RFB-102-18 KCPC Intercom Replacement Phase II

RFB-102-18 KCPC Intercom Replacement Phase II

Project Manager Name: David
Guffey
Phone: (502) 782-0353
Email: David.Guffey@ky.gov

Estimate:
$400,000.00
Estimated Length of Project:
270 (Substantial Completion) + 30 (Final Completion)

The Work consists of removing and disposing the existing life safety intercom system at the Kentucky Correctional Psychiatric Center and replacing with a new life safety intercom system. During construction KCPC shall have a fully operational life safety intercom system at all times. Construction sequencing is required as indicated on the construction documents. All devices, wiring, cabling, conductors, power supplies, equipment racks, LAN shall be new. Owner will supply some speakers and horn devices as indicated. Existing raceways may be reused.

Project Location: LaGrange

More Details

Pike County Schools – Southside Elementary School Phase II

Pike County Schools – Southside Elementary School Phase II

Please Note: Addendum 1 has changed the Bid Date

PROJECT DESCRIPTION:
Furnish all labor and materials to complete the:
SOUTHSIDE
ELEMENTARY – PHASE 1B

The following bids are requested:
1 GENERAL TRADES
2 MASONRY
3 STRUCTURAL STEEL
4 ROOFING AND TRIMS
5 DRYWALL AND ACOUSTICAL CEILINGS
6 PAINTING
7 FLOORING
8 ALUMINUM FRAMED ENTRANCES AND GLAZING
9 FOOD SERVICE EQUIPMENT
10 TELESCOPING BLEACHER SEATING
11 FIRE SUPPRESSION
12 ELECTRICAL
13 HVAC AND PLUMBING
14 ASPHALT PAVING
15 GYMNASIUM
16 COMBINATION

Project Location: Pikeville, Kentucky

More Details

RFB-100-18 Fleming Armory Interior Caging Installation

RFB-100-18 Fleming Armory Interior Caging Installation

Project Manager Name: Bernard
Engelman
Phone: (502) 782-0319
Email: Bernard.Engelman@ky.gov

Estimate:
$ 88,225.00
Estimated Length of Project:
30 (Substantial Completion) + 15 (Final Completion)

This renovation project is for the Fleming Armory Storage building located at Boone National Guard Center in Frankfort, KY. Approximately 605 linear feet of wire caging partition walls are to be installed and integrated into the existing facility that currently includes several caged storage areas. 30 working days are provided from start of construction to substantial completion. 15 working days are provided from substantial completion to final completion. The contractor will be responsible for coordinating areas of construction with the Owner. The contractor will be required to communicate and work closely with the Owner for project logistics, including shut downs (where applicable), construction sequencing, and general construction activities

Project Location: Frankfort

More Details

RFB-101-18 EKCC Sprinkler Head Replacement

RFB-101-18 EKCC Sprinkler Head Replacement

Project Manager Name: Tony Yates
Phone: (502) 782-0338
Email:
Tony.Yates@ky.gov


Estimate:
$ 60,000.00
Estimated Length of Project:
45 (Substantial Completion) + 15 (Final Completion)

Replace seven Hundred Eight Seven (787) existing sprinkler heads at Eastern Kentucky Correctional Complex in West Liberty, Kentucky.

Project Location: West Liberty

More Details

Anderson County Schools – New Asphalt Paving

Anderson County Schools – New Asphalt Paving

Please Note: Addendum 1 has canceled the Bid Date

PROJECT DESCRIPTION:
Furnishing of all labor, materials, supplies, tools,
services, etc., necessary for:
NEW ASPHALT PAVING
ANDERSON COUNTY BUS GARAGE
ROBERT B. TURNER ELEMENTARY SCHOOL
ANDERSON COUNTY MIDDLE SCHOOL

Project Location: Lawrenceburg, Kentucky

More Details

RFB-98-18 Ross Creek Stream Mitigation

RFB-98-18 Ross Creek Stream Mitigation

Project Manager Name: Josh Morgan
Phone: (502) 564-3155
Email: josh.morgan@ky.gov


