ACC-UL Student Housing
ACC-UL Student Housing
Louisville, KY
LFUCG – Carver Center Restroom Renovation
Consisting of the items as listed in the Bid Schedule beginning on page P-6, Part 1lI, Form of Proposal, of this document, for the Carver Center Restroom Renovation, 522 Patterson St., Lexington-Fayette County, Kentucky.
Lexington, KY
Owen County Upper Elementary Storm Drainage Repairs
The project scope includes installation of new drainage structures and piping to remediate existing issues with the current storm water system.
Owenton, KY
Ballard Wildlife Management Area Office
Estimate:
$241,294.00
This project, KDFWR Ballard County Office Complex, located at Wildlife Lodge Road, LaCenter, Kentucky in Ballard County, shall generally consist of the new construction of an approximate 2,330 square feet office building with living quarters. The proposed facility is an elevated one story wood framed structure with Pre-engineered wood truss roof framing and a combination of isolated masonry piers and continuous foundation walls atop reinforced concrete slab/grade beams and footings. The project includes all associated Mechanical, Electrical and Plumbing elements such as primary services, fixtures/devices, equipment and all related appurtenances. The project site is being reclaimed from a previously razed structure and shall include certain site improvements such as minor earthwork, select removal, and alterations.
La Center
Green River Correctional Complex
Estimate:
$198,500.00
This project consists of installing a new generator and automatic transfer switch (ATS) to provide emergency back-up power to an existing motor control center. This project also includes disconnecting the emergency feed to an existing ATS and re-feeding the ATS from the new emergency generator. This project will include testing and commissioning of the new generator and ATS prior to moving of existing loads to the generator. This project will include final testing of the new generator and all ATSs after the generator & ATSs installation has been completed and is feeding the existing loads.
Central City
Madison County Schools – Foley and Silver Creek Additions and Renovations
Furnishing of all labor, materials, equipment and services for the following bid packages,
Bid Package #1 Foley Middle School Renovation and Additions
Bid Package #2 Silver Creek Elementary School Renovation
Bid Package #3 Combined Bid; Foley Middle School Renovation and Additions, And Silver Creek Elementary School Renovation
Estimate is $7,000,000 for bid package # 1, $3,500,000 for bid package #2, $10,500,000 for combined bid.
Richmond, KY
Pulaski County Schools – Athletic Improvements
Project consists of: The furnishing of all labor, materials , supplies, tools, equipment, services , etc., necessary for the construction of the Pulaski County Athletic Improvements, for three bid packages listed below:
Bid Package No. I: Pulaski County High School Football Field Synthetic Turf Installation
Bid Package No.2: Southwestern High School Football Field Synthetic Turf Installation
Bid Package No.3: Combined Bid Package – Pulaski County & Southwestern High Schools
Somerset, KY
CCK-2031-15 Front Renoation of Chi Omega House
This project includes the removal and replacement of the front covered porch, replacement and adding of first floor windows, addition of the thru-wall mechanical unit, lighting upgrades and added patio with fencing.
Lexington, KY
2382.0 Repair/Upgrade/Improve Mechanical Systems Old Fine Arts Building Phase 2
This is the second phase of a project to replace and upgrade major mechanical systems in the Fine Arts Building which includes replacement/upgrade of the air handling units and associated temperature controls, exhaust fans and reheat coils. This phase of the project includes replacement exhaust fans EF-2 (and relabeling as EF-9) which serves the 3rd floor restrooms, E-4, E-5, removing E-7 but not replacing, and adding EF-8. It also includes replacing the air handling units serving the Tuska Gallery (S-5) and Guignol Theater (S-4); it also includes replacing additional reheat coils and sprinkling the building.
Lexington, KY
Mountain Comprehensive Health Corporation – Whitesburg Clinic Renovation
Mechanical and electrical work for the renovation of the Whitesburg Clinic, located at 226 Medical Plaza Lane, Whitesburg, KY, which contains approximately 8,000 gross square feet.
Whitesburg, KY
15-59 690 Plan- Forest Hill Hydro-Booster Pumping Station Renovation
Louisville Water Company is requesting bids for the Renovation of an existing underground hydro-booster pumping station including pump and motor replacement, electrical and control work, site work, meter prv work, EPSC, and restoration.
Louisville, KY
2427.0 Relocate Waterline on University Drive
Relocate existing water line between University Drive and existing Blanding Housing Complex.
Lexington, KY
McLean County Schools Central Office – Maintenance And Central Storage Fit-Up
Renovations to provide for new Central Office facility, new Central Storage space and new space for District Maintenance staff. Work to include demolition of existing interior fit-up and new construction consisting of light gauge steel framing , gypsum board, suspended acoustic ceilings, various floor finishes, doors and windows, hardware, paint, casework , etc. , as expected for typical office construct ion. Lighting , Electrical , Mechanical and Plumbing renovations are included, along with modifications to existing automatic fire suppression system . Limited concrete and masonry work is included, along with minor site work. Existing structure is a pre-engineered metal building and is 32,100 square feet , mixed use occupancy, 30,000 sf Storage, 2,100 sf Business. Finished facility will be a mixed-use occupancy; 22,987 sf Storage and 9,113 sf Business . An Alternate Bid will include site work to be performed in addition to Base Bid site work.
