Fayette County Public Schools – Henry Clay High School – Synthetic Turf Replacement & Running Track Repairs
Fayette County Public Schools – Henry Clay High School – Synthetic Turf Replacement & Running Track Repairs
The Scope of Work intent of the project is to renovate and replace the existing synthetic field turf
system & repair, renovate, with new latex spray finish + restripe existing urethane resilient track
surface as well as provide for new resilient latex track system for the entire high jump surface area
(that currently is only paved surface).
This work includes excavation, demolition, minor asphalt paving + concrete work, and rework of finish
lawn surfaces, along with other miscellaneous related work to complete the aforementioned project in
accordance with the Construction Documents. The fields will NOT be occupied during construction work.
The contractor shall have full use of the field during the construction time.
The turf portion of the project includes the removal and partial possible recycling of the existing synthetic
turf athletic field, reworking of existing perimeter drainage, addition of storm drain piping, installation of
long jump sand catcher and cover system, installation of new football field goal posts, installation of discus
pole eyebolts + sleeve supports, reworking of the existing gravel subbase and final laser grading,
installation geotextile fabric, shock drainage pad, and synthetic turf system, with rubber/sand mix infill. The area of field replacement is the total area inside the existing perimeter track system – totaling
(approximately 120,500 SF). All existing track surfaces and other existing appurtenances shall be
protected and not damaged during construction of the turf replacement. The existing running track will
have repair work and [2] finish coatings applied and track restriped, as well as the high jump pad
expanded and new track surface applied to the area of (approximately 5,020 SF), Work is to be
completed over Seventy Two, (72) days starting approximately May 20, 2019 and completed prior
to 1 August 2019. Upon Execution and after Notice to Proceed Contractor shall prepare all
submittals in order to have all materials approved, ordered and to be available at the Start of Work.
University of Kentucky Parking 2019 Structures, #1, #2, #3, #5, #6, #7, #8, and Good
Samaritan work includes replacement of storefront lobby enclosure, structural concrete
repairs, masonry repairs, slab waterproofing membrane removal and reinstallation, expansion
joint replacements, barrier cable replacement, line striping and façade cleaning, sealing and
sealants.
Estimate:
$ 75,650.00
Estimated Length of Project:
(Substantial Completion) + 60 Calendar Days (Final Completion)
The site is located off of KY 292 in Martin County (Lat: 37°, 45’, 51.85′, Long: 82°, 18’, 54.74′).
Drainage issues have developed on the Gillman property from mining above the property. The problems will be corrected by constructing a sub drain (by replacing the 8” pipe) to direct the runoff away from the property into three more inlet drop boxes (one already exists) and to put in three headwalls into the ditch line of KY 292.
Excess excavated material from construction of the sub drain will be placed on the Gillman property, spread evenly over the flat area of the yard.
Site Preparation includes clearing and grubbing of vegetation. The construction area at the site will be revegetated using residential seeding. Hay bales and silt fences shall be installed for silt and erosion control. A hoe ram bid item is included for excavation work needed for the ditches, sub drain. Plating to protect the septic tank is included in the site prep.
This project is a HVAC Service Renovation of HVAC Services Thompson Building on the Department of Criminal Justice Training Campus. In the Thompson Building, all existing water source heat pumps are being replaced with new water source heat pumps and controls. Stairwell heat pumps being replaced with DX mini splits.
19-17 / Garden Green Way Area Water Main Replacement
19-17 / Garden Green Way Area Water Main Replacement
Louisville Water Company is requesting Bids for project consisting of the supply and installation of 3,485 +/- linear feet of 6-inch DR-18 C900 PVC water main (using traditional trench installation techniques), the supply and installation of 295 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques), 830 +/- linear feet of 4-inch DR-18 C900 PVC water main (using traditional trench installation techniques), and 10+/- linear feet of 8-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques). Also included in this project is the supply and installation of 8 fire hydrants, and the supply and transfer, renewal, relocation or discontinue of 72 +/- customer services. Contractor shall supply and install all materials required for the completion of this project. Louisville Water Company will not supply any materials for this project. Contractors shall include the labor, material, overhead, etc. cost in their bid price. The only item that will be supplied by Louisville Water Company is the meters.
City of New Albany – Flood Control Pumping Stations Back-Up Power Project Installation
City of New Albany – Flood Control Pumping Stations Back-Up Power Project Installation
The Work of the Project consists of all work necessary for the installation of Owner provided back-up
power generators and transfer switches at six (6) Flood Control Pump Stations including installation of
concrete pads/platforms, conduit, wiring, grading and restoration of grass and paved surfaces.