Estimate:
$2,595,567.00
Estimated Length of Project:
3/01/19 (Substantial Completion) + 30 (Final Completion)

This project involves mitigation of approximately 11,427 linear feet of Ross Creek and 7,007 linear feet of tributary streams with ephemeral, intermittent, and perennial flow regimes. To meet the goal of the project the following scope of work will be required: reshaping of existing channels; re-establishment of new stable channels; construction of in-stream structures; grading on the floodplain; installation of stream bed material, installation of erosion prevention and sediment control measures; installing fence and gates; planting; seeding; mulching; and harvesting, transporting, installing, and maintaining live stakes and vegetative materials. Restoration will include in-stream structures such as constructed riffles, cross vanes, toe wood, log and rock steps, as well as vegetation of the stream banks and establishment of a riparian corridor along the streams. The proposed work consists of restoration and rehabilitation, using Natural Channel Design techniques.

Project Location: Estill & Lee

More Details

Louisville Metro Housing Authority – Scattered Site Demolition

Louisville Metro Housing Authority – Scattered Site Demolition

Please Note: Addendum 1 has changed the Bid Date

The Louisville Metro Housing Authority of Louisville, Kentucky, will receive sealed bids for the contract work entitled:
SCATTERED SITE DEMOLITION
PROPOSAL #1445

Project Location: Louisville, Kentucky

More Details

City of Hopkinsville – Hopkinsville Sports Complex

City of Hopkinsville – Hopkinsville Sports Complex

Please Note: Addendum 1 has changed the Pre-Bid Date & Time

PROJECT DESCRIPTION:
The new construction project consists of an approximately 48,000 s.f. pre-engineered metal
building to contain the following: three (3) regulation high school basketball courts 50’x84’;
basketball courts convertible to six (6) high school regulation volleyball courts; one (1) indoor
turf soccer field 85’x185’ (average indoor dimensions); retractable basketball goals; drop
down baseball / softball batting cages; and ample room around sport floors for portable
bleacher spectator seating. An additional 6,000 s.f. attached commercial building to contain:
concessions/café area; men’s restroom and changing area; women’s restroom and changing
area; large conference / meeting room; open office area for 3 offices, and storage spaces.
The Sports Complex will have HVAC systems, lighting and plumbing systems as required.
The project is located adjacent to the west side of the James E. Bruce Convention Center.

Construction budget range $4,900,000 to $5,500,000.

Project Location: Hopkinsville, Kentucky

More Details

RFB-99-18 Bond Forfeiture G X PBG 17

RFB-99-18 Bond Forfeiture G X PBG 17

Estimate:
$123,421.00
Estimated Length of Project:
(Substantial Completion) + May 31, 2018 (Final Completion)

The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 6 acres of mine land in Knott County, Kentucky. The work will consist of earthwork, gradework, pond removal and revegetation of 1 bond forfeiture permit.

Project Location: Knott

More Details

EKU 112-18 Abatement Services – Powell Building

EKU 112-18 Abatement Services – Powell Building

PROJECT DESCRIPTION:
Furnishing of
all labor, materials, tools, equipment, services, supplies, and related items necessary for the abatement
of the Powell Building for Eastern Kentucky University

Project Location: Richmond, Kentucky

More Details

James E. Bruce Convention Center Addition

James E. Bruce Convention Center Addition

Please Note: Addendum 1 has changed the Pre-Bid Date & Time

PROJECT DESCRIPTION:
The project consists of a 14,765 square foot addition to the existing James E. Bruce Convention Center. Selective demolition is required on the West side of existing Convention
Center for the addition. Exterior work will consist of brick, masonry, EIFS and storefront over
structural steel columns and beams with steel joists. Roofing will be EPDM membrane
system with parapets. The new addition will include a large ballroom, large meeting room,
kitchen and storage areas. The addition will have independent HVAC system, lighting and
plumbing systems. Some systems will branch off of existing systems (i.e. Electrical service and Fire Protection), and some systems like water and gas will be new service to the addition.

Construction budget range $2,500,000 to $3,200,000.

