New Warren County Elementary School – Phase 2

New Warren County Elementary School – Phase 2

Post Bid Addendum 01 has rebid the project. For 025-Landscaping & 075 (TPO) Roofing and Sheet Metal

Please Note: Post Bid Addendum 01 has changed the Bid Date

The following Bids are requested:
1. The Warren County Board of Education will receive sealed bids for the following bid packages:
025 – Landscaping
075 – (TPO) Thermoplastic Polyolefin Roofing & Sheet Metal

There are major material items within the various Bid Packages, which will be bid through the respective
Contractor but purchased direct by the Owner. Interested material suppliers should contact the Construction
Manager (Alliance Corporation) for the names of contractors who have expressed an interest in the Bid Packages involved.

Project Location: Bowling Green, Kentucky

More Details

Housing Authority of Winchester – Modernization Project

Housing Authority of Winchester – Modernization Project

PROJECT DESCRIPTION:
Plank Vinyl Flooring, Bathroom Flooring Replacement,
Accessible Conversion, Step & Handrail Replacement, A/C
Replacement & Concrete Walks

Project Location: Winchester, Kentucky

More Details

Scott County Fiscal Court – Moores Mill Road Culvert Replacement Project

Scott County Fiscal Court – Moores Mill Road Culvert Replacement Project

PROJECT DESCRIPTION:
The project consists of replacing a pipe crossing with reinforced concrete box culvert on Moores
Mill Road in Scott County, Kentucky and reconstructing the approaches and installing guardrail.

Project Location: Georgetown, Kentucky

More Details

CCK-2242-18 Chandler N051 & N053 Nuclear Camera and CT Control Room

CCK-2242-18 Chandler N051 & N053 Nuclear Camera and CT Control Room

PROJECT DESCRIPTION:
The renovation of N051 & N053 for Nuclear Camera and CT Control Room in Chandler Hospital.

Project Location: Lexington, Kentucky

More Details

Prestonsburg City’s Utilities Commission – US 23 South Sanitary Sewer Collection Project-Contract 1

Prestonsburg City’s Utilities Commission – US 23 South Sanitary Sewer Collection Project-Contract 1

PROJECT DESCRIPTION:
The work to be bid consists of:
The scope of work consists of the installation of approximately 30,000 LF of 12″ PE DR11 Force Main and
2,500 LF of 4″ PE DR11 Force Main. The project will also include the installation of a new Pump Station at
Allen, KY and the up-grade of the existing R&S Pump Station near Banner, in Floyd County, Kentucky. The
Contractor shall furnish all materials, equipment and labor necessary to complete the installation of force main
sewer lines and appurtenances. Time of completion for PCUC US 23 South Sanitary Sewer Collection Project is
365 calendar days. Liquidated damages will be assessed at $1,000 per calendar day.

Project Location: Prestonsburg, Kentucky

More Details

CCK-2241-18 Integrative Medicine & Health Clinic

CCK-2241-18 Integrative Medicine & Health Clinic

Please Note: Addendum 4 has changed the Bid Date

PROJECT DESCRIPTION:
The renovation of approximately 3,000 square feet of the 3rd Floor of Whitney Hendrickson Building. The renovation will provide Treatment rooms, consult rooms, a multipurpose room, office and lobby/reception.

Project Location: Lexington, Kentucky

More Details

Sprinkler System Design & Installation – Fire Department – IFB# 170124

Sprinkler System Design & Installation – Fire Department – IFB# 170124

The Louisville/Jefferson County Metro Government (“Metro Government”) is now accepting Bids for design and installation of a sprinkler system at Engine 22 / Truck 4 located at 3228 River Park Drive.

Louisville Metro Government uses Bonfire portal for accepting and evaluating proposals digitally (https://louisvilleky.bonfirehub.com/portal). Bidders must submit all pages of bid document through Bonfire.

Project Location: Louisville, Kentucky

More Details

RFB-270-17 McDaniel Scoggin Building Flooring Renovation

RFB-270-17 McDaniel Scoggin Building Flooring Renovation

Project Manager Name: Frieda Myers
Phone: (502) 782-0328
Email:
Frieda.Myers@ky.gov

Estimate:
$ 83,139.00
Estimated Length of Project:
August 5, 2017 (Substantial Completion) + August 20, 2017 (Final Completion)

Project includes upgrades to Scoggan and McDaniel Buildings at the Kentucky School for the Blind. New VCT in selected rooms and corridors.
The Scoggan Classroom Building was originally constructed in 1963 and is a 40,669- square-foot facility. The McDaniel Classroom Building was originally constructed in 1985 and is a 23,774- square-foot facility.

