be bid is described as follows:
Upgrade of existing lagoons and recycling facilities, and addition of geotextile bag storage facilities and associated work.
The Scope of work requested within this Invitation to Bid consists of purchasing and furnishing all labor, resources, supervision, materials, supplies, equipment, facilities and programming necessary to install the Founders Hall Observatory
Divide office S125 into two smaller offices. Update HVAC system in rooms S125B, S125 and S123. Offices S125 and S125B will be updated with new ceilings, paint and floor coverings.
RFB-10-15 Demolition and Reclamation-Bid Pack#1 Kitchen Buil
Paducah School of Art & Design
Estimate:
$310,647.00
This project consists of the demolition of the two-story metal, wood framed structure, demolition of the single story connector and reclamation of the wood components for potential reuse in the final product. Additionally, demolition of the architectural and MEP items will occur in the two-story masonry structure including, but not limited to, removal of the first floor structure, interior non-loadbearing walls, and roof.
CONTRACT 494-09-02 Construction of a new water treatment plant. The construction will include the construction of a new section of raw water transmission main, operations/ filter/chemical building, floc and settling basins, c1earwell and high service pump station, and sludge lagoons.
WKU-PDC-2015-001 Health Services Parking Lot Reconfiguration
WKU-PDC-2015-001 Health Services Parking Lot Reconfiguration
The parking lot reconfiguration project is for the WKU Health Services Parking Lot and will use Electrical services, paving, concrete, curbing, communications, landscaping and any other service needed to complete this parking lot reconfiguration.