City of Richmond – Gibson Bay-Lake Reba Maintenance Project

City of Richmond – Gibson Bay-Lake Reba Maintenance Project

PROJECT DESCRIPTION:
The scope of work includes dredging, re-grading and forming
berms, construction of a box culvert, and temporary erosion control as described in the
full summary of work and shown on the attachments. The site is located on Gibson Bay
Golf Course, located north of Punkin Run Road.

Project Location: Richmond, Kentucky

More Details

LFUCG Division of Parks & Recreation – Carver Center and Lou Johnson Building Renovation

LFUCG Division of Parks & Recreation – Carver Center and Lou Johnson Building Renovation

Please Note: Addendum 1 has changed the Pre-bid Date

PROJECT DESCRIPTION:
Consisting of the construction and/or furnishing of items for the Carver Center
and Lou Johnson Building Renovations, Lexington-Fayette County, Kentucky.

Project Location: Lexington, Kentucky

More Details

Housing Authority of Owensboro – PG Walker Doors

Housing Authority of Owensboro – PG Walker Doors

PROJECT DESCRIPTION:
The work to be performed consists of: Install new entry doors and hardware, screen doors, door trim, mailboxes
and light fixtures.

Project Location: Owensboro, Kentucky

More Details

RFB-138-18 Angela Whitt Slide AML

RFB-138-18 Angela Whitt Slide AML

Estimate:
$130,240.00
Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

The project is located on Old House Branch in Pike County, off KY-3419. There is a slide threatening an occupied home and an open portal at road level. Take US 23 south towards Pikeville. At the intersection of US 23 and US 119, turn left onto US 119 and travel 24 miles to Belfry. Turn right onto KY 319, travel 8 miles, and turn right onto KY 1056. Continue 3 miles and turn left on the Left Fork of Blackberry Rd for 2 miles. Turn left onto Old House Branch and travel 0.5 miles to Whitt Residence on the right side of the road.
The project area is 1.94 acres. It consists of excavation of the slide area and installation of a Type II block retaining wall. The rear deck may be removed and replaced at the engineer’s approval. Drainage control includes construction of a combination subdrain rock ditch above the wall leading to the roadside culvert. The culvert will be replaced with headwalls at inlet and outlet, and a debris barrier at the inlet.
The project also includes a portal closure at the Dorothy Hager residence several houses down. The portal is directly behind the house and will require removal/replacement of the deck, a small shed, and a section of wooden fence.
The waste area is located on the Revelation Coal site along a haul road and is approximately 0.24 acres in size.
Concrete and bituminous repair, including roadway stone, has been factored into the contract. Revegetation of the site, including agricultural limestone, fertilizer, mulch and seed will be done according to standard AML design specifications.

Project Location: Johnson

More Details

RFB-139-18 Bond Forfeiture G I PBG 18

RFB-139-18 Bond Forfeiture G I PBG 18

Estimate:
$218,974.00
Estimated Length of Project:
(Substantial Completion) + July 31, 2018 (Final Completion)

The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 21 acres of mine land in Johnson County, Kentucky. The work will consist of earthwork, gradework, and revegetation of 2 bond forfeiture permits

Project Location: Johnson

More Details

Clay County Board of Education – Clay County Track Resurfacing REBID

Clay County Board of Education – Clay County Track Resurfacing REBID

PROJECT DESCRIPTION:
The scope of work includes athletic track resurfacing, including the removal of
existing rubber surface, replacement with new synthetic rubber running surface, and miscellaneous
drainage improvements.

