City of Taylorsville – Storm Sewer Improvements Mill Street Drainage

City of Taylorsville – Storm Sewer Improvements Mill Street Drainage

PROJECT DESCRIPTION:
The project includes but is not limited to the following:
 Mill Street – Paving, Curb & Drainage Improvements
   a.) 275 LF Curb & Gutter
   b.) 5 EA Curb inlets & Catch Basins
   c.) 120 LF 15″ ADS Storm Pipe
   d.) 180 SY Asphalt Road Widening

Project Location: Taylorsville, Kentucky

More Details

RFB-93-18 WSH Data Room HVAC

RFB-93-18 WSH Data Room HVAC

Project Manager Name: Brian
Cottongim
Phone: (502) 782-0317
Email: Brian.Cottongim@ky.gov



Estimate:
$146,600.00
Estimated Length of Project:
120 (Substantial Completion) + 14 (Final Completion)

BASE BID
The Project consists in general of the following: Install HVAC, ductless split system unit in each Data Room in the Main Hospital Building. Associated condensing units will be located on the roof. Install sidewall exhaust fans and ductwork in select rooms. Provide electric services in support of HVAC systems.

Project Location: Hopkinsville

More Details

CCK-2260-18 PAV Whitney Hendrickson Building Room 13 – Replace Liebert Chillers

CCK-2260-18 PAV Whitney Hendrickson Building Room 13 – Replace Liebert Chillers

PROJECT DESCRIPTION:
The replacement of Liebert Chillers in room 13 in Whitney Hendrickson Building

Project Location: Lexington, Kentucky

More Details

UK-1787-18 Construction Mgt Services – Project Facilities, Renewal, Modernization, Deferred Maintenance – Chem/Physics 3rd Fl-2446.1

UK-1787-18 Construction Mgt Services – Project Facilities, Renewal, Modernization, Deferred Maintenance – Chem/Physics 3rd Fl-2446.1

The Chemistry/Physics 3rd floor renovation will be a two phase project. The first phase relocates all current occupants from the 3rd floor of the Chemistry / Physics Building, and the second phase includes a complete renovation of the 3rd floor of the Chemistry / Physics Building for research.

Phase 1 includes minor renovations encompassing approximately 18,829 NSF to relocate current 3rd floor occupants by December 2018. The preliminary program includes but is not limited to

 • +/- 30 offices to be relocated (6,384 NSF)
 • Renovations to 220 and 222 to relocate Classroom 320 (2,077 NSF)
 • 6 labs to relocate to existing vacated lab space (7,236 NSF)
 • Relocate Instrument Room (143 NSF)
 • Relocate Class Labs (2,989 NSF)

Phase 2 includes renovations to provide centralized state-of-the-art laboratories, accompanying offices and collaboration spaces on the 3rd floor of the Chemistry/Physics Building to support research. The preliminary program includes, but is not limited to the following:

 • Research Labs for current and future research faculty
 • Research Faculty and support Offices
 • Write Up Areas
 • Conference Rooms
 • Lab Prep Areas
 • Break Room

Project Location: Lexington, Kentucky

More Details

RFB-90-18 Schwendeman/Thompson & Funderburk HVAC Repair/Replacement

RFB-90-18 Schwendeman/Thompson & Funderburk HVAC Repair/Replacement

Estimate:
$821,000.00
Estimated Length of Project:
100 (Substantial Completion) + 14 (Final Completion)

This project is a boiler replacement and an upgrade of the HVAC infrastructure for three building on the Department of Criminal Justice Training Campus – Funderburk Building, Schwendeman Building and finally the Thompson Building. In the Funderburk Building, the existing two electrical boilers are to be replaced with two new gas fired boilers with an upgrade of the primary loop and the addition of gas service to the building. In the Schwendeman and Thompson Building, the existing two gas fired boilers are to be demolished and replaced with two new non-condensing boilers for the heating loop and two new condensing boilers for the heat pump loop. For all three buildings, controls are to be upgraded.

Project Location: Richmond

More Details

Blue Grass Airport – SRE Multi-function Snow Removal Equipment

Blue Grass Airport – SRE Multi-function Snow Removal Equipment

PROJECT DESCRIPTION:
The Project Equipment consists of two (2) new Multi-Function Snow Removal
Vehicles.

