Housing Authority of Winchester
Housing Authority of Winchester
Bathroom Flooring Replacement, Interior Doors, Interior Water Line Replacement & Concrete Walks
Winchester, KY
Housing Authority of Winchester
Bathroom Flooring Replacement, Interior Doors, Interior Water Line Replacement & Concrete Walks
Winchester, KY
Hickory Hills Waterline Project Contract 26
Construction of approximately 3,300 linear feet of 6 inch waterline and the installation of one (1) hydropneumatic pump station. The Contractor shall furnish all materials , equipment and labor necessary to complete the construction of the waterline, appurtenances and reclamation.
Vicco, KY
Warren County Schools Briarwood Elementary – Replace Cooling Tower
Replacement of Cooling Tower
Bowling Green, KY
Warren County Schools Lost River Elementary – Replace Cooling Tower
Replacement of Cooling Tower
Bowling Green, KY
CCK-1986-15 Kinkead Hall Dormer Renovation and Window Replacement
Exterior dormer renovation and window replacement. Work includes all equipment, materials and labor required to complete the project.
Lexington, KY
Magoffin Softball and Baseball Field
The following bids are requested:
2 ASPHALT PAVING
3 GENERAL TRADES
4 BLEACHERS
5 FIELD WORK
6 MECHANICAL PLUMBING
7 ELECTRICAL
Salyersville, KY
Petersburg Park Playground Purchase and Installation #3318
A price contract for a portion of Louisville Metro Government’s need for Petersburg Park Playground Purchase and Installation.
Louisville, KY
Lewis County Aquisition-Demolition Project
Demolition of 6 Properties
Vanceburg, KY
City of Danville Community Arts Center REBID
This project provides for removal of existing concrete steps, concrete walk/curbs and asphalt pavement and construct ion of a new concrete accessible ramp/steps/rails and new asp halt pavement as shown on drawings and specified. New Indiana Limestone pane ls shall be installed on east side of existing porch where 4 original panels are removed. No other Limestone Cladding required .
Danville, KY
Lewis County Aquisition-Demolition Project
Demolition of 6 Properties
Lewis Co, KY
Click Here to View
CCK-1995-15 Blazer Hall 3rd Floor Renovation
Renovate the entire third floor of Blazer Hall for the temporary relocation of Student Center Services offices. Scope also includes renovation of five rooms in the Blazer basement for the Student Center Cat’s Den.
Lexington, KY
Poplar Lane Roadway Improvements #3327
A contract for Poplar Lane Roadway Improvements per the attached specifications.
Louisville, KY
Annual General Maintenance and Repairs for Aquatic Facilities #3314
A price contract for a portion of Louisville Metro Government’s need for the Annual General Maintenance and Repairs for Aquatic Facilities for a period of twelve (12) months.
Louisville, KY
Muddy Fork Interceptor SSO Storage Basin Project
This Contract is for the construction and installation of a 1.4 million gallon off-line, cast-in-place concrete, covered, sanitary sewer overflow storage basin including dewatering pumps, 433 linear feet of 21-inch sanitary sewer, 35 linear feet of 12-inch sanitary sewer force main, and all other related appurtenances located at 1910 Charbdin Place, near Blankenbaker Lane and Camargo Road in northeastern Jefferson County.
Louisville, KY
Logan CSO Basin
Construction of a 16.7 Million Gallon below grade reinforced concrete storage basin with twelve flushing gates, wet well with three 100 HP chopper pumps and one 10 HP chopper pump, elevated catwalk, two stairwells, electrical, mechanical, instrumentation and control system, and site work as detailed in the Construction Documents.
Louisville, KY
Interim Hydraulic Improvements to the Hite Creek WQTC
Construction of improvements to the Hite Creek Regional Water Quality Treatment Center to increase the rated peak hourly flow capacity from 16 mgd to 24 mgd. Improvements include connection of force mains from the Harrods Creek Pump Station and the Meadow Stream Pump Station to the Preliminary Treatment Building through magnetic flow meters and a new junction chamber, a new grit removal tank, a new coagulant feed mixing chamber, a new 102 foot diameter secondary clarifier with RAS and scum pumping station, a new effluent Parshall flume metering structure, a new UV disinfection channel, a new cascade aerator and outfall to Hite Creek, a new plant drain and recycle pump station, a new chemical storage and feed building, related site work, electrical, piping and mechanical improvements. The Project is located at the Hite Creek Regional Water Quality treatment Center in northeast Jefferson County.
Louisville, KY
Rattlesnake Ridge Contract I-1 100,000 Gallon Elevated Water Tank
Contract No. 1-1- 100,000 Gallon Elevated Water Tank a.) 100,000 gallon elevated water tank & appurtenances
b.) Access road and Fencing
c.) Tank Demolition
Grayson, KY
City of Taylorsville Contract A Waterline Replacement
The project includes but is not limited to the following:
CONTRACT “A” – WATERLINE REPLACMENTS (TOWN HILL, BANK ALLEY, MAIN STREET AND GARRARD STREET)
a.) 3880 L.F. 6″ C900 DRl4 PVC Waterline
b.) 1800 L.F. 1″ CL 200 PVC Service Line
c.) 16 EA 4″/6″ / 8″ Gate
d.) 4 EA Fire Hydrants
e.) 50 EA Relocate and Reconnect Meters
f.) 780 S.Y. Remove and Replace Sidewalk
g.) 130 L.F. Open Cut State Highway w/12″ steel casing & 6″ W.L. and flowable fill
Taylorsville, KY
City of Danville Public Works Building
Renovation of the existing Public Works Building
Danville, KY
City of Middletown Main Street Streetscape Phase VI
The Project consists of demolition of existing concrete sidewalk & repairs , construction of road widening improvements 0.25 miles including all restoration necessary.
Middletown, KY
City of South Shore Water Treatment Plant Clearwell Replacement
Construction of an above ground prestressed concrete clearwell, valve, vault, and associated yard piping
South Shore, KY
Recoat / Repair Chestnut Street 500,000 Gallon Elevated Water Storage Tank
Recoat/repair tank interior and exterior, replace riser and shell manholes, and install a handrail on the roof.
Berea, KY
Water System Improvements Paintsville Utilities
Construct two (2) valve vaults, install three (3) motor operated valves, and associated piping and SCADA modifications.
Paintsville, KY
2363.0 Academic Science Building Bid Package 06
In general, Bid Package 06 includes the necessary work items required to furnish and install the building enclosure consisting of brick veneer, terracotta panels and exterior column features, glass and aluminum curtain wall, windows and entrances, and the option of foam or modified bitumen roofing systems; the interior finishes, including gypsum and ceiling system, acoustical wall panels, floor and wall coverings, door frames and hardware, millwork and finish carpentry, laboratory equipment and casework; and all Mechanical and Electrical building systems, including plumbing, heating, ventilation and cooling, fire suppression, controls, electrical power and lighting, telecommunications, security and all ADA and life safety considerations necessary and required.
Lexington, KY
2411.0 Multi Disciplinary Science Building 4th Floor Renovation
The work consists of selective demolition as shown on the drawings and the complete renovation/fit-up of the Fourth Floor of the MDS Building located at 725 Rose Street in Lexington, KY. The floor contains approximately 15,000 square feet, Work includes new walls, doors, acoustical panel ceilings, finishes, light fixtures and electrical work, plumbing, mechanical ductwork. Hazardous material abatement is included in the scope of work. There are three add alternates.