Project Location: Manchester, Kentucky

More Details

RFB-135-18 Mize Drainage

RFB-135-18 Mize Drainage

Estimate:
$ 74,620.00
Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

The project is located at 37.26715°N, 83.21389°W in Combs, KY near the AB Combs Elementary School. This project will address complaints about drainage from an OSM emergency wall (DAML LB#13515). The work site encompasses 0.97 acres of residential developed area in Combs and includes four properties where work will occur and access, and one area for staging/temporary storage. Access to the lower site work is along Peach Lane and from KY 80. The proposed upper area access is from a driveway and earthen path from North Engle St from KY 80. The entire project site (including staging area) is disturbed by residential and reclamation activities. There are no trees to clear at the site.
The project work entails installing dropbox structures and pipes to capture water and direct it to around the residences, under Peach Ln, and into the unnamed stream. This includes construction of an ECB ditch along the upper earthen path to a new dropbox structure constructed at the southern terminus of the OSM concrete wall. Water will then flow along a series of pipes with dropboxes placed at elevation changes and/or surface access points. The pipe under Peach Lane is reinforced concrete with a concrete cover to prevent settling. The outlet end of the system will connect to the creek with a standard concrete headwall. Repair fences and concrete sidewalks as needed.
The second work area entails cleaning sediment buildup from an existing drainage ditch along the north edge of the neighboring property. The sediment from the north side of the OSM wall has clogged the ditch and caused the water to flow across the residence driveway and yard. Replace the existing 24” CMP pipe with a 24” RHDPE pipe with 8” concrete cover and install standard headwalls. The current pipe is damaged and surface depressions indicate some portion of the pipe is compromised with soil/gravel piping in the bedding creating a void that will collapse a segment of the roadway.
The City of Hazard Water Department has indicated there is a 6” water main within the work limits; however, they reported the depth should be well below our excavation limits. Overhead power lines are the only other utility reported in the area. All the work area not restored in concrete will received residential seeding. We will not work within any stream (perennial or intermittent), only the banks of the existing channel. The stream at the work area has a drainage area of 0.12 square miles. The unnamed stream is a direct tributary of the North Fork of the Kentucky River near river mile 96.7. Sediment control consists of haybale barriers. Excavated materials are loaded directly into trucks and transported to the waste area eliminating onsite storage. The waste area is Harveyton waste area used by several AML projects (37º18’41”N, 83º11’ 47”W).

Project Location: Perry

More Details

RFB-137-18 E.O. Robinson Intergenerational Training Center Lees Campus

RFB-137-18 E.O. Robinson Intergenerational Training Center Lees Campus

Project Manager Name: Ron Harris
Phone: (502) 782-0321
Email:
RonL.Harris@ky.gov


Estimate:
$4,437,543.00
Estimated Length of Project:
456 (Substantial Completion) + 30 (Final Completion)

The development of this training center will greatly enhance the ability of Hazard Community and Technical College to provide high quality technical training on the Lees Campus for students in three distinct areas of study, including, mechatronics, telemedicine, and information technology. The spaces to be incorporated into this building include labs, classrooms, offices and additional support spaces. Exterior building components include masonry, metal wall panels, glazing, metal roof panels and low-slope 2-ply SBS. Interior finishes include painted gypsum board walls, sealed concrete floors, painted gypsum board soffits, acoustical ceiling grid and tile and accent wood grill ceiling at lobbies. This building will include commissioning.

Project Location: Jackson

More Details

LFUCG Division of Water Quality – East Hickman Wet Weather Storage Facility & Pump Stations

LFUCG Division of Water Quality – East Hickman Wet Weather Storage Facility & Pump Stations

PROJECT DESCRIPTION:
The project includes providing all furnishing all materials, supplies, machinery, equipment, tools,
supervision, labor, insurance, and other accessories and services necessary for the installation of
a 4.0 million gallon wet weather storage tank and a new pumping station (containing both dry weather and wet weather pump stations), new fine screening facilities, new odor control facilities,
installation of approximately 2,000 linear feet of 12” to 60” gravity sewer lines and various appurtenant structures. These facilities will be at and adjacent to the existing pumping station to
be demolished. This project does not include the construction of a new force main, but will re-use
an existing 30” force main. The dry weather pump station side of the facilities is sized to a maximum capacity of 18.1 MGD. The wet weather pump station side of the facilities is sized to a maximum capacity of 12.4 MGD.

