Lexington Fire Department Maintenance Building

Lexington Fire Department Maintenance Building

Consisting of the construction and/or furnishing of items as listed in the Bid Schedule for the Lexington Fire Department Maintenance Building, Lexington, Kentucky, which will be a 38’x l00′ concrete block building with poured concrete foundation, concrete slab, light gauge metal roof framing, plywood deck, asphalt shingle roof. The building will have electric service, basic lighting and power. There will be a floor drain system. The building is for apparatus and equipment storage.

Lexington, KY

Click Here to View

Thomas Street Sidewalk Improvement Project

Thomas Street Sidewalk Improvement Project

Sidewalk Improvements

New Albany, IN

Click Here to View

Lebanon Middle School Roof Replacement

Lebanon Middle School Roof Replacement

The project includes removal of approximately 78,000 SF of ballasted EPDM roof system and replacement with a 2-ply, modified bituminous membrane roof.

Lebanon, KY

Click Here to View

City of Nicholasville – Mary Rose Pump Station Elimination

City of Nicholasville – Mary Rose Pump Station Elimination

The scope of work includes the installation of approximately 770 LF of 8″ gravity sewer line and related appurtenances, and the decommissioning of an existing sewer pump station.

Nicholasville, KY

Click Here to View

City of Lawrenceburg – Hilltop And Indian Trail Lift Station Elimination Project

City of Lawrenceburg – Hilltop And Indian Trail Lift Station Elimination Project

The project consists of approximately 630 feet of 8″ Gravity Sewer, 5 Man holes and appurtenances.

Lawrenceburg, KY

Click Here to View

City of Lawrenceburg – Maintenance Building Project

City of Lawrenceburg – Maintenance Building Project

The project consists of a new maintenance building including but not limited to the pole barn building, foundation, plumbing, HVAC, electrical, finish work and all other items outlined in the construction plans.

Lawrenceburg, KY

Click Here to View

15-19 I-65 Area Lead Service Renewal Project

15-19 I-65 Area Lead Service Renewal Project

Louisville Water Company is requesting Bids for the renewal of lead services on S. Brook St., S. Floyd St., E. and W. St. Catherine St., and E. and W. Oak St. Design information indicates a total of 94 customer service renewals, one (1) customer service relocate, 12 customer service discontinues and 14 meter exchanges.

Louisville, KY

Click Here to Order

15-16 Hale Avenue MRRP

15-16 Hale Avenue MRRP

Louisville Water Company is requesting Bids for installation of 60 +/- linear feet of 8-inch DR-18 C900 PVC water main (using traditional trench installation techniques), the installation of 540 +/- linear feet of 8-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques), the installation of 1,275 +/- linear feet of 6-inch DR-18 C900 PVC water main (using traditional trench installation techniques) and the installation of 1,780 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques). Also included with the project is the installation of 6 +/- fire hydrants and the transfer, renewal, relocation or discontinue of 116 +/- customer services.

Louisville, KY

Click Here to Order

Harrison County Schools – ATC Storage Building

Harrison County Schools – ATC Storage Building

The project scope includes the construction of a new, pre-engineered metal building with three storage bays, with approximately 1200 gsf. The project includes the demolition of the existing wooden structure, grading, concrete work, asphalt pavement and minimal electrical systems.

Cynthiana, KY

Click Here to View

Meadows-Northland-Arlington Neighborhood Improvement Project, Phase 5D

Meadows-Northland-Arlington Neighborhood Improvement Project, Phase 5D

Construct all associated sanitary and storm sewer piping and structures as shown on the construction plans and specifications for the Meadows-Northland-Arlington Neighborhood Improvement Project, Phase SD. Provide all erosion control measures, concrete sidewalk, curb and gutter, and asphalt paving as required for the project.

Lexington, KY

Click Here to View

Marion-Crittenden County Airport Construct Maintenance Hangar

Marion-Crittenden County Airport Construct Maintenance Hangar

The project consists of furnishing and installing a 100′ x100′ pre-engineered maintenance hangar building and electrical components on a concrete slab with a 100’x80′ concrete apron expansion. Additional components of the project include approximately 830 CYDs of fill; installation of a domestic water line and sanitary sewer; and relocation of airfield electrical wiring. but no airfield lights.

Marion, KY

Click Here to View

Housing Authority of Richmond Willis Manor 13-14

Housing Authority of Richmond Willis Manor 13-14

Willis Manor
A. Door Hardware Replacement
B. Installation of vinyl plank
Work includes providing all items, articles, materials, operations or methods herein listed, mentioned or scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and incidentals as necessary for their completion.

