City of Taylorsville – Maple Street Pavement Improvements
City of Taylorsville – Maple Street Pavement Improvements
a.) 1 EA – General grading required for new paving
b.) 360 SY – Furnish and Install 6″ DGA & 4″ Asphalt Base
c.) 2500 SY – 18′ Wide with 2″ Asphalt Overlay
d.) 435 LF – Furnish and install 1 W’ Schedule 40 PVC Conduit
e.) 16 EA – Furnish and install Schedule 40 PVC 1 W’ long radius elbows for proposed light poles
City of Taylorsville – Levee Improvements Water and Sewer
City of Taylorsville – Levee Improvements Water and Sewer
CONTRACT 5: LEVEE IMPROVEMENTS (Water & Sewer)
a.) 2 EA – Remove existing sewer pump station and water control vault
b.) 34 CY – Furnish and install flowable fill
c.) 470 LF – Pressure grout existing lines
d.) 120 LF – Clean 8″ C.I.P.
e.) 1 LS – Miscellaneous items to be removed ie. Pipes, stumps, foundation, etc
Russell Independent Schools – Health Careers Renovation
Russell Independent Schools – Health Careers Renovation
Furnish all necessary labor, materials, tools, machinery, warranties, and all other items required to renovate existing structure to meet plans and specifications. Work to include, but not limited to; metal framing, painting, ceilings, flooring, custom casework, lighting, electrical, hvac, roofing and plumbing.
City of Shepherdsville – KY 44 Sewer Improvements – Lakeview Drive to Maple Street
City of Shepherdsville – KY 44 Sewer Improvements – Lakeview Drive to Maple Street
KY 44 Sewer Improvements Lakeview Drive to Maple Street consists of the construction of approximately 3,035 L.F. of 12-inch sewer, 13 manholes and other appurtenances.
Morris Forman Water Quality Treatment Center Headworks Modifications
Morris Forman Water Quality Treatment Center Headworks Modifications
The work associated with this project include, but is not limited to, the following items:
Renovation of East Headworks, including:
1. Influent flume repairs
2. New chain and multi-rake bar screens
3. New vortex grit removal equipment
4. New grit cyclones and classifiers with a revised arrangement
5. Addition of a conveyor equipment access door
6. New grit and water scour piping
7. New built-up bituminous roof and equipment hatches
8. Demolished heaters inside the building and new heaters installed on the roof
9. Miscellaneous concrete repairs
Renovation of the West Headworks, including:
1. New influent gate actuator platform
2. New influent gate actuators
3. New chain and multi-rake bar screens
4. New screenings belt conveyors
5. New grit collection system
6. New grit screw conveyors
7. New channel aeration pipe and flow meters
8. New HVAC system
9. New W2 booster pump and piping
10. Miscellaneous structural improvements
11. New built-up bituminous roof
The project also includes site improvements in front of the East and West Headworks; actuator modifications at splitter structures upstream of the Headworks facilities; new downward opening weir gate and stop logs upstream of the West Headworks; electrical, instrumentation and control improvements in the Headworks facility; and primary sludge pump station piping and fitting modifications.
RFB-191-15 UT Eagle Creek Stream and Wetland Mitigation
Higginson-Henry Wildlife Management Area KY Dept Fish and Wildlife
Estimate:
$1,094,600.00
The contract will be for the construction of a stream and wetland mitigation site located on the Higginson-Henry Wildlife Management Area in Union County, Kentucky. The contractor will be responsible for the grading of 5 restored stream channels on-site and in-stream modification of 6 existing stream channels. Grading will include the installation of several different in-stream structures and placement of gravel material in restored riffles. Additional site grading will include the installation of groundwater dams, grading historically modified wetland areas to proposed elevations, and removal and plugging of drain tiles in an active agricultural field. The contractor will be responsible for all sediment and erosion control measures. The contractor will be responsible for installation of live cuttings, bare root trees and containerized trees.
Union County, Kentucky
click here to order
East & West Carter Co High Schools
Grandstands Replacements
Sealed bids will be received by the Carter County Board of Education for Grandstand Replacement at East & West Carter Co. High Schools in Grayson.
Consisting of the construction and/or furnishing of items as listed in the Bid Schedule for the Lexington Fire Department Maintenance Building, Lexington, Kentucky, which will be a 38’x l00′ concrete block building with poured concrete foundation, concrete slab, light gauge metal roof framing, plywood deck, asphalt shingle roof. The building will have electric service, basic lighting and power. There will be a floor drain system. The building is for apparatus and equipment storage.
City of Nicholasville – Mary Rose Pump Station Elimination
City of Nicholasville – Mary Rose Pump Station Elimination
The scope of work includes the installation of approximately 770 LF of 8″ gravity sewer line and related appurtenances, and the decommissioning of an existing sewer pump station.
City of Lawrenceburg – Maintenance Building Project
City of Lawrenceburg – Maintenance Building Project
The project consists of a new maintenance building including but not limited to the pole barn building, foundation, plumbing, HVAC, electrical, finish work and all other items outlined in the construction plans.
Louisville Water Company is requesting Bids for the renewal of lead services on S. Brook St., S. Floyd St., E. and W. St. Catherine St., and E. and W. Oak St. Design information indicates a total of 94 customer service renewals, one (1) customer service relocate, 12 customer service discontinues and 14 meter exchanges.
Louisville Water Company is requesting Bids for installation of 60 +/- linear feet of 8-inch DR-18 C900 PVC water main (using traditional trench installation techniques), the installation of 540 +/- linear feet of 8-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques), the installation of 1,275 +/- linear feet of 6-inch DR-18 C900 PVC water main (using traditional trench installation techniques) and the installation of 1,780 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques). Also included with the project is the installation of 6 +/- fire hydrants and the transfer, renewal, relocation or discontinue of 116 +/- customer services.
The project scope includes the construction of a new, pre-engineered metal building with three storage bays, with approximately 1200 gsf. The project includes the demolition of the existing wooden structure, grading, concrete work, asphalt pavement and minimal electrical systems.
Construct all associated sanitary and storm sewer piping and structures as shown on the construction plans and specifications for the Meadows-Northland-Arlington Neighborhood Improvement Project, Phase SD. Provide all erosion control measures, concrete sidewalk, curb and gutter, and asphalt paving as required for the project.