Project Location: Lexington, Kentucky

More Details

RFB-133-18 Howser Hall Renovation

RFB-133-18 Howser Hall Renovation

Project Manager Name: Margaret MacDonald

Phone: (502) 564-5182
Email: Margaret.MacDonald@ky.gov

Estimate: $3,404,464.00
Estimated Length of Project: November 30, 2018 (Substantial Completion) + December 20, 2018 (Final Completion)

This project includes selective demolition and renovation/new construction for the renovation of portions of Howser Hall. Architectural work includes, but is not limited to, removal and replacement of building finishes, drywall partitions and ceilings, doors and hardware (both refurbished and new), acoustical ceilings, railings and perforated panel guards, and painting. MEP work includes replacement of the cast-iron drain piping in the building, new plumbing fixtures and piping, re-work of the sprinkler system, new split system HVAC units and ductwork, and new electrical distribution and lighting for the building.

Project Location: Louisville

More Details

Georgetown Municipal Water & Sewer Service – Lancaster Tank Repainting

Georgetown Municipal Water & Sewer Service – Lancaster Tank Repainting

PROJECT DESCRIPTION:
The program of work for which bids are to be submitted consists of the repainting the existing Lancaster
elevated tank (600,000 gallon) which shall include media blasting of the interior and exterior, installation of
coating systems on the interior and exterior, painting of the “Georgetown” logo, full containment and other work for a complete repainting of the tank,

Project Location: Georgetown, Kentucky

More Details

Gates 131 & 132 Slip Lining Project

Gates 131 & 132 Slip Lining Project

Project Description: This project will consist of construction to stabilize and reline the existing 8′ pipes at Gates 131 and 132, respectively. The new inner diameter of the pipes will be 6′.

Project Location: Louisville, Kentucky

More Details

MCHC Whitesburg Clinic Renovation

MCHC Whitesburg Clinic Renovation

PROJECT DESCRIPTION:
Project consists of a partial renovation to existing interior space within the MCHC Whitesburg Clinic.

Project Location: Whitesburg, Kentucky

More Details

OCEA – Ash Avenue WWTP Friendship Project

OCEA – Ash Avenue WWTP Friendship Project

Please Note: Addendum 01 has changed the Bid Date

Ash Avenue WWTP to Friendship Manor Forcemain Project – Contract A

Project Location: Peewee Valley, Kentucky

More Details

Mud Lane Drainage Improvement Project

Mud Lane Drainage Improvement Project

Project Description: This unit base construction order is for the 24-inch pipe and catch basin installation along Mud Lane in Metro Council District 13.

Project Location: Louisville, Kentucky

More Details

LFUCG – Winchester Road, East Seventh Street, Liberty Road Intersection Improvements

LFUCG – Winchester Road, East Seventh Street, Liberty Road Intersection Improvements

PROJECT DESCRIPTION:
Consisting of the construction and/or furnishing of items plus incidentals necessary to
complete the work. The work entails removal of the existing traffic signals, poles, and
pavement, construction of mast arms for two signalized intersections and approximately 450
square yards of concrete sidewalk, entrance pavement, and curb ramps along US 60
(Winchester Road).

Project Location: Lexington, Kentucky

More Details

City of Williamsburg – Sanitary Sewer Rehabilitation and I&I Removal

City of Williamsburg – Sanitary Sewer Rehabilitation and I&I Removal

PROJECT DESCRIPTION:
The major components of the Sanitary Sewer Rehabilitation
and I&I Removal project include 1,360 LF of CIPP, 2,930 LF 10″ PVC sewer,
1,400 LF 8ft PVC sewer, 26 ea. 4′ diameter pre-cast concrete manholes, 4 ea.
manhole drops, 1,250 LF pavement repairs, 50 sewer service re-connects, and
necessary landscaping/seeding/mulching.