Project Location: Lexington, Kentucky

More Details

Housing Authority of Springfield – 17

Housing Authority of Springfield – 17

PROJECT DESCRIPTION:
The work to be performed consists of: Unit Renovations
Water Heater Replacement
HVAC Replacement

Work includes providing all items, articles, materials, operations or methods herein listed, mentioned or
scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and
incidentals as necessary for their completion.

Project Location: Springfield, Kentucky

More Details

Housing Authority of Princeton – 16 & 17

Housing Authority of Princeton – 16 & 17

PROJECT DESCRIPTION:
The work to be performed consists of:
Site KY-72-002 Hyacinth Village

1. Closet door and hardware replacement.

Work includes providing all items, articles, materials, operations or methods herein listed, mentioned
or scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and
incidentals as necessary for their completion.

Project Location: Princeton, Kentucky

More Details

Waverly Park Restroom – 180082

Waverly Park Restroom – 180082

PROJECT DESCRIPTION:
Louisville Metro Government is currently accepting bids for Waverly Park Restroom per the
attached specifications.
Metro Parks and Recreation is requesting bids for construction of a new restroom at Waverly Park
located at 4800 Waverly Park Road, Louisville, Kentucky 40214. This project includes but is not limited
to: construction of a restroom, installation of an on-site septic system, connection to on-site utilities,
new concrete walkways, gravel walks, excavation, grading, trenching, erosion control and seeding.

Louisville Metro Government uses Bonfire portal for accepting and evaluating proposals digitally (https://louisvilleky.bonfirehub.com/portal)
. Bidders must submit all pages of bid document through Bonfire.

Project Location: Louisville, Kentucky

More Details

City of Hawesville – Wastewater Treatment Plant Expansion

City of Hawesville – Wastewater Treatment Plant Expansion

PROJECT DESCRIPTION:
The Project consists of constructing a new 300,000 gallon per day wastewater treatment plant with new
headworks system including screening and grit removal, new aeration/clarifier basin, new UV disinfection system, influent/effluent flow meter, piping, electrical and all related appurtenances.

Project Location: Hawesville, Kentucky

More Details

RFB-88-18 Michael Morrow Drainage & Shaft

RFB-88-18 Michael Morrow Drainage & Shaft

Estimate:
$ 49,675.00
Estimated Length of Project:
(Substantial Completion) + 60 Calendar Days (Final Completion)

The proposed Michael Morrow Drainage & Shaft AMD Abatement Project, approximately 11.5
acres total, consists of excavate iron precipitates from a mine portal, cleaning out a roadside ditch, installation of a culvert, and backfilling a vertical shaft near Dekoven in Union County.
Remove precipitates that have collected in the roadside ditch and around the mine portal and bury them onsite. The ground around the portal is very saturated so use caution. Excavate a
sump near the portal to allow the metal precipitates to collect. Cleanout the roadside ditch and restore it to a trapezoidal shape with small rock checks. Install a culvert under the road and
armor the inlet with Class II/III rock and construct a check in the ditch below the culvert to ensure water turns into the culvert. Access the shaft along existing trails improving them as needed. Break the concrete collar and push into the shaft, backfill the shaft with Class II/III rock. The shaft is estimated to be 16’ diameter x 20’ depth, however the depth may vary when cleared and backfilled. Install a shaft monument over the finished shaft closure. Regrade all disturbed areas and use the AML general seed mixture. Use limestone sand for water treatment if any water is released, especially from excavation around the portal and shaft. Use of a pump(s) is incidental to site preparation. Construction disturbances will be kept to a minimum with a stringently formulated sediment and erosion control program. Prior to beginning any major earth disturbance (excluding initial site preparation for access only), all silt control measures will be installed. All disturbed areas will be promptly revegetated at the end of construction using lime, fertilizer, residential or wildlife seed, and mulch, as necessary. Standard measures will be used for dust control and work hours will occur during AML’s standard time frame of 7 am to 7 pm Monday-Friday with shorter hours
for “critical” work items. Access to the site is via county roads, residential driveways and yards, and an existing access road. This project will include pre- and/or post- project maintenance and repair of existing previously constructed public county roads utilized during the construction of this project, which are administered by the county or local road authority. This construction activity will be conducted under the authority and supervision of the local public road authority and will consist of standard road construction practices appropriate to mitigate impacts to the local community
from potential degraded road conditions in order to maintain public traffic safety.

