Project Description: This is a “Vanilla Box” deal and the Landlord will be responsible for the following items: Refer to Sheet T2.0 for a complete list of Land lord responsibilities.
Supply and install (3) HVAC units with all roof work, structure, electrical, & gas piping associated. Supply and install ductwork per drawing Hl.O Install (2) two ADA compliant restrooms per Aspen Floor Plan, complete (undergrounds, framing, plumbing, exhaust, ceilings, lighting, floor drain) 225 amp 3 phase 120/208V electrical service with 42 breaker panel & 24 space sub panel installed per plan. Perimeter walls @ Demising wall taped and sanded ready for Aspen’s finish Concrete floor will be smooth and ready for Aspen’s finish Install, wire and pipe Hot water heater Install sign circuits and time clocks for exterior signage Install ceiling per Aspen’s plans Install overhead lighting per plans Install drinking fountain if needed by local code Install Gas and water service into Aspen’s space.
Housing Authority of Floyd County – Left Beaver Creek Townhouse Digital Security System
Housing Authority of Floyd County – Left Beaver Creek Townhouse Digital Security System
The Housing Authority needs to complete its updating of Left Beaver Creek Townhouse digital security system by replacing (6) existing analog security cameras with megapixel IP digital color cameras, plus adding two (2) IP cameras to the system.
Existing cameras – 6 black white, signal coax, with 12 vdc power
Existing DV recorder – Digital Watchdog, Model # D-UF-16 V Max Flex
Existing wiring – underground, PVC junction boxes, 3″ PVC conduit
Roof Replacement, EIFS Installation, and Storage Building Construction
A. Building Type “C”
1. Replace front porches
2. Replace back porches
3. E.1.F.S.
4. Roof replacement
5. Stone installation
B. Construct attached storage buildings
1. EIFS
2. Stone installation
3. Asphalt shingles
4. Wood frame construction
City of Irvington – Contract 3 -US 60 Sewer Main Relocation
City of Irvington – Contract 3 -US 60 Sewer Main Relocation
The program of work for which bids are to be submitted consists of approximately 2200 LF of gravity sewer main and 5 new manholes, and all related appurtenances
Tenant Improvements for the Craftsman Training Program at KCAAH ReBid #3475
Tenant Improvements for the Craftsman Training Program at KCAAH ReBid #3475
Louisville, KY
To furnish all labor, material and necessary equipment for Tenant Improvements for the
Craftsman Training Program at the KY Center for African American Heritage ReBid.
Madison County Utilities District – Highway 52 Waterline Relocation
Madison County Utilities District – Highway 52 Waterline Relocation
Highway 52 Waterline Relocation
• Relocation of approximately 1250 L.F. of 6-inch Ductile Iron and PVC water line and appurtenances.
• Reconnection of 11 water meters using l” copper and l” PE line
Court Avenue extension from Missouri Avenue to Woerner Avenue.
The major work for which bids are to be received consists of the construction o the items listed below:
Asphalt roadway with under drains and parking areas
Milling asphalt areas
Thermoplastic striping and painted striping
Concrete curb and gutters and concrete curbs
LED street lights and commercial metering pedestal
Storm sewer systems and structures
Concrete sidewalks
Landscaping, sod, mulch
Street signage
Unclassified excavation and disposal of material at landfill
Demo asphalt pavement, concrete sidewalks, drainage systems, landscape areas, etc
Segmental retaining wall
Drip irrigation system
Erosion control
Utility duct banks
Concrete wheel stops
Maintenance of traffic
City of Frankfort – 2015 Public Works Department Unit Price Concrete Projects
City of Frankfort – 2015 Public Works Department Unit Price Concrete Projects
Project Description:
General concrete sidewalk and curb maintenance and construction, new sidewalk and curb construction, and miscellaneous storm sewer construction to be performed for the City of Frankfort on an as needed, cafeteria style project scope with bid unit prices to remain in affect for a period of one-year from the stated bid opening.
Middletown Industrial Park WQTC Elimination project
Middletown Industrial Park WQTC Elimination project
This Contract provides for the installation of approximately 241 linear feet of 15-inch sewer, 681 linear feet of 12-inch sewer, 783 linear feet of 12-inch CIPP lining, 6 sanitary manholes, decommissioning of the Middletown Industrial Park WQTC, erosion control, and appurtenant work. The project is generally located between Middletown Industrial Boulevard and Aiken Road in the City of Middletown.
Housing Authority of Carrollton – Modernization Project
Housing Authority of Carrollton – Modernization Project
The project consists of:
Water Heater Replacement at site KY057-02A. Site Improvements and Facade Upgrades at site KY057-03. Bathroom Upgrades and Water Heater Replacement at site KY057-04B.
The Scope of Work includes the following:
Bid Package A – Replacement of Boilers & Gas Meters
Bid Package B – Exterior Security Camera System Site wide
Bid Package C – Chain-Link Fencing & Site Drainage Improvements
Provide all labor, tools, equipment and materials to construct trail, bridge abutments and placement of bridge. Bridge is currently located onsite and will be provided for use at Wellington Park, 565 Wellington Way, Lexington, KY 40503
This contract consists of approximately 240 LF of 1 O” waterline, 4,530 LF of 8″ waterline, 2,800 LF of 6″ waterline, 1,790 LF of 4″ waterline and 4,905 LF of 3″ waterline, 4,350 LF of 1″ and 2″ service tubing, 2,000 LF of bored and open cut encasement, 23 ea. gate valves, 12 ea. blow off assemblies, 37 meter settings or re-connections, and all necessary fittings and appurtenances. This is a relocation of existing facilities. No rock trenching will be allowed on this project.