Logan County Archives Rehabilitation Project
Logan County Archives Rehabilitation Project
Project Location: Russellville, Kentucky
Logan County Archives Rehabilitation Project
Project Location: Russellville, Kentucky
RFB-73-16 R Adkins P3 and R Boggs P4 Slides
Estimate: $442,820.00
Estimated Length of Project: n/a (Substantial Completion) + 180 (Final Completion)
This project will address slides related to two previous AML projects in the Fords Branch community of Pike County. The Roger Adkins project will finish the work began under the Roger Akins Slide Phase II project. We will install a gabion wall and steel pile walls in the lower slide. Construct a concrete channel above the slide to direct water around the site and into a trapezoidal gabion ditch down to the county road ditchline. The Robert Boggs portion will address a slide that has formed off a waste area created under Robert Boggs Slide Phase I project. Past projects have addressed the slide area, however, it is now of sufficient size that stripping it to rock is the best long-term solution. We will clean out, and line with tied concrete block mat to provide a stable channel, the clogged channel below the slide. There is no tree disturbance at the Adkins site. Trees will be removed only within the slide are of the Boggs site. The waste areas are the areas designated and used under the Roger Adkins Slide Phase II project. For continued project description see Special Conditions.
Project Location:Pike County, Kentucky
Pikeville Commons Lift Station Relocation Phase 2
This project includes construction of a sanitary sewer lift station and installation of approximately 490 LF of force main
Project Location:Pikeville, Kentucky
RFB-78-16 Heliport Construction
Project Manager Name: Tony Yates
Phone: (502) 782-0338
Email: Tony.Yates@ky.gov
Estimate: $275,000.00
Estimated Length of Project: 60 (Substantial Completion) + 30 (Final Completion)
The project scope includes asphalt paving and concrete applications in the parking areas of the Kentucky Exposition Center to establish a helipad area for a future event.
Project Location:Louisville, Kentucky
Bullitt County Board of Education – Mt Washington Elementary School Addition and Renovation
Project Description:
Furnishing of all labor, materials, supplies, tools, services, etc., necessary for:
ADDITION AND RENOVATION TO
MT. WASHINGTON ELEMENTARY SCHOOL
MT. WASHINGTON, KENTUCKY
Project Location: Mt Washington, Kentucky
RFB-76-16 RE-ADVERTISEMENT OF RFB-48-16
Project Manager Name: Bernard Engelman
Phone: (502) 782-0319
Email: Bernard.Engelman@ky.gov
Estimate: $ 60,830.00
Estimated Length of Project: 11/19/15 (Substantial Completion) + 12/01/15 (Final Completion)
Project scope includes but is not limited to the following: 1. Provide (2) 6 ton HVAC ductless split system heat pumps. 2. Rework ductwork associated with (3) existing VAV boxes. 3. Relocate existing temperature sensors for the existing VAV boxes. 4. Electrical work associated with the other scope items. 5. New temperature control work by the Owner’s temperature controls service contractor as an allowance in bid. 6. Air side test and balance of existing VAV boxes in project area by Commonwealth’s test and balance contractor under separate contract.
Project Location:Frankfort, Kentucky
Breckinridge County Board of Education – Irvington Elementary School Site Work and Utilities Package
The Following Bids are Requested:
SITEWORK AND UTILITIES PACKAGE FOR THE IRVINGTON ELEMENTARY SCHOOL
Project Location:Irvington, Kentucky
Hart County Public Library Addition and Renovation
The following Bids are requested:
BP O 10 – Site, Storm Drainage & Demolition
BP 020 – Asphalt Paving
BP 030 – Concrete and General Trades
BP 074 – Roofing, Sheet Metal, Trim, Soffits and Flashing
BP 080 – Steel Doors, Frames, Wood Doors and Door Hardware
BP 084 -Aluminum Windows and Glazing
BP 092 – Gypsum Board Assemblies and EIFS
BP 093 – Ceramic Tile
BP 095 -Acoustical Panel Ceilings
BP 096 – Resilient Tile Flooring
BP 099 – Painting and Joint Sealants
BP 100 – Miscellaneous Specialties
BP 123 – Plastic Laminate Casework
BP 140 – Hydraulic Elevator
BP 220 – Plumbing and HV AC
BP 260 – Electrical
Project Location:Munfordville, Kentucky
Green Infrastructure Improvement Project #3503
A contract to furnish all labor, material and necessary equipment for the 635 Industry Road Green Infrastructure Improvement project per the departmental specifications, terms and conditions of the Bid.
Project Location:Louisville, Kentucky
LFUCG – Haley Pike Compost Pad Replacement- Phase 2
Project Description:
Project consists of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, of this document, for the Haley Pike Compost Pad Replacement- Phase 2, Lexington-Fayette County, Kentucky.
Project Location: Lexington, Kentucky
Southeast Kentucky Business Park – Speculative (Shell) Building #3 Construction
Project Description:
Construction of Speculative Building #3, 57,590 s.f. nominal, with associated mechanical/electrical and site work.
Project Location:Corbin, Kentucky
-72-16 HVAC Project – G-1 Building
Project Manager Name: David Boggess
Phone: (502) 782-0313
Email: David.Boggess@ky.gov
Estimate: $553,113.00
Estimated Length of Project: 120 (Substantial Completion) + 30 (Final Completion)
The project involves the complete removal of the existing HVAC system which is a VAV box – main Air handler split DX cooling system with hot water reheat coils, one air handler for each area of the building. This will include removal of the existing hot water boiler, dom. Hot water heater, storage tank and DDC controls. In this project will include the installation of four new VRF systems, mechanical ventilation system which includes an energy recovery unit, a dedicated make up air unit, ventilation air ductwork and the installation of three domestic hot water heaters and piping. In base bid controls for all new equipment is required and shall be in contractor’s bid also, the mechanical contractor is to include in their base bid an allowance of $28,000.00 for Innerspace to expand and interface with the new equipment.