Project Location: Union County

More Details

Hardin County Water District #1 – Middle School Sanitary Sewer Improvements Project

Hardin County Water District #1 – Middle School Sanitary Sewer Improvements Project

Project Location: Fort Knox, Kentucky

More Details

Hardin County Water District #1 – Knox Street Water Improvements Project

Hardin County Water District #1 – Knox Street Water Improvements Project

Project Location: Fort Knox, Kentucky

More Details

Kentucky Center for African-American Heritage – Building Improvements – 180064

Kentucky Center for African-American Heritage – Building Improvements – 180064

PROJECT DESCRIPTION:
This project consist primarily of interior improvements such as acoustical treatments, finishes, audio system, lighting, HVAC & control modifications for a 1- story building “A” & Pavilion “P”.
Proposed use is for Public Gatherings and events such as meetings, dinners, receptions, art displays and ceremonies.

Louisville Metro Government uses Bonfire portal for accepting and evaluating proposals digitally (https://louisvilleky.bonfirehub.com/portal)
. Bidders must submit all pages of bid document through Bonfire.

Sealed Proposals must be uploaded,
submitted, and finalized prior to the closing at 11/3/17 3:00pm. The bid document and drawings
are available on Bonfire and Lynn Imaging, all other forms, documents and attachments are available
on (https://louisvilleky.bonfirehub.com/portal).

Project Location: Louisville, Kentucky

More Details

171245 Rockcastle Co. Call 100

Kentucky Transportation Cabinet

CALL 100 CONTRACT ID 171245 ROCKCASTLE COUNTY NHPP IM 0752 (095) : I-75 (ROCKCASTLE COUNTY) (MP 60.100) TENNESSEE STATE LINE – LEXINGTON; WIDEN I-75 TO 6 LANES FROM 1.1 MILES N US 25 INTERCHANGE AT MT. VERNON N TO 1.85 MILES N GREEN HILL ROAD OVERPASS (MP 64.500), A DISTANCE OF 4.42 MILES. ASPHALT REHAB INTERSTATE/PARKWAY. SYP NO. 08-00006.20.

PROJECT LOCATION: Rockcastle County, Kentucky

More Details

171244 Nelson Co. Call 101

Kentucky Transportation Cabinet

CALL 101 CONTRACT ID 171244 NELSON COUNTY STP 1501 (116) : BARDSTOWN – SPRINGFIELD ROAD (US 150) (MP 1.697) WIDEN US 150 INCLUDING BRIDGE RECONSTRUCTION BETWEEN THE INTERCHANGE RAMPS AT THE BLUEGRASS PARKWAY (MP 2.285), A DISTANCE OF 0.18 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 04-08309.11.

PROJECT LOCATION: Nelson County, Kentucky

More Details

171248 Morgan Co. Call 102

Kentucky Transportation Cabinet

CALL 302 CONTRACT ID 171029 MORGAN COUNTY FD04 SPP 088 0007 003-004 : WEST LIBERTY-SANDY HOOK ROAD(KY-7) IMPROVE SAFETY ON KY-7 BY ELIMINATING ROCK OVERHANG AND ADDING SHOULDERS 1000 FT. SOUTH OF KY-1161 TO 1000 FT. NORTH OF KY-1161., A DISTANCE OF 0.72 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 10-00160.00.

PROJECT LOCATION: Morgan County, Kentucky

More Details

171242 Grant Co. Call 103

Kentucky Transportation Cabinet

CALL 103 CONTRACT ID 171242 GRANT COUNTY STP 5206 (010) : JONESVILLE ROAD (KY 36) (MP 13.700) ROADWAY IMPROVEMENTS AT KY 36 FROM US 25 AT WILLIAMSTOWN TO APPROXIMATELY 1 MILE EAST OF HEEKIN CLARKS ROAD (MP 14.761), A DISTANCE OF 2.90 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 06-00411.00.

