Sealed proposals will be received at the office of the Louisville and Jefferson County Metropolitan Sewer District until 2:00 PM, local time, May 25, 2017 for the following:
PURCHASE OF CALIBRATION GASES
Breathitt County Water District – KY 2436 Airport Road Waterline Extension
Breathitt County Water District – KY 2436 Airport Road Waterline Extension
PROJECT DESCRIPTION:
Work is to include in stallation of approximately 600 LF of 4-inch, 5,300 LF of 3-inch waterline, 150
LF of directionally drilled waterline and other appurtenances, Installation of a hyd ro pneumatic
station and bladder tank and enclosure, and 2 services.
Carroll County Memorial Hospital – New Outpatient Building
Carroll County Memorial Hospital – New Outpatient Building
Please Note: Addendum 02 has changed the Bid Date
PROJECT DESCRIPTION:
The nature, scope, and major
elements of the work – a 12,924 g.s.f. building addition to Carroll County Memorial Hospital
to house outpatient functions including a family practice clinic, a specialty clinic, rehab gym, and main lobby with central registration. Work includes associated architectural, mechanical,
electrical, plumbing, structural and site design. Site work Includes a new front and rear
parking lot.
The project is the consists of exterior repairs for Henry Ward Lodge and nine guestroom buildings. Repair work involves the following:
1. Painting of guardrails and handrails, including supporting steel channel and angle brackets.
2. Repair of exterior insulation and finish system, and application of weatherproof coating.
3. Repairing and painting of cement plaster soffits.
4. Masonry repair.
5. Repairing and painting of miscellaneous wood trim.
6. Painting of underside of concrete decks.
7. Painting of upper deck ceilings.
8. Repairing and painting of upper deck privacy walls.
9. Construction of new lower patio privacy walls.
Lexington-Fayette Urban County Airport Board – TSEP Phase IV-Construct New ARFF Facility
Lexington-Fayette Urban County Airport Board – TSEP Phase IV-Construct New ARFF Facility
The Project consists of the Construction of a New ARFF Facility; Lowering
the Terminal Concourse Roof; Constructing Associated Roadway Pavements and a Portion of Taxiway A. Significant items of work include:
P-152 EXCAVATION 12500 CY
P-156 EROSION CONTROL BLANKET 2800 SY
P-209 AGGREGATE BASE COURSE 17500 SY
P-304 CEMENT TREATED BASE 1800 SY
P-501 PORTLAND CEMENT CONCRETE 8350 SY
D-754 GUTTER AND PAVED DITCH 1300 LF
L-108 UTILITY AND CONTROL CABLE 3000 LF
L-110 DUCTS AND CONDUIT 5700 LF
T-901 TURFING 5.4 AC
SP. NO. 1 ARFF BUILDING 1 LS
SP. NO. 1 TERMINAL CONCOURSE MODIFICATIONS 1 LS
SP. NO. 3 RETAINING WALL 156 LF
SP. NO. 5 FIBER OPTIC 30400 LF
SP. NO. 11 PERMEABLE INTERLOCKING CONCRETE 2725 SY
SP. NO. 12 TRACKLESS
BI-FOLDING GATE 1 EA
In addition to these major Items of work, minor items of work that may require specialty materials or
construction methods would include but not be limited to:
Pavement Removal
Erosion Control
Bituminous Paving
Pavement Marking and Pavement Marking
Underdrain
Precast structures
Fencing
Utilities – Electric, Water, Telephone, Gas & Sanitary
Bell County Detention Center – Smoke Evacuation System Upgrade
Bell County Detention Center – Smoke Evacuation System Upgrade
PROJECT DESCRIPTION: Furnish all labor and materials to complete the Bell County Detention Center Smoke Evacuation System Upgrade at the Bell County Detention Center
The construction contract
shall be a single (all trades) contract.
Description and location of Project: This unit based construction order is for 15-inch, 12-inch, 10-inch, and paved “v” ditch installation along Parkwood Road in Metro Council District 12.
CCK-2229-17 Research Lab #3 – Elevator Modernization
CCK-2229-17 Research Lab #3 – Elevator Modernization
PROJECT DESCRIPTION:
This project is for the modernizing and upgrading of the elevator currently in service in the Research lab #3
located at 700 S. Limestone on the University of Kentucky Central Campus
Bid Date Change!! Addendum#3 changes bid date to 6/6/17
PROJECT DESCRIPTION:
The Morgan County Board of Education will receive bids to furnish all labor and materials to complete the:
The Morgan County High School
150 Road to Success
West Liberty, Kentucky 41472
The Project has 3 Phases each with Separate Final Completion dates as noted below.
Phase 1 – New Road and 103,000 sf. School – beginning July 1, 2017 thru December 1, 2018
Phase 2 – Renovation and Additions to the Existing Gymnasium. 21,000 total sf. – beginning March 1, 2018 thru November 1, 2018.
Phase 3 – Demolition of Existing School and Site Work – beginning January 1, 2019 thru June 1, 2019.
Mt. Sterling Water and Sewer – East & West High Street Sewer Line Replacement
Mt. Sterling Water and Sewer – East & West High Street Sewer Line Replacement
PROJECT DESCRIPTION:
These projects consist of
approximately 1,500 feet of 8″ SDR 35 gravity sewer, related fittings and accessories as well as reconnection of existing service laterals.