Project Location: Hopkinsville, Kentucky

More Details

CCK-2261-18 Chandler HQ101 Sleep Rooms Renovation

CCK-2261-18 Chandler HQ101 Sleep Rooms Renovation

PROJECT DESCRIPTION:
This project is for the Refurbishment of the GMA sleep rooms. This project will be phased into 8 sections. Work will need to be scheduled and highly coordinated with Project team and
occupants of the space.

Project Location: Lexington, Kentucky

More Details

West Laurel Water Association – New County Farm Pump Station & Waterline Improvements

West Laurel Water Association – New County Farm Pump Station & Waterline Improvements

PROJECT DESCRIPTION:
This project consists of three separate contracts.
Contract 1
New County Farm Pump Station, will involve constructing a new 2 MGD booster
pump station and all necessary appurtenances.

Contract 2 – Waterline
Improvements, will involve installing approximately 4 ,850 LF. of 8″ PVC waterline,
approximately 6,700 L.F. of 6″ PVC waterline, and all necessary appurtenances.

Contract 3 – KY 363 Water Storage Tank Rehabilitation, will involve painting and
rehabilitating the KY 363 water storage tank, and all necessary appurtenances.

Project Location: London, Kentucky

More Details

Housing Authority of Danville – McIntyre Circle HVAC Replacement

Housing Authority of Danville – McIntyre Circle HVAC Replacement

PROJECT DESCRIPTION:
Work will include the following:
HOUSING AUTHORITY OF DANVILLE – CFP 501-17
McINTYRE CIRCLE HVAC REPLACEMENT
AMP 201 – McINTYRE KY 14-01

Project Location: Danville, Kentucky

More Details

Blue Grass Airport – Customs Facility Renovation

Blue Grass Airport – Customs Facility Renovation

PROJECT DESCRIPTION:
The Project consists of 2,000 square foot General Aviation Facility
renovation of an existing customs facility inside an existing storage / shipping building
and other Work indicated in the Contract Documents.

Project Location: Lexington, Kentucky

More Details

RFB-85-18 Bobby Greer Slide

RFB-85-18 Bobby Greer Slide

Estimate:
$171,827.50
Estimated Length of Project:
(Substantial Completion) + 120 Calendar Days (Final Completion)

The Bobby Greer Slides AMLRP is located in Floyd County, Kentucky at N 37° 30′ 13.63” latitude and W 82° 43′ 2.01″ longitude near Martin, KY. The site can be reached from Prestonsburg, by taking HWY 80 west for five miles to Martin. Turn left onto KY 122 east and go six miles. Turn left onto KY 2030 and go 3 miles. Turn right onto Spurlock Church Rd and the residence is at the second driveway on the left.
The Waste Area is approximately 1/4 mile, on down Spurlock Church Rd., from the residence on the right and is described further,
below.
Project Area
Two landslides have occurred above the Greer’s home. The reclamation project KY DAML proposes would abate the landslide by excavating the unstable area to rock. Transition areas with ECB would be created between the excavated area and the remaining hillside. A Class II ditch would be installed at the toe of the excavated slide area and along the driveway to facilitate drainage into the Spurlock Creek. An RHDPE pipe with headwalls would be installed to facilitate the drainage underneath Spurlock Church Road. Silt fence and/or bales and debris barrier wall are proposed for proper silt control. Structure removal/replacement is included to
replace “in kind” any qualifying features as disturbed to facilitate
the abatement plan. Utility relocation bid item is included to
replace “in kind” qualifying features as disturbed to facilitate the abatement plan. Likewise, bituminous and roadway stone bid items are included to repair “in kind” any damage to the driveway and Spurlock Church Rd. during normal construction activities.
Waste Area
N 37° 30′ 5.24” latitude and W 82° 43′ 4.14″ longitude.
Waste material would be end dumped in 4’ lifts and then lightly graded with a bulldozer, or other heavy equipment as directed by the engineer.
General
All disturbed areas (site and waste area) would be re-revegetated according to KY AML standards. Trees greater than 3” at breast height, outside of the unstable area, could be removed to facilitate
reclamation activities.