Project Location: Williamsburg, Kentucky

More Details

CCK-2276-18 Gluck Equine Building Lab 324 & 328 Renovation

CCK-2276-18 Gluck Equine Building Lab 324 & 328 Renovation

PROJECT DESCRIPTION:
This project is the consolidation of existing labs 324 & 328 into a single and renovated wet lab. The wall between labs 324 & 328 will be removed. The new lab will receive new casework, floor, ceiling, new lighting, and updated HVAC.

Project Location: Lexington, Kentucky

More Details

RFB-134-18 Raymond Combs AML

RFB-134-18 Raymond Combs AML

Estimate:
$235,000.00
Estimated Length of Project: (Substantial Completion) + 120 Calendar Days (Final Completion)

The Raymond Combs AML Reclamation Project, approximately 5 acres total, consists of closing open portals and reclamation of a slide located along Hwy 451, near Hazard. The site is located in the Hazard South Quadrangle at 37° 14’ 42.01” N, 83° 10’ 25.38” W. The site is located at the intersection of Hwy 451 and Grant Combs Road. Access to the top of the slide and portals is a private drive off Grant Combs Road on the left.

AML proposes to close four open portals. Three of the portals have brick around the inlet that is unstable and partially collapse that will need to be removed prior to the construction of exterior bars. The forth portal is partially collapsed and will have a standard wildlife closure installed. The access to the portals is open. No trees will need to be removed along the access; trees within the slide area and to allow construction of ditch work will need to be removed. The slide has previously impacted Hwy 451. AML proposes to construct a gabion retaining wall along the bench, construct a terrace with an ECB ditch above the gabion ditch and construct a gabion ditch which will outlet into a concrete block tied mat ditch to drain the water around the slide area. The project will also include the removal of two abandoned structures.

The entire project site has been previously disturbed by coal mining operations, residential development/construction, utility installation, and/or road construction. These disturbances consist of significant upheaval, mixing, and removal of earthen material from deep excavation, grading, sub-surface drilling, fill material placement, and erosion. There should be no undisturbed earthen material to a depth of several feet at the areas slated for significant project-related construction activities.

Silt fence and/or hay bales will be installed and remain in effect until construction is completed at the site. All areas disturbed by construction are to be promptly re-vegetated in accordance with regional, regulatory, and project standards, using agricultural limestone, fertilizer, seed and mulch, as needed.

Entry to the project site is via county roads and a residentially maintained driveway and yard. This project will include pre- and/or post- project maintenance and repair of existing previously constructed public county roads utilized during the construction of this project, which are administered by the county or local road authority. This construction activity will be conducted under the authority and supervision of the local public road authority and will consist of standard road construction practices appropriate to mitigate impacts to the local community from potential degraded road conditions in order to maintain public traffic safety.

Project Location: Perry County

More Details

Whitley County Water District – Barton Hollow AML Waterline Extension

Whitley County Water District – Barton Hollow AML Waterline Extension

PROJECT DESCRIPTION:
This contract consists of replacing approximately 600 feet of
four inch (4″) water line, 2,500 feet of three inch (3″) water line, 170 feet of steel
encasement bored and jacked under the CSX Railroad, approximately eight
water meters; and appurtenances such as, gate valves, blow-off assemblies, etc.

The engineer’s estimate is $105,000.

Project Location: Williamsburg, Kentucky

More Details

RFB-130-18 Christian County Welcome Center Repairs

RFB-130-18 Christian County Welcome Center Repairs

Project Manager Name: Dwayne
Brown
Phone: (502) 782-0315
Email: Dwayne.Brown@ky.gov

Estimate:$64,500.00

Estimated Length of Project: 134(Substantial Completion) + 30(Final Completion)

A renovation to the KYTC Christian County Welcome Center, located at I-24 Westbound, Mile Marker 92, Christian County, Kentucky, shall consist generally of replacements and renovations to certain components of the facilities exterior envelope. The required work scope shall include the removal of an existing single-ply roofing system, Double hung windows, certain entrance doors / frames and installation of a new single-ply roofing assembly, Double hung window units and Aluminum Entrance Doors, Frames, Hardware inclusive of all accessories and miscellaneous work required to provide a complete installation.

