Bowling Green-Warren County Regional Airport – Airfield Pavement Marking Improvements
Bowling Green-Warren County Regional Airport – Airfield Pavement Marking Improvements
Project Description
Bowling Green-Warren County Regional Airport intends to engage a qualified contractor to paint airfield markings on Runway 3-21 and associated taxiways at the Bowling Green Warren County Regional Airport. The work is to be completed before the end of the 2015 calendar year if possible.
Town of Clarksville – Clarksville Aquatic Center Redevelopment
Town of Clarksville – Clarksville Aquatic Center Redevelopment
Project Description:
This project includes the redevelopment of the Family Aquatics Center pool to a lap pool, slide pool and new splash pads as well as a new shelter, deck areas, lighting, utilities, landscaping, other park amenities, and all other items necessary for construction of a complete project.
Project Description:
Consisting of the construction and/or furnishing of items in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, and as indicated in the construction documents and drawings, for the Replacement Fire Station No. 2 located in Lexington-Fayette County, Kentucky.
This project consists of the replacement of the swimming pool filter with a new hi-rate sand filter system complete with pressure gauges, and manual backwash valve assemble, installation of a new 15 hp pump with new controls and wiring hook-up, installation of a new surge tank located outside the building, installation of a new backwash retention tank located outside the building, installation of a new chemical controller, installation of a new mechanical room ventilation fan in new location, installation of a new flow meter, associated wiring and light replacement in the mechanical room, and new piping connecting equipment in the mechanical room. Major components of the project include the following: HI-RATE SAND FILTER SYSTEM AND PUMP and SURGE TANK AND BACKWASH TANK.
Project Manager Name: James Sherrard, AML Phone: (502) 564-2141 Email: James.Sherrard@ky.gov
Estimate: $ 60,900.00
Estimated Length of Project: N/A (Substantial Completion) + March 31, 2016 (Final Completion)
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 10 acres of mine land in Whitley County, Kentucky. The work will consist of earthwork, gradework, and revegetation of 1 bond forfeiture permit. For continued project description see Special Conditions.
This project will address two landslides that are affecting multiple residents and a county road in Johnson County. The project will construct pile & lagging walls to stop the movement of the slides along a county road and a residence. The material below the walls will be regraded to a stable configuration. Drainage controls will be improved and installed to collect and transport water away from the reclaimed areas. Onsite waste areas are designated. They are areas that have already been filled by residential development. Trees will be cut only in one unstable slide area; no trees will be cut outside the unstable areas. For continued description, see Special Conditions.
Estimated Length of Project: 90 (Substantial Completion) + 30 (Final Completion) Rehabilitation of existing sanitary sewer lines located adjacent to Freedom Hall on the Kentucky Exposition Center site. The rehabilitation shall be done by the installation of Cured-In-Place Pipe (CIPP) method. The existing sanitary sewer pipes include approximately 2,150 lineal feet of 8″, 10″, 12″ and 18″ pipe.
NKCC-01-16 Bid Package #1- HIC Site Utility Relocation/ Underground Detention System
NKCC-01-16 Bid Package #1- HIC Site Utility Relocation/ Underground Detention System
Project Description:
The project is generally described as the Northern Kentucky University, Health Innovations Center (HIC) Founders Hall Renovation. The project is located in Highland Heights, Kentucky, on approximately 3.0 acre site on the NKU campus, east of Kenton Drive, west of Nunn Hall and directly north of Griffin Hall. The project will include the construction of the new Health Innovations Center (HIC) building and renovation of the existing Founders Hall Building. The HIC building will consist of a new 95,000 sf four-story steel frame building with the option to shell a 5th floor of approximately 12,000 sf. The Founders Hall renovation is a 106,000 sf complete interior gut and renovation of the existing 5 story concrete-structured building.
Letcher County Water and Sewer District – Water System Improvements KY 15 Letcher/Knott Interconnect
Letcher County Water and Sewer District – Water System Improvements KY 15 Letcher/Knott Interconnect
Project Description:
The work to be bid is described as follows :
CONTRACT 519-14-01, WATER SYSTEM IMPROVEMENTS KY 15 Letcher/Knott Country Interconnect Approximately 8,360 L.F. of 12-inch water distribution main, directional bore, associated appurtenances, and 140 feet of 20-inch road bore and steel casing pipe.
LFUCG – Picadome Golf Course Sinkhole Retrofit and Stream Restoration
LFUCG – Picadome Golf Course Sinkhole Retrofit and Stream Restoration
Project Description:
Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, of this document, for the Picadome Golf course Sinkhole Retrofit and Stream Restoration, Lexington-Fayette County, Kentucky.
Project Description:
This package involves the Interior Fit-Up work for the Phase 1 G 3 PAV A/5 PAV H Renovations. The work will be performed under contract with the Construction Manger, Turner Construction Company. Separate bids for this project shall be submitted for the following work categories: 3 PAV A/5 PAV H
Cedar Creek WQTC Influent Pump Station Gate Repair and UV Gate Replacement
Cedar Creek WQTC Influent Pump Station Gate Repair and UV Gate Replacement
Project Description:
Description and location of Project: Repair of three (3) existing 36-inch sluice gates, frames and stems; installation of new 12-inch and 36-inch sluice gates, frames and stems; installation of four ( 4) electric actuators with floor stands; installation of one (1) manual actuator with floor stand; removal and disposal of two (2) existing automatic level control gates and actuators; installation of two (2) 32- inch sluice gates; installation of electrical and instrumentation for gate operation; and miscellaneous work.