Project Location: Louisville

More Details

City of Versailles – Old Dry Ridge Road Sidewalk Project

City of Versailles – Old Dry Ridge Road Sidewalk Project

PROJECT DESCRIPTION:
The project consists of construction of a 5 foot sidewalk along the north side of Old Dry Ridge Road, beginning near the intersection of KY 33 and Old Dry Ridge Road, continuing
across Rose Ridge Road, and ending at the intersection of Cedar Ridge Lane, which is the
eastern terminus of Old Dry Ridge Road. The new sidewalk will tie to existing sidewalks at all three intersections and requires no ADA access accommodations since the existing walks already include ramps and the new sidewalk crosses two field entrances at-grade.

Project Location: Versailles, Kentucky

More Details

Knox County Detention Center – Special Inspections RFB

Knox County Detention Center – Special Inspections RFB

Please Note: Addendum 2 has changed the Bid Date

Special Inspection and Testing will include the following categories:
1. Inspection of Fabricators
2. Concrete Construction
3. Masonry Construction
4. Steel Construction
5. Fire-Resistant Penetrations and Joints

Project Location: Barbourville, Kentucky

More Details

UK-1774-18 Replace Greek Housing – Alpha Gamma Rho Fraternity Design/Build Services-2384.0

UK-1774-18 Replace Greek Housing – Alpha Gamma Rho Fraternity Design/Build Services-2384.0

PROJECT DESCRIPTION:
The University of Kentucky desires the services of an experienced and highly qualified Design/Build firm to provide all final design and construction services for an approximately 21,500 Square Foot AGR Fraternity House to be located in the University of Kentucky Greek Park near the Campus of the University of Kentucky, in Lexington, Kentucky at the corner of Rose Lane and Woodland Avenue. House includes 17 2-bed units and 2 4-bed ADA units for a total of 42 beds, supported by living and study areas, as well as an in-house kitchen and dining area to serve residents of the house.

The design/build firm selected would provide all design and construction services necessary to construct the facility in accordance with the guidelines, standards and limitations contained in the Request for Proposal.

Project Location: Lexington, Kentucky

More Details

RFB-264-17 Devert Owens Building HVAC Replacement

RFB-264-17 Devert Owens Building HVAC Replacement

Project Manager Name: David Marshall
Phone: (502) 782-0332
Email:
David.Marshall@ky.gov

Estimate:
$700,000.00
Estimated Length of Project:
190 (Substantial Completion) + 31 (Final Completion)

This project is a phased replacement of existing HVAC systems throughout a building that has administration offices and classrooms. New systems include self-contained classroom air conditioners, variable speed DX gas fired rooftop units for small zones, and a larger VAV DX gas fired rooftop unit that serves many zones with VAV boxes with hot water reheat. An alternate for boiler and hot water pump replacement is included. All new BAS controls are required for the new systems.
Project includes new door for roof access and new ceilings in areas where VAV boxes and new ductwork are being installed. Electrical and fire alarm work is associated with the new HVAC system. Existing lighting will remain and be reinstalled in new ceilings as required.
Structural improvements are required for new rooftop unit support.

Project Location: Hazard

More Details

CCK-2240-18 Kentucky Clinic Front Doors

CCK-2240-18 Kentucky Clinic Front Doors

PROJECT DESCRIPTION:
This Project is to refurbish the Front Doors at Kentucky Clinic

Project Location: Lexington, Kentucky

More Details

RFB-269-17 Willie Johnson Drainage AML

RFB-269-17 Willie Johnson Drainage AML

Estimate:
$177,727.50
Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

The site is located along Bowen Lane along Rockcastle Creek. It is located off of Kentucky Highway 3 in Inez, Martin County, KY at coordinates N 37° 55’ 0.60”, W 82° 32’ 55.45”. The project consists of constructing a 6 foot high Non-reinforced block wall and 190 linear feet of sub-drain behind the Willie Johnson residence. A sub-drain will be placed behind the wall to help catch water that is saturating below Bowen Lane from a previous OSM reclamation project and an additional sub-drain will be placed in front of the wall. A pipe will be replaced under Bowen Lane and all sub-drains will tie into pipes until an elevation below the Johnson residence. At this point the drainage will be conveyed across the bottom land via a Concrete Block Tied Mat Ditch where it will enter into Rockcastle Creek. Waste material excavated from the project will be back-stowed above the wall to the extent practical, with additional waste being placed in a waste area along a highwall that was previously used by a Kentucky AML High Priority Project off of Johnson Bottom Road to the north (N 37° 55’ 28.44”, W 82° 33’ 3.09”).
During the process of these construction activities no trees over 3 inches in diameter at breast height will be damaged or disturbed.