Project Location:Frankfort, Kentucky
RFB-60-16 Flooring Replacement Thompson-Hood
Project Manager Name: Frieda Myers
Phone: (502) 782-0328
Email: Frieda.Myers@ky.gov
Estimate: $182,756.00
Estimated Length of Project: 120 (Substantial Completion) + 30 (Final Completion)
The Work of Project is defined by the Contract Documents and consists of the following: Installation of new luxury vinyl plank flooring over the existing resilient sheet flooring in patient care rooms, patient restrooms, corridors, and other patient areas as shown on the Drawings. Additional tasks include: Removal of the existing resilient integral cove base, surface preparation, and installation of new resilient base; the installation of new floor expansion joint covers; and the installation of new porcelain floor and wall tile in one public restroom. Additional tasks include: Removal of existing resilient sheet flooring and wall finishes for installation of new tile; the removal and reinstallation of the existing plumbing fixtures for installation of new tile; the miscellaneous door modifications required for installation of the new flooring; and hardware modifications to one exterior door.
Project Location:Wilmore, Kentucky
Hall of Justice 3rd Floor Envelope Reconditioning #3502
A contract to furnish all labor, material and necessary equipment for the Hall of Justice 3rd Floor Envelope Reconditioning, per the attached specifications.
Project Location:Louisville, Kentucky
2429.0 RFP to Provide Temporary Boiler at the Central Heating Plant
Request for Proposal
UK-1620-16
Provide Temporary Boiler
Central Heating Plant
Project Location: Lexington, Kentucky
CSO 190 Green Infrastructure Project: Phase 1
Description and location of Project: This green infrastructure project involves the construction of several linked infiltration trenches within the Portland Neighborhood along the 17th St corridor. The intersections in the area will be reconstructed to include new sidewalks, trees and plantings. A mandatory pre-bid meeting will be held at the Main Office Building, 700 W Liberty Street , at 1:00 PM Local Time, September 2, 2015. The requirements of MSD’s Supplier Diversity (MBE/WBE Participation) Contractor Compliance Program (CCP) will be fully explained at this meeting. The deadline for a Waiver Request on this Contract is 5:00 P.M. Local Time, September 4, 2015.
Project Location: Louisville, Kentucky
Bullitt County Health Department Annex Building 2nd Story Addition
Project Description:
THE SECOND FLOOR ADDITION to the Bullitt County Health Department Annex Building
Project Location: Shepherdsville, Kentucky
Oldham County Water District – New Office Renovations – Landscaping
New Office Renovations – Landscaping – Oldham County Water District
Project Location: La Grange, Kentucky
CCK-2066-16 Gluck Equine Re-Caulking
Project Description:
The intent of this project is to clean the entire building exterior surface, complete identified surface repairs including the removal/repair of all rust producing elements in the surfaces (800 locations included in the base bid) and stress-produced damages on the building (as well as un-identified and negotiated repairs), remove all existing caulk and prepare the joints to the satisfaction of the Owner, re-caulk with an aliphatic urethane caulk of Owner selected color. Caulk-removal includes, but is not limited to, the caulking the perimeters of door and window frames, perimeter of louvers, flashing reglets of parapet walls, between pre-cast panels (horizontal and vertical), and between curbs and precast panels. The only joints not to be re-caulked are those joints where precast panels are sitting on curbs having a through-wall flashing having no weep-ropes or vents (especially at the foundation wall). The project includes the removal of scum from and the cleaning of all exterior glass surfaces.
Project Location: Frankfort, Kentucky
City of Hurstbourne Annual Paving
Project Location: Hurstbourne, Kentucky
RFB-66-16 Upgrade State Data Center Readiness-Switchgear
Project Manager Name: Brian Cottongim
Phone: (502) 782-0317
Email: Brian.Cottongim@ky.gov
Estimate: $1,612,645.00
Estimated Length of Project: 350 (Substantial Completion) + 21 (Final Completion)
Upgrade State Data Center Readiness – This project consists of multi-phased electrical upgrades for the Commonwealth Office of Technology in Frankfort, Franklin County, Kentucky. Work primarily consists of the addition and replacement of medium voltage and low voltage electrical distribution equipment and cabling. Miscellaneous supporting HVAC and General Trades construction is also included.
Project Location: Frankfort, Kentucky
Johnson Co Public Library Roof Replacement
A General Construction contract including Mechanical, Electrical, and any incidental but related work required to replace a portion of the existing roof on the existing Johnson County Public Library building.
Project Location:Paintsville, Kentucky
CCK-2068-16 Greenhouses Process Storm and Sanitary Sewer Separation
PROJECT DESCRIPTION:
Greenhouses 1,3, 4, 7 b9, & 11 – Construction of new sanitary sewer lines, sand traps and concrete pavement.
Location: Lexington, Kentucky
CCK-2067-16 GTRI Implementation REBID
PROJECT DESCRIPTION:
The work is the GTRI modifications that include additional security, card readers, scanners, doors etc.
Project Location:Lexington, Kentucky
Paradise Park Regional Industrial Authority – Build Ready Site Preparation Project REBID
Project Description:
Work includes earth work for a building pad, approximately 125,000 sq. ft. in size at the Paradise Regional Industrial park.
Project Location:Central City, Kentucky