Portland Elementary School Safe Routes to School Project #3557
Portland Elementary School Safe Routes to School Project #3557
Project Description:
A contract to furnish all labor, material and necessary equipment for the Portland
Elementary School Safe Routes to School Project, per the attached specifications.
The Frank Eck Phase I AML Reclamation Project consists of eliminating drainage issues which have caused flooding problems for residents along Flat Creek road in southeastern Hopkins County. Work on the project will consist of the installation of drainage pipes with headwalls, construction of rip rap and concrete lined ditches, cleanout of existing roadside ditches and installation of one drop box. Upon completion of all construction work, all areas will be re-vegetated. For continued project description see Special Conditions.
Clark County Board of Education – Clark County Preschool – Phase 1 Vehicular Development
Clark County Board of Education – Clark County Preschool – Phase 1 Vehicular Development
Project Description:
This project scope includes the installation of gravel base to be used for traffic approximately 600′ long on existing school property and installation of new asphalt parking areas at Conkwright Middle School.
Knott County Water and Sewer District – Red Fox Waterline Project – Contract 26 and 26A
Knott County Water and Sewer District – Red Fox Waterline Project – Contract 26 and 26A
Project Description:
Contract 26 will consist of the construction of approximately 76,700 linear feet of 12, 6 and 4 inch waterlines and the installation of one (1) hydro-pneumatic pump station and one (1) booster pump station. The Contractor shall furnish all materials, equipment and labor necessary to complete the construction of the waterline, appurtenances and reclamation.
Contract 26A will consist of the construction one (1) 250,000 gallon water tank. The Contractor shall furnish all materials, equipment and labor necessary to complete the construction of the water tank, appurtenances and reclamation.
Project Description:
A contract to furnish all labor, material and necessary equipment for the Metro Hall Annex
Window Repairs, per the attached specifications.
Project Description:
This project will address drainage issues (LB# 9472) at a site in South Williamson. The site consists of drainage from deep mine works that flow across the site. The majority of the surface drainage goes into a rectangular concrete ditch; however, water still saturated the hillside in addition to leaking through the diversion berm. During the winter, the collected water flows along the driveway and walkway creating dangerous, thick sheets of ice. The water pooling behind the home poses a threat to the residence and serves as a mosquito breeding ground in the summer months. We will collect the surface water and direct it to the existing concrete ditch via a concrete ditch and 24” pipes with dropboxes. Subsurface water will collected in subdrains along the houseseat and behind a nearby shed. All these waters go to the existing concrete ditch. The waste material has been used by several other DAML projects. No trees will be disturbed. We will temporarily relocate (and replace in-kind) some structures including a ramp, part of a deck, and potentially a metal garage awning. For continued description, see Special Conditions.
Project Description:
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 40.4 acres of mine land in Muhlenberg Co. covering 20.4 acres of acidic materials from 20 acres of borrow area, grade to create positive drainage, install ditches, apply roadway stone to access road as needed, and revegetation on 1 bond forfeiture permit(s) For continued project description see Special Conditions.
CCK-2080-16 Anderson Hall Tower Renovation of Lab 59A
CCK-2080-16 Anderson Hall Tower Renovation of Lab 59A
Project Description:
Renovation of Lab 59A and ancillary rooms, work include finishes upgrades to walls, ceilings and floors, with new doors and windows. Work also includes upgrades to plumbing/utilities/trench grating, HVAC ductwork, and electrical power/lighting.
Project Description:
Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-7, Part 111, Form of Proposal, of this document, for the Boiler Replacement – Government Center, Lexington-Fayette County, Kentucky.
City of Pikeville – Mullins Addition Waterline Replacement Project
City of Pikeville – Mullins Addition Waterline Replacement Project
Project Description:
This project includes replacing approximately 900 LF of 12′. DI Water Main and 600 LF of 6″ DI Water Main in Mullins Addition Community. The project will also include the reconnection of all services.
Installation of Fire Sprinkler System for the LMPD K9 Building #3554
Installation of Fire Sprinkler System for the LMPD K9 Building #3554
Project Description:
A Fixed Contract to furnish all labor, material and necessary equipment for Installation
of Fire Sprinkler System for the LMPD K9 Building
Fayette County Health Department – Third Floor Office Renovation
Fayette County Health Department – Third Floor Office Renovation
Project Description:
The scope of work includes the renovation of the third floor administrative offices at the Health Department’s main building, 650 Newtown Pike in Lexington, Kentucky. In general the project work includes removal and disposal of full height demountable partitions, removal and disposal of existing carpet tile, removal and disposal of hard wall partitions, removal and disposal of ceiling tile and grid where required to accommodate new hard wall offices, removal or relocation of existing lighting and electric outlets, HVAC diffusers, and limited replacement of toilet fixtures and fittings. New construction includes limited installation of new acoustic ceilings and grids, new hard wall partitions, new doors and hardware, new carpet tile, new porcelain flooring in toilet rooms. painting, new toilet partitions, replacement of selected toilet fixtures, fittings and accessories, new electric outlets, new exhaust fans, etc. Refer to Contract Documents for complete scope of project work.
Extended Project Description: The Work consists of site and building demolition, wall and floor construction for the installation of a three-story hospital grade elevator. Work also includes limited upgrade of electrical service. All work shall fully comply with applicable codes and regulations for psychiatric hospitals.