Project Location: Hopkinsville

More Details

RFB-132-18 Lake Barkley Fitness Center Repairs

RFB-132-18 Lake Barkley Fitness Center Repairs

Project Manager Name: Dwayne
Brown
Phone: (502) 782-0315
Email: Dwayne.Brown@ky.gov

Estimate:
$231,000.00
Estimated Length of Project:
150 (Substantial Completion) + 30 (Final Completion)

A renovation to the Lake Barkley Fitness Center, located at 3500 State Park Rd, Cadiz, Kentucky in Trigg County, shall consist of system replacements and renovations primarily to the natatorium and its supporting spaces.
The architectural scope of work includes the installation of a new single-ply roofing membrane, replacement of existing walls, wall finishes, doors, frames, and lockers in the Men’s Locker Room. The existing floor finish for the storage room and equipment room will be removed and prepared for a new epoxy coating to be applied to the concrete floor slab, knee wall and new gypsum wallboard.
Mechanical, electrical, and plumbing improvements include the partial replacement of the existing sprinkler system, the replacement of faulty hose bibbs, the demolition of abandoned equipment and piping, replacement of faulty and damaged electrical systems, as well as the installation of dedicated exhaust systems for the natatorium, storage room, and pool equipment room.

Project Location: Cadiz

More Details

1811 Cummings Road Drainage Improvement Project

1811 Cummings Road Drainage Improvement Project

Description and location of Project: This unit base construction order is for the 2′ flat bottom paved ditch installation along the rear easement behind 1811 Cummings Road, in Metro Council District 13.

Project Location: Louisville, Kentucky

More Details

Wyandotte Park Improvements – 180125

Wyandotte Park Improvements – 180125

Please Note: Addendum 2 has changed the Bid Date

PROJECT DESCRIPTION:
Louisville Metro Government is currently accepting bids for Wyandotte Park Improvements per the attached specifications. Metro Parks and Recreation is requesting bids for the renovation of the sports courts and lighting within Wyandotte Park located at 1104 Beecher Street, Louisville, KY. The project includes but is not limited to: selective demolition of asphalt sports court, new paving work, court fencing installation, sports lighting system installation, and other miscellaneous sitework.

Louisville Metro Government uses Bonfire portal for accepting and evaluating proposals digitally (https://louisvilleky.bonfirehub.com/portal). Sealed Proposals must be uploaded,
submitted, and finalized prior to the closing.

Project Location: Louisville, Kentucky

More Details

Corbin Independent Board of Education – Corbin Primary School Addition

Corbin Independent Board of Education – Corbin Primary School Addition

Please Note: Addendum 4 has changed the Bid Date

PROJECT DESCRIPTION:
Corbin Primary School, located in Corbin, Kentucky, currently has a
student enrollment of 600 students. The proposed project will increase the student capacity to
850 students by adding ten (10) standard classrooms with support spaces including storage
space and a shared Toilet room configuration, with a single Resource Room and a featured
Collaborative Makers Space at the heart of the proposed addition.

Construction Contract: Sealed Bids will be received for the following Work:

1. Multiple Contract Project consisting of the following prime contracts:

a. 0300 – General Trades
b. 0400 – Masonry
c. 0500 – Structural Steel
d. 0700 – Roofing and Sheet Metal
e. 0820 – Hollow Metal, Wood Doors, and Hardware
f. 0840 – Aluminum Framed Entrances, Windows, Glass
g. 0920 – Gypsum Board Assemblies
h. 0930 – Tile
i. 0950 – Acoustical Ceilings
j. 0960 – Resilient Flooring
k. 0990 – Painting
l. 1000 – Specialties
m. 1230 – Manufactured Laminate Casework
n. 2100 – Fire Protection
o. 2223 – Plumbing and HVAC
p. 2600 – Electrical
q. 3100 – Site Excavation
Architect/Engineer/Planroom/Owner

Project Location: Corbin, Kentucky

More Details