Project Description:
Project consists of approximately 7400 LF of 6″ waterline, 900 LF of 4″ waterline, 1100 LF of 3″ waterline, 6200 LF of service tubing, 500 LF of bored and open cut encasement, 15 ea. gate valves, 7 ea. blow off assemblies, 101 service re-connections, 400 LF of free bore, 4 ea. directional bores, 12 ea. Fire Hydrants, 710 LF of pavement replacement, and all necessary water line fittings and appurtenances. This is a replacement and upgrading of existing facilities.
Louisville Water Company is requesting Bids for the referenced project which consists of furnishing all labor, material, equipment and incidentals required for the removal of the old main, supply and installation of twenty-five (25) pipe sections of 24-inch PCCP transmission main along Preston Highway utilizing lay-in-place method as approximately shown on the drawings as specified herein. Please refer to the drawings for more details.
The project involves re-roof work at the Kentucky State Police Post 10 building in Harlan, KY. The existing approximately 4,900 square foot roof to be removed is an EPDM single ply system on top of another roof system on metal deck. The new roof system is a SBS Modified Asphalt Two Ply system that is cold adhered over a 3 1/2″ rigid board insulation with fully taper system. The existing stone coping will be covered with new sheet metal coping. A roof access ladder is to be installed as part of this project and is listed as Alternate #1. Roof Access Ladder. This is the only alternate item.
The project consists of removal of an existing low pressure electric steam boiler and soft water make-up system, and replacement with a new low pressure electric steam boiler and soft water make-up system used for humidification. The successful contractor will be responsible for the entire replacement including purchase cost, receiving, unloading, installing in their permanent location, and all manufacturer warranties. Contractor is responsible for all equipment and materials for a complete and working installation
This project consists of the development of a 142 space surface parking lot on the main campus of Owensboro Community & Technical College located on New Hartford Road. The scope of work consists of earthwork, stone base, asphalt pavement and concrete curbs, site lighting and sidewalks. A significant alternate is indicated to relocated approximately 2,500 CY of earth material to a different location on campus to remove a berm and prepare an additional site for future development.
Project consists of adding masonry welding booths in an existing space. Space is to be painted, hardware to doors upgraded, and spray on sound proofing insulation shall be provided. Systems shall be installed include electrical power and exhaust system with dust collector to support the welding booths. Additionally the building’s existing electrical service will be replaced with a new electrical service.
Kentucky One Health – Jewish Hospital – New Open Office – 2nd & 5th Floors
Kentucky One Health – Jewish Hospital – New Open Office – 2nd & 5th Floors
Project Description:
Wehr Constructors is a Bidding GC on this project.
Development/ expansion of approximately 17,000 sf of office space located at 100 East Liberty Street floors 2 and 5, Louisville Ky 40202. Your firm is invited to submit a proposal for the Construction Services associated with the construction I renovation of this space.
Project Description:
The project is for the construction of a new parking structure to be located in the Creason Parking Lot of Western Kentucky University’s main campus. A site location feasibility study has been completed internally by WKU. The emphasis is on both minimizing the number of displaced existing surface parking spaces and maximizing the number of gained parking spaces. The impact on surface traffic circulation within the Creason Lot and adjacent surface streets shall also be investigated.
Relevant experience should include parking structure design, green design principles, access and revenue control equipment, traffic flow, transit service, and energy efficiency strategies.
PROJECT DESCRIPTION: Installation of an Owner furnished 2500 Ton Water Chiller and the associated cooling tower in an existing utility plant. Requirement are MEP modifications and the construction of the cooling tower basin. Additions to tie the new equipment into the existing facility
Project consists of installation of new 2500 ton water chiller, new cooling towers, new condenser water pump, new transformers, new VFD’s, and new sine wave filter, etc. at the Power Plant at Northern Kentucky University. Also included will be necessary mechanical, electrical and structural work to complete installation
Louisville Metro Government’s Need for Right Turn Lane on Hudson Lane to Bardstown Road #3474
Louisville Metro Government’s Need for Right Turn Lane on Hudson Lane to Bardstown Road #3474
A Fixed Contract to furnish all labor, material and necessary equipment for a portion of Louisville Metro Government’s need for Right Turn Lane on Hudson Lane to Bardstown Road.
Blue Grass Airport – Runway 4-22 and Taxiway A Markings
Blue Grass Airport – Runway 4-22 and Taxiway A Markings
The Project consists of repainting of the Runway 4-22 markings, including thresholds, edge lines, center lines, touchdown markings, runway numbers, taxiway lead lines, overrun chevrons, hold markings, runway safety area markings and taxiway Alpha center line as well as the new painting of the West Side Apron pavement markings.
Historic Locust Grove Home Stabilization Rebid #3477
Historic Locust Grove Home Stabilization Rebid #3477
A contract to furnish all labor, material and necessary equipment for the Locust Grove Historic Home Stabilization Project per the departmental specifications.
Harlan Independent Board of Education – Middle School/High School New Cafeteria & Kitchen Addition
Harlan Independent Board of Education – Middle School/High School New Cafeteria & Kitchen Addition
Project Description: Project consists of I 0,084 square foot new cafeteria and kitchen addition with kitchen equipment and supporting spaces to the existing Harlan Independent School District Middle School I High School. Project also includes partial replacement of the existing elementary school kitchen equipment.
Construction Contract: Bids will be received for the following Work:
I. General Contract (all trades).
Project Description: This is a “Vanilla Box” deal and the Landlord will be responsible for the following items: Refer to Sheet T2.0 for a complete list of Land lord responsibilities.
Supply and install (3) HVAC units with all roof work, structure, electrical, & gas piping associated. Supply and install ductwork per drawing Hl.O Install (2) two ADA compliant restrooms per Aspen Floor Plan, complete (undergrounds, framing, plumbing, exhaust, ceilings, lighting, floor drain) 225 amp 3 phase 120/208V electrical service with 42 breaker panel & 24 space sub panel installed per plan. Perimeter walls @ Demising wall taped and sanded ready for Aspen’s finish Concrete floor will be smooth and ready for Aspen’s finish Install, wire and pipe Hot water heater Install sign circuits and time clocks for exterior signage Install ceiling per Aspen’s plans Install overhead lighting per plans Install drinking fountain if needed by local code Install Gas and water service into Aspen’s space.
Housing Authority of Floyd County – Left Beaver Creek Townhouse Digital Security System
Housing Authority of Floyd County – Left Beaver Creek Townhouse Digital Security System
The Housing Authority needs to complete its updating of Left Beaver Creek Townhouse digital security system by replacing (6) existing analog security cameras with megapixel IP digital color cameras, plus adding two (2) IP cameras to the system.
Existing cameras – 6 black white, signal coax, with 12 vdc power
Existing DV recorder – Digital Watchdog, Model # D-UF-16 V Max Flex
Existing wiring – underground, PVC junction boxes, 3″ PVC conduit
Roof Replacement, EIFS Installation, and Storage Building Construction
A. Building Type “C”
1. Replace front porches
2. Replace back porches
3. E.1.F.S.
4. Roof replacement
5. Stone installation
B. Construct attached storage buildings
1. EIFS
2. Stone installation
3. Asphalt shingles
4. Wood frame construction