Calhoun, KY
Elizabethtown Community and Technical College
Estimate:
$185,000.00
Work under this contract consists of furnishing all labor, materials, equipment and services to re-roof approzimately 16,500 square feet of the Occupational Technical Building (OTB) 100. New roofing membrane shall be a granular surfaced 2-ply SBS modified bitumen over tapered rigid insulation. The work will entail complete removal of the existing modified bitumen roofing system and rigid insulation down to existing metal deck. Existing stainless steel copings and counterflashing shall be salvaged and reused.
Elizabethtown, Kentucky
Education & Workforce Development
Estimate:
$175,960.00
Work of the Project includes removal and replacement of hot water heating boilers located in the basement mechanical equipment room. Work includes but not limited to the following. Demolition of two existing cast iron hot water boilers and associated pumps, vents and piping. Installation of three high efficiency gas fired condensing boilers including associated hot water and natural gas piping. Installation of new metal modular chimney system from boilers through the roof. Electrical wiring of HVAC equipment. Alterations and additions to existing DDC automation system.
Louisville, Kentucky
Augusta Independent School Phase I renovations
Augusta, Kentucky
Roof Replacement Nichols, Community Building Renovation AMP 201
Work will include the following: ROOF REPLACEMENT NICHOLS, COMMUNITY BUILDING RENOVATION AMP 201
Danville, Kentucky
Morehead Utility Plant Board – MSU Lift Station
This contract consists of approximately 350 LF of 8″ gravity sewer, 1 manhole, 1225 LF of 2″ SDR 11 HDPE force main, one duplex sewage pumping station and other appurtenances
Morehead, KY
City of Livingston – Sidewalk Construction Project REBID
The work to be bid upon is described as follows:
Construct approximately 1,840 SY of Concrete Sidewalk and Ramps
Construct 40 LF of 18″ Storm Pipe, 2 Storm Inlets and 1 Headwall
Construct approximately 1,500 LF of Concrete Curb and Gutter Construct 673 SY of Concrete Entrance Pavement
Landscaping, Street Lighting, & Street Furniture
Livingston, KY
2370.0 Construct Bathrooms in Arboretum
The project is construction of foundation systems to support a pre-manufactured toilet structure to be purchased by allowance sum and delivered and installed by others. The project also includes site utility work and the attachment of these utilities to the stub-outs provided by the pre-manufactured toilet building manufacturer. The work generally consists of the following:
• Earthwork
• Concrete foundation systems
• Installation of site utilities, including hook-ups to the building
• Concrete paving
• Seeding of disturbed soil
Lexington, KY
2396.0 Student Center Renovation and Expansion BP01
In general, Bid Package 01 includes the necessary work items and activity required to prepare the site for construction of the new Student Center project. Work includes site protection and security, site clearing and the complete demolition and removal of the existing additions to the original 1938 Student Union building, including hazardous materials abatement. Selective demolition will essentially gut out the original 1938 Student Center building and the 1924 Alumni Gym building and is to also include hazardous materials abatement. The enhancement, relocation and rework of existing site utilities including, central plant heating-cooling systems, storm water and sanitary sewers, electrical and communications ductbank systems and service utilities to the new facility including natural gas, domestic and fire protection water, sanitary sewer, heating, cooling, electrical and communications systems are to be provided and new site utilities to circumvent the new building’s footprint is included in the project. Earthwork including mass excavation, temporary shoring, underpinning and site grading will also be as shown, required and defined in the Project documentation.
Trade Category
TCOlA – General Trades
TCOlB – Abatement, Structure and Selective Demolition
TCOlC – Mass Excavation, Storm and Sanitary
TCOlD – Mechanical Utilities
TCOlE – Electrical and Communications Utilities
Lexington, KY
Hartland Pump Station 1
Consisting of the construction and/or furnishing of items for the Hartland Sanitary Sewer Pump Station No.1 , Lexington-Fayette County, Kentucky.
Lexington, KY
City of Jenkins Waterline Improvement – Phase IV Contract 2 Water Storage Tank
Work is located off of KY3409 in the Dunham area. Work is to include installation of a 100.000 gallon water storage tank. valve vault and other water appurtenances.
Jenkins, KY
City of Jenkins Waterline Improvement – Phase IV Contract 1 Waterlines
Work is located along KY 805 in the Dunham area and along Marshall Branch. Work is to include installation of 8, 6, 4, and 2 inch waterlines, residential meters, and other water appurtenances.
Jenkins, KY
City of Ewing – Railroad Depot Rehabilitation Project
Depot Rehabilitation Project
Ewing, KY