Project Location: Floyd

More Details

City of Maysville – Combined Sewer Overflows Phase 2 Contract 1 WWTP Improvements

City of Maysville – Combined Sewer Overflows Phase 2 Contract 1 WWTP Improvements

PROJECT DESCRIPTION:
The work to be bid upon is described as follows:
Improvements to existing Waste Water Treatment Plant, including but not limited to head
works building, new influent pump station, rehabilitation of existing influent pump
station, circular clarifier, and chlorine contact basin.

Project Location: Maysville, Kentucky

More Details

City of Lawrenceburg – Wild Turkey Sewer Extension

City of Lawrenceburg – Wild Turkey Sewer Extension

PROJECT DESCRIPTION:
The project consists of approximately 14,000 feet of 10″ PVC SDR 21 Force Main, 1 Lift
Station, 60 foot Railroad Bore for 24″ Gravity Sewer Line and appurtenances.

Engineer’s Estimate: $1,100,000

Project Location: Lawrenceburg, Kentucky

More Details

City of Centertown – Elevated Steel Water Storage Tower

City of Centertown – Elevated Steel Water Storage Tower

PROJECT DESCRIPTION
The work to be bid is described as follows:
The primary scope of work includes the construction of a 150,000 gallon elevated water storage
tank, including mixing system.

Project Location: Centertown, Kentucky

More Details

City of Hopkinsville – Downtown & Inner-City Park Improvement Project – East 2nd Street Park

City of Hopkinsville – Downtown & Inner-City Park Improvement Project – East 2nd Street Park

PROJECT DESCRIPTION:
The project
will consist of a variety of elements including the removal of an existing tree; installation of a bathroom addition to the
existing facility; installation of playground; Installation, repair and/or replacement of sidewalks; installation of other park
amenities such as trash receptacles, grills and benches; installation of sheltered picnic area; installation of basketball court; and installation of landscaping.

Project Location: Hopkinsville, Kentucky

More Details

City of Hawesville & Hancock County Fiscal Court – Windward Heights Water Line Replacement

City of Hawesville & Hancock County Fiscal Court – Windward Heights Water Line Replacement

PROJECT DESCRIPTION:
The Project consists of constructing new water lines (approximately 6,900 LF of 6-inch water line, 2,600
LF of 4-inch water line & 350 LF of 1-inch water line) and necessary appurtenances.

Project Location: Hawesville, Kentucky

More Details

LFUCG – Gainesway Kirklevington & Mount Tabor Park Improvements

LFUCG – Gainesway Kirklevington & Mount Tabor Park Improvements

Please Note: Addendum 2 has changed the Bid Date

PROJECT DESCRIPTION:
Consisting of the construction and/or furnishing of items as listed for the Gainesway,
Kirklevington and Mount Tabor Park Improvements, Lexington-Fayette County, Kentucky.

Project Location: Lexington, Kentucky

More Details

Perry County Sanitation District #1 – Wastewater Collection System Phase 1 Combs Branch to Chives Elementary

Perry County Sanitation District #1 – Wastewater Collection System Phase 1 Combs Branch to Chives Elementary

PROJECT DESCRIPTION:
The Project consists of installation of various diameter force mains, 26 residential grinder pumps
and one duplex pump station

The engineers estimate is $425,000 to $475,000.

Project Location: Hazard, Kentucky

More Details

LFUCG – MLK & Johnson Heights Parks Sports Field Construction

LFUCG – MLK & Johnson Heights Parks Sports Field Construction

PROJECT DESCRIPTION:
Consisting of the construction and/or furnishing of items as listed for the MLK and
Johnson Heights Parks Sports Field Construction, Lexington-Fayette County, Kentucky.

Project Location: Lexington, Kentucky

More Details

Ashland Independent Schools – Ashland Alumni Gym Renovation Addition

Ashland Independent Schools – Ashland Alumni Gym Renovation Addition

Please Note: Addendum 2 has changed the Bid Date

PROJECT DESCRIPTION:
The project scope includes renovation of the existing locker rooms, ADA accessibility and addition of public restrooms at the front of the building. The work must be substantially complete within 8 months from notice to
proceed.

Project Location: Ashland, Kentucky

More Details