Project Location: Martin

More Details

RFB-253-17 Geo-Thermal Wellfield Package Agricultural, Health and Career Center

RFB-253-17 Geo-Thermal Wellfield Package Agricultural, Health and Career Center

Project Manager Name: Dwayne
Brown
Phone: (502) 782-0315
Email: Dwayne.Brown@ky.gov

Estimate:
$591,460.00
Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

Project Description: In conjunction with the construction of a 52,050 square foot, two story classroom building being constructed under a separate contract, supply and install the geothermal wellfield.

Project Location: Hopkinsville

More Details

RFB-241-17 Hydraulic Elevator Package Agricultural, Health and Career Center

RFB-241-17 Hydraulic Elevator Package Agricultural, Health and Career Center

Project Manager Name: Dwayne
Brown
Phone: (502) 782-0315
Email: Dwayne.Brown@ky.gov

Estimate:
$132,000.00
Estimated Length of Project:
180 (Substantial Completion) + 30 (Final Completion)

In conjunction with the construction of a 52,050 square foot, two story classroom building being constructed under a separate contract, supply and install the machine room-less hydraulic elevator is being performed under a separate contract.

Project Location: Hopkinsville

More Details

Lexington Fayette Urban County Housing Authority – Glen Arvin 10 Townhomes

Lexington Fayette Urban County Housing Authority – Glen Arvin 10 Townhomes

PROJECT DESCRIPTION:
Furnish all labor, materials, equipment and services
required to complete all work for Lexington Fayette Urban County Housing Authority – Glen Arvin 10 Townhomes
366-370 Glen Arvin Avenue
Lexington, Kentucky

Project Location: Lexington, Kentucky

More Details

RFB-268-17 Jennifer Osborne AML

RFB-268-17 Jennifer Osborne AML

Estimate:
$277,945.00
Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

The site is located on Hwy 550 in Floyd County (Lat: 37°, 30’, 48.55”, Long: 82°, 49’, 2.36”).
Drainage issues and a slide have developed on the Osborne property from mining on the property. The problems will be corrected by constructing steel piles in front of the house and a rock toe buttress in the yard as well as ditches to direct the runoff away from the property.
Excess excavated material from the construction activities will be taken to a waste area approximately 2.5 miles away near Hwy 80 (Lat: 37°, 29’, 4.4”, Long: 82°, 49’, 34.1”). The waste area is also being used for the Wayland Stream Stabilization project.
Site Preparation includes clearing and grubbing of vegetation. The construction area at the site and at the waste area will be revegetated using residential seeding. Hay bales and silt fences shall be installed for silt and erosion control. A hoe ram bid item is included for excavation work needed for the ditches, subdrains and retaining walls.
A landscape allowance is included to replace “in kind” landscape disturbed as needed as part of normal construction efforts

Project Location: Floyd

More Details

RFB-267-17 Argo McClure Phase III Electrical Upgrades KSD

RFB-267-17 Argo McClure Phase III Electrical Upgrades KSD

Project Manager Name: Frieda Myers
Phone: (502) 782-0328
Email:
Frieda.Myers@ky.gov

Estimate:
$381,490.00
Estimated Length of Project:
90 (Substantial Completion) + 15 (Final Completion)

The Fire Alarm System will be removed and upgraded per the 2015 Kentucky Building Code with Current Revisions and the 2013 National Fire Alarm and Signaling Code at the Argo McClure Building, located on the Kentucky School for the Deaf Campus, 202 South Second Street, Danville, Kentucky. An intelligent, addressable fire alarm system shall be provided in accordance with National Fire Alarm and Signaling Code requirements as well as the requirements of the State Fire Marshall’s Office. The system will comply with all manufacturers’ requirements and shall report compatible alarm signals to the remote central system via an externally mounted dialer. The fire alarm system will monitor any and all sprinkler system flow switches, tamper switches, and duct mounted smoke detectors as well as heat detectors and smoke detectors. A remote annunciator panel will be provided at the Main Entrance Lobby.
The Lighting Systems will be replaced in the majority of the building including new LED lay-in style with energy controls as well as emergency exit signage and emergency lighting units. The majority of the exterior Lighting Systems will also be replaced and controlled with new lighting control relay panels. The Transformer to the Building will be replaced, the electrical services will be upgraded and a Main Distribution Panelboard installed. Several shops and classrooms will receive new power panel replacements, raceway, emergency stop contactors, and new grounding.
The work to be performed shall be commenced at the time stipulated in the Notice of Intent to Award (work order) to the contractor by the Division of Contracting. Substantial Completion shall be within ninety (90) consecutive calendar days thereafter. Final completion shall be fifteen (15) consecutive calendar days after Substantial Completion.