City of Stanton – Sanitary Sewer Service Area Expansion – Phase 1
City of Stanton – Sanitary Sewer Service Area Expansion – Phase 1
The work is generally to provide all materials and installation of approximately 9720 linear (LF) of force main ranging in size from 2″-3″ diameter, 2860 LF of 8″ gravity sewer, 600 LF of 4″ laterals, 10 manholes, 29 grinder pump stations, 7560 LF of 1.5″ diameter
force main and four other pump stations along with other items shown on the Bid
Schedule.
This project is a HVAC Service Renovation of HVAC Services for the Funderburk building on the Department of Criminal Justice Training Campus. In the Funderburk Building, the two existing chillers and chilled water pumps are to be replaced with two new chillers and pumps as an upgrade to the chilled water system, controls to be replaced.
Housing Authority of Versailles – Storage Building Construction and Parking Lot Replacement
Housing Authority of Versailles – Storage Building Construction and Parking Lot Replacement
Please Note: Addendum 02 has changed the Bid Date
The work to be performed consists of:
A. Construct storage buildings
1. Split face concrete block
2. Metal roofing
B. Asphalt paving and seal coat
C. Concrete sidewalks
D. Smoking Areas
Work includes providing all items, articles, materials, operations or methods herein listed, mentioned
or scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and
incidentals as necessary for their completion.
CCK-2396-19 UK Summer Classroom Renovation – Bid Package C
CCK-2396-19 UK Summer Classroom Renovation – Bid Package C
Due to issues beyond our control, the downloadable files will no longer be made available through Lynn Imaging’s Planroom. To download the files, please go to the University of Kentucky’s Bid and Proposal Opportunities website. Thank you!
CCK-2395-19 UK Summer Classroom Renovation – Bid Package B
CCK-2395-19 UK Summer Classroom Renovation – Bid Package B
Please Note: Addendum 02 has changed the Bid Date
Due to issues beyond our control, the downloadable files will no longer be made available through Lynn Imaging’s Planroom. To download the files, please go to the University of Kentucky’s Bid and Proposal Opportunities website. Thank you!
CCK-2394-19 UK Summer Classroom Renovation – Bid Package A
CCK-2394-19 UK Summer Classroom Renovation – Bid Package A
Due to issues beyond our control, the downloadable files will no longer be made available through Lynn Imaging’s Planroom. To download the files, please go to the University of Kentucky’s Bid and Proposal Opportunities website. Thank you!
Town of Clarksville – Woerner Avenue Storm Sewer Reconstruction & Raw Water Main Relocation
Town of Clarksville – Woerner Avenue Storm Sewer Reconstruction & Raw Water Main Relocation
This project includes the installation of a storm sewer trunk line and raw water main
relocation on Woerner Avenue. Reconstruction Project. This project includes the
installation of storm sewers, water main, and all other items necessary for construction of
a complete project.
City of Frankfort – Fort Boone Pump Station Replacement Project Replacement Project
City of Frankfort – Fort Boone Pump Station Replacement Project Replacement Project
The City intends to issue a contract for work to construct a 660 gpm pump station. The
scope of work includes all labor, materials, equipment, and incidentals required for the
installation of a Submersible Pump Station consisting of a 10’ diameter wetwell, valve vault, 40 LF of 8” gravity sewer, 272 LF of 8” force main and the demolition of the existing pump station. Work shall include the successful testing of 5 previously constructed manholes and 508 LF of previously constructed gravity sanitary sewer line.
The project consists of the removal of roof skylight and infill with framing and roofing to match existing construction at Western Kentucky Veterans Center. Repair work involves the following:
a. Removal of existing glazed skylight and related framing. Skylight is located in middle of building, overhead of facility gift shop.
b. Roof infill of light gauge steel framing, steel decking, insulated sheathing and asphalt shingles to match adjacent construction.
c. Building interior to infilled with light gauge steel framing and painted gypsum wallboard to match adjacent construction.
d. Alteration of mechanical items to conform to building interior infill.
e. Removal of existing lighting and installation of new pendant LED fixture.
CCK-2393-19 Gluck Equine Building Lab 448 and 450 Renovation
CCK-2393-19 Gluck Equine Building Lab 448 and 450 Renovation
This project is the consolidation of existing labs 448 and 450 into a single, renovated wet lab. The wall between labs 448 and 450 will be removed. The new lab will receive new casework, flooring, ceiling, new lighting, and updated HVAC.
Pikeville Medical Center – 11th Floor Outpatient Lab & Pulmonary Diagnostics
Pikeville Medical Center – 11th Floor Outpatient Lab & Pulmonary Diagnostics
Consisting of partial renovation (5,425 sf) of the 11th Floor Clinic Building for the proposed suite for Pulmonary Function Testing and Out Patient Lab.
Description and location of Project: This unit based construction order is for the installation of a 10-inch pipe and drain system along Pershing Ave in Metro Council District 7.