Richmond, KY

Click Here to View

South Hancock Elementary Waste Water Treatment Plant Contract 1 – Equipment Only

South Hancock Elementary Waste Water Treatment Plant Contract 1 – Equipment Only

CONTRACT I – WASTEWATER TREATMENT PLANT REPLACEMENT – EQUIPMENT ONLY

a) 1 L.S. Wastewater Treatment Plant Equipment – 5000 GPO

Hawesville, KY

Click Here to View

South Hancock Elementary Waste Water Treatment Plant Contract 2- Installation

South Hancock Elementary Waste Water Treatment Plant Contract 2- Installation

CONTRACT 2 – WASTEWATER TREATMENT PLANT REPLACEMENT – INSTALLATION

a) 1 L.S. General Grading, Excavation & Backfilling with Seed and Straw
b) 1 L.S. Installation of treatment unit including control pane l and blower
c) 1 EA. Furnishing and installation – Grinder Pump Station
d) 1 L.S. Yard Piping
e) 1 L.S. Electrical Service
f) 1 L.S. Demolition of existing WWTP
g) 1 L.F . Fencing and Gates
h) 1 L.S. Access Road and Site gravel
i) 1 L.S. Furnish & install blower/storage building including concrete floor

Hawesville, KY

Click Here to View

LFUCG Rose Street Bike Lane Project 39-2015 REBID

LFUCG Rose Street Bike Lane Project 39-2015 REBID

Consisting of the construction and/or furnishing of items as listed in the Bid Schedule included in Part III, Form of Proposal, of this document, plus incidentals necessary to complete the work. The work entails construction of approximately 650 linear feet of Sidewalk/Ramps on the east side of Rose Street from Euclid Avenue to Rose Lane and modifying a steam vault.

The scope of construction involves the removal of the existing concrete walk, curb and gutter and the relocation and construction of a new sidewalk. The steam vault manhole will also be relocated.

Lexington, KY

Click Here to View

737 National Ave

737 National Ave

Walker Properties Mixed Use Development

Walker Properties will be the construction manager. Walker Electric will be the electrical contractor Division 16. All items marked are to be furnished and installed by General Contractor. Walker Properties will furnish all appliances, cabinetry and countertops.

Lexington, KY

Click Here to View

Calvary Baptist Church

Calvary Baptist Church

Sealed Bids will be received for the following bid packages:

030-General Trades (previously awarded)
040-Masonry
050-Structural Steel, Joist, Decking and Erection
070-Roofing
082-Aluminum Entrance/Storefron/Aluminum Windows
090-Gypsum Drywall
091-Acoustical Tile Ceilings
092-Resilient Flooring/Carpet & Tile
095-Painting
114-Elevator (Alternate 2)
150-Design Build Plumbing Heating, Ventilation & Air Conditioning (Previously Awarded)
160-Design Build Electrical (Previously Awarded)
Combined Bid Package No 090&091

Glasgow, KY

Click Here to View

City of Corbin – KOWA Kentucky Utility Project

City of Corbin – KOWA Kentucky Utility Project

The work consists of approximately 700 I.f. of 8″, C-900 water line ; 300 I.f. of 8″ gravity sewer; 1,800 I.f. of 6″ pvc force main; and, a 20 hp duplex sewage lift station.

Corbin, KY

Click Here to View

CCK-2024-15 Roach Building 3rd Floor HVAC Replacement

CCK-2024-15 Roach Building 3rd Floor HVAC Replacement

The work includes but is not limited to the replacement of the HVAC system on the 3rd floor of the Roach Buildin

Lexington, KY

Click Here to View

2402.2 PAV A Phase 1F Kitchen/Cafeteria Fit Out RFP TC-020 Food Service Equipment

2402.2 PAV A Phase 1F Kitchen/Cafeteria Fit Out RFP TC-020 Food Service Equipment

Request for Proposals
TC-020 Food Service Equipment

Lexington, KY

Click Here to View

15-48 690 Plan – Timber Ridge & Country Lane Grid-Tie

15-48 690 Plan – Timber Ridge & Country Lane Grid-Tie

Louisville Water Company is requesting Bids for Furnish and install of 1735 +/- linear feet of 8 inch Ductile Iron Pressure Class 350 non restrained joint water main, Furnish and install 90 +/- LF of 8 inch C900 DR18 PVC water main, Significant clearing, Restore the site.

Louisville, KY

Click Here to Order

Charlie Vettiner Park Upper Lake Shelter Construction #3403

Charlie Vettiner Park Upper Lake Shelter Construction #3403

A Price Contract for a portion of Louisville Metro Government’s need for Charlie Vettiner Park Upper Lake Shelter Construction for a twelve (12) month period.

Louisville, KY

Click Here to Order

City of Hartford Sidewalk Improvements – Safe Routes To School

City of Hartford Sidewalk Improvements – Safe Routes To School

Construction of approximately 3,000 L.F. of 4-foot wide concrete sidewalk replacement. Also included as incidental to the work is the installation of approximately 360 L.F. of storm drainage piping and structures.

Hartford, KY

Click Here to View

15-12 Haldeman Avenue Water Main Replacement

15-12 Haldeman Avenue Water Main Replacement

Louisville Water Company is requesting Bids for the installation of 800 +/- linear feet of 8-inch Pressure Class 350 ductile iron water main. Included with the project is the installation of one (1) fire hydrant and the transfer, renewal, relocation or discontinue of twenty-one (21) customer services.

Louisville, KY

Click Here to Order

15-24 Cherokee Road Area Lead Service Renewals

15-24 Cherokee Road Area Lead Service Renewals

Louisville Water Company is requesting Bids for the renewal of lead services on Cherokee Road, Ellwood Avenue and Lucia Avenue. Design information indicates a total of 101 customer service renewals, two (2) customer service discontinues and 17 meter exchanges.

Louisville, KY

Click Here to Order