The Bid will consist of the following work: Install 693 L.F. of various sizes (12″ to 54″) RCP, and 49 L.F. various size (8″ to 18″) D.I.P for storm water improvements. Install 27 L.F. of
6’x5′. and 8 L.F. of 4’x3′ Box Culverts. 181 L.F. of Trench Drains, 48 L.F. of earth ditches, 187 L.F. of Paved Ditch and 221 LF. of Earth embankment, and 385 L.F. of Bank Stabilization. Additional work will include 12 water and sewer laterals relocations, 40 L.F. of 6″ Water Main Relocation. Work will include manholes, junction boxes, and Headwalls, Fences Replacements, asphalt and concrete replacement and other related appurtenances.
Lexington-Fayette Urban County Airport Board – Blue Grass Airport Rental Car Facilities
Lexington-Fayette Urban County Airport Board – Blue Grass Airport Rental Car Facilities
Please Note: Addendum 04 has changed the Bid Date
PROJECT DESCRIPTION:
The project consists of Construction of new rental car vehicle storage lots,
buildings and fuel stations. Demolition of existing rental car facilities. All associated
site work such as grading, utilities, parking lots and roadway improvements.
CALL 121 CONTRACT ID 171020 JEFFERSON COUNTY TGR 0311 (037) : DIXIE HIGHWAY(US-31W) FEDERAL TIGER GRANT COMMITMENT (MP 14.488) PEDESTRIAN ACCESS/SAFETY IMPROVEMENT AND ACCESS CONTROL ON US-31W (DIXIE HIGHWAY) FROM HEATON ROAD MP 14.488 NORTHWARD TO HERBERT AVENUE MP 14.969. (THIS PROJECT IS PART OF THE KYTC FUNDING COMMITMENT TO LOUISVILLE METRO FEDERAL TIGER GRANT PROJECT). (MP 14.969) GRADE & DRAIN WITH PCC PAVEMENT. SYP NO. 05-00478.01.
CALL 109 CONTRACT ID 171217 JACKSON COUNTY STP BRO 4211 (047) : MANCHESTER TO MCKEE ROAD (US 421) (MP 13.919) REPLACE BRIDGE ON US 421 OVER PIDGEON ROOST CREEK AT INTERSECTION WITH WATER STREET E (CS 1006) (MP 13.959), A DISTANCE OF 0.11 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 11-01090.00.
CALL 108 CONTRACT ID 171211 OHIO COUNTY STP BRZ 0203 (337) : CLAY LEACH LANE (CR 1194) (MP 0.029) REPLACE BRIDGE ON CR 1194 OVER THREELICK CREEK; 0.15 MI WEST OF JCT CR 5172 (MP 0.129), A DISTANCE OF 0.10 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 02-0177.00.
Project Location: Ohio County, Kentucky
171018 Perry Call 107
Kentucky Transportation Cabinet
CALL 107 CONTRACT ID 171018 PERRY COUNTY STP BRO 5375 (045) : BULAN-HINER ROAD (KY-1146) (MP 2.679) REPLACE BRIDGE ON BULAN-HINER ROAD(KY-1146) OVER TRACE FORK AT JCT WITH KY-476. (MP 2.712), A DISTANCE OF 0.05 MILES. BRIDGE REPLACEMENT. SYP NO. 10-01102.00.
CALL 106 CONTRACT ID 171215 LEE COUNTY STP 5262 (060) : WEST MAIN STREET (KY 52) (MP 11.780) CONSTRUCT SIDEWALKS, CURB AND GUTER ON KY 52 FROM DOWNTOWN BEATTYVILLE TOWARD IRVINE (MP 12.260), A DISTANCE OF 0.47 MILES. ASPHALT SURFACE WITH GRADE & DRAIN. SYP NO. 10-08852.00.
CALL 100 CONTRACT ID 171019 PIKE COUNTY NHPP 0806(044) : POND CREEK BRIDGE(US-460) POND CREEK BRIDGE, US-460/KY-80 FROM KY-195 TO EAST OF POND CREEK, SECTION 6A-2., A DISTANCE OF 2.18 MILES. BRIDGE WITH GRADE & DRAIN. SYP NO. 12-00263.63.
The new 2-story, Educational Alliance Center will be constructed on the north side of the Middlesboro Campus for Southeast KCTC. The base bid building is approximately 27,000sf. LEED certification will be pursued for this project.
The building will include: A Nursing department, an Aviation lab, Assembly areas, Internet café, general and computer classrooms, faculty offices, administrative and supports spaces. The project will also include a 2-stop hydraulic elevator.
The foundation will include a 10-inch thick concrete slab, concrete grade beams supported by auger-cast piles, all steel reinforced. The second floor will be framed with precast concrete planks supported by reinforced masonry walls. The equipment platform will be a composite concrete/metal deck. The roofs steel-framed.
For HVAC, chilled water will be provided by air cooled chillers, HVAC hot water will be provided by gas fire boilers. Classroom and multipurpose areas will be served using fan coil units. Offices and other small areas will be served by a central VAV air handling unit and single duct terminal units with reheat coils. Outside air will be fed to the system using a central dedicated outside air unit.
Existing site infrastructure will be utilized to extend utilities to the new building. The service into the building will be 277/480V/three-phase. The internal distribution system will provide 277/480V/three-phase power to equipment loads, 277V power to lighting loads, and 120V power to receptacle loads. The project will include a fire alarm system, telecommunications systems, and rough-in for Owner-provided AV and security systems.