Project Location: Danville

More Details

RFB-265-17 Waller Hall Roof West KY CTC

RFB-265-17 Waller Hall Roof West KY CTC

Project Manager Name: Dwayne
Brown
Phone: (502) 782-0315
Email: Dwayne.Brown@ky.gov

Estimate:
$297,800.00
Estimated Length of Project:
90 (Substantial Completion) + 30 (Final Completion)

The project consists of complete tear-off of existing gravel-surfaced coal tar pitch roof and installation of new SBS Modified Bituminous Membrane Roof System.

Project Location: Paducah

More Details

RFB-266-17 Re-Ad of RFB-219-17 McDaniel Scoggin Educational Building

RFB-266-17 Re-Ad of RFB-219-17 McDaniel Scoggin Educational Building

Project Manager Name: Frieda Myers
Phone: (502) 782-0328
Email:
Frieda.Myers@ky.gov

Estimate:
$690,000.00
Estimated Length of Project:
08/05/17 (Substantial Completion) + 30 (Final Completion)

Project includes mechanical systems upgrades to Scoggan and McDaniel Buildings at the Kentucky School for the Blind. Select existing unit ventilators and fan coil units will be replaced. Air handling units in Scoggan will be replaced with new units. Existing fin tube radiant heaters will be replaced to allow for system to function.
New Fan Coil units will be installed at the corridors in the Scoggan building and in the third level of the connector to provide cooling to the spaces.
Piping will be replaced in select areas and new electrical connections provided for new equipment. Cooling is being added to the bridge between the two buildings and to the corridors in Scoggan Hall.
The Scoggan Classroom Building was originally constructed in 1963 and is a 40,669- square-foot facility. The McDaniel Classroom Building was originally constructed in 1985 and is a 23,774- square-foot facility.

Project Location: Danville

More Details

Big Sandy Health Care, Inc. – Shelby Valley Clinic Addition

Big Sandy Health Care, Inc. – Shelby Valley Clinic Addition

PROJECT DESCRIPTION:
The project consists of a 3,986 SF addition to the existing clinic building, and
includes a waiting room, treatment rooms, lab, offices, break room, and storage
rooms.

Project Location: Pikeville, Kentucky

More Details

725 East Market Street Storm PSC Installation – Rebid

725 East Market Street Storm PSC Installation – Rebid

Description and location of Project: Install approximately 17 LF of 12″ PVC to Property Line, 5’ Deep; Install Dog House Manhole over single ring brick sewer; Pour 8″ base pad with #5 rebar, 8″ side walls with #5 rebar, 12″ O.C., each way; Dig out 24″ brick down to haunches of pipe; May have to hand dig from 12″ above pipe to haunches; Set flat top on Dog House and core 12″ through concrete wall with boot; Trench cut 10’x10′ and 11’x4′ with 1′ set back, concrete cap trench cut repair flush with existing asphalt surface; All traffic control and permits the responsibility of the contractor; May have to close the road.

Project Location: Louisville, Kentucky

More Details

725 East Market Street Sanitary PSC Installation – Rebid

725 East Market Street Sanitary PSC Installation – Rebid

Description and location of Project: Install approximately 31 LF of 12″ PVC to Property Line, 7’ Deep; Install Dog House Manhole over single ring brick sewer; Pour 8″ base pad with #5 rebar, 8″ side walls with #5 rebar, 12″ O.C., each way; Dig out 24″ brick down to haunches of pipe; May have to hand dig from 12″ above pipe to haunches; Set flat top on Dog House and core 12″ through concrete wall with boot; Trench cut 10’x10′ and 11’x4′ with 1′ set back, concrete cap trench cut repair flush with existing asphalt surface; All traffic control and permits the responsibility of the contractor; May have to close the road.

Project Location: Louisville, Kentucky

More Details

Big Sandy Water District – K.D.O.T. Waterline Relocation Mattie Road

Big Sandy Water District – K.D.O.T. Waterline Relocation Mattie Road

PROJECT DESCRIPTION:
The project includes but is not limited to the following:

CONTRACT – WATERLINE RELOCATION – MATTIE ROAD
a.) 250 L.F. 3″ CL 250 PVC Waterline
b,) 142 L.F. 4″ HDPE Horizontal Directional Drilling
c.) 25 L.F. 8″ Steel Bore & Jack
d.) 4 EA. 3″ Gate Valves
e.) 2 EA. Tie-ins

Project Location: Lawrence County, Kentucky

More Details