PROJECT LOCATION: Grant County, Kentucky

More Details

171243 Leslie Co. Call 105

Kentucky Transportation Cabinet

CALL 105 CONTRACT ID 171243 LESLIE COUNTY STP BRO 5271 (044) : HYDEN – WOOTON ROAD (KY 80) (MP 5.142) REPLACE BRIDGE ON KY 80 OVER CUTSHIN CREEK AT INTERSECTION WITH BUSY HOLLOW DRIVE (CR 1063) (MP 5.182), A DISTANCE OF 0.22 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 11-01089.00.

PROJECT LOCATION: Leslie County, Kentucky

More Details

171038 Jefferson Co. Call 106

Kentucky Transportation Cabinet

CALL 106 CONTRACT ID 171038 JEFFERSON COUNTY STP BRZ 0503 (248) : FAIRMOUNT ROAD (CR-1004N) / CEDAR CREEK BRIDGE DEMOLITION ON FAIRMOUNT ROAD (CR-1004N) OVER CEDAR CREEK 0.2 MILE WEST OF FARMERS WAY., A DISTANCE OF 0.10 MILES. BRIDGE DEMOLITION. SYP NO. 05-01068.00.

PROJECT LOCATION: Jefferson County, Kentucky

More Details

171247 Trimble Co. Call 107

Kentucky Transportation Cabinet

CALL 107 CONTRACT ID 171247 TRIMBLE COUNTY STP BRZ 0503 (253) : CONNECTOR ROAD (KY 2871) (MP 0.228) REPLACE BRIDGE OVER LITTLE KENTUCKY RIVER ON KY 2871 150 NW OF KY 1335 (MP 0.268), A DISTANCE OF 0.08 MILES. BRIDGE REPLACEMENT. SYP NO. 05-01075.00.

PROJECT LOCATION: Trimble County, Kentucky

More Details

171249 Larue Co. Call 108

Kentucky Transportation Cabinet

CALL 108 CONTRACT ID 171249 LARUE COUNTY STP BRZ 0611 (070) : GREENSBURG ROAD (KY 61) (MP 1.471) REPLACE BRIDGE OVER SOUTH FORK BRANCH OF KY 61 0.5 MILE NORTH OF KY 1906 (MP 1.523), A DISTANCE OF 0.05 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 04-01087.00.

PROJECT LOCATION: Larue County, Kentucky

More Details

171039 Lawrence Co. Call 109

Kentucky Transportation Cabinet

CALL 109 CONTRACT ID 171039 LAWRENCE COUNTY STP BRZ 1203(406) : MATTIE ROAD(CR-1202) REPLACE BRIDGE ON MATTIE ROAD(CR-1202) OVER RIGHT FORK OF LITTLE BLAIN 0.38 MILE WEST OF ASH BRANCH ROAD(CR-1161)., A DISTANCE OF 0.10 MILES. GRADE, DRAIN & SURFACE WITH BRIDGE. SYP NO. 12-01118.00.

PROJECT LOCATION: Lawrence County, Kentucky

More Details

171043 Boone Co. Call 111

Kentucky Transportation Cabinet

CALL 111 CONTRACT ID 171043 BOONE COUNTY STPM 5138 (066) : US-42 AT RICE PIKE INTERSECTION IMPROVEMENT PROJECT AT US-42 AND RICE PIKE/HICKS PIKE, US-42 MP 8.4 TO MP 8.6., A DISTANCE OF 0.70 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 06-00412.00.

PROJECT LOCATION: Boone County, Kentucky

More Details

171040 Allen Co. Call 300

Kentucky Transportation Cabinet

CALL 300 CONTRACT ID 171040 ALLEN COUNTY FD04 SPP 002 0098 003-005 : BROWNSFORD ROAD(KY-98) IMPROVE THE SAFETY OF KY-98 NEAR DURHAM SPRINGS ROAD., A DISTANCE OF 1.40 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 03-00201.00.

PROJECT LOCATION: Allen County, Kentucky

More Details