RFB-238-19 DOC – GRCC Cooling Tower & Heat Exchanger Replacement

RFB-238-19 DOC – GRCC Cooling Tower & Heat Exchanger Replacement

Project Manager Name: Andy Casebier
Phone: (502) 782-0316
Email:
Andy.Casebier@ky.gov


Estimate:
$187,000.00
Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

Furnish all labor, materials and equipment needed to replace the Cooling Towers and Heat exchanger as described in the Scope of Work at the Green River Correctional Complex located at 1200 River Rd, Central City, KY 42330. These are like-kind replacements and considered “ordinary repairs” by the Kentucky Building Code. Remove and replace two cooling towers located at the K-building. Remove and replace the heat exchanger located in the K-Building.

Project Location: Central City

More Details

Scott County Schools – Northern Elementary School Reroof

Scott County Schools – Northern Elementary School Reroof

Project consists of furnishing all labor, materials, equipment and services for the
Northern Elementary School Reroof

Project Location: Georgetown, Kentucky

More Details

Olive Hill Housing Authority Duplex

Olive Hill Housing Authority Duplex

Project consists of construction of a new duplex containing an accessible
2 bedroom and 3 bedroom unit for the Housing Authority of Olive Hill.

Project Location: Olive Hill, Kentucky

More Details

Frankfort Transit Renovations

Frankfort Transit Renovations

Please note: Addendum 01 has changed the bid date.

Project consists of Frankfort Transit Renovations

Project Location: Frankfort, Kentucky

More Details

RFB-236-19 KEC Cardinal Stadium Utilities 2

RFB-236-19 KEC Cardinal Stadium Utilities 2

Project Manager Name: Andy Casebier
Phone: (502) 782-0316
Email:
Andy.Casebier@ky.gov


Estimate:
$350,000.00
Estimated Length of Project:
9/30/19 (Substantial Completion) + 10/30/19 (Final Completion)

The primary purpose of this project is to install electrical and plumbing services for the utility build back after the Cardinal Stadium has been demolished. It will consist of underground plumbing to ground outlets. Electrically, there will be underground conduits running to multiple ground ports to feed power, sound and video. The feed will consist of 300KVA 4160V/208V transformer and 1200A/120/208V/3P/4W distribution panel. This service will originate out of the North end of Freedom Hall.
There is also a 5KV primary transformer that feeds the barns being moved from the parking lot to area near the barns.

Project Location: Louisville

More Details

Housing Authority of Pikeville – Fairview ADA Apartment Project

Housing Authority of Pikeville – Fairview ADA Apartment Project

Addendum 01 has changed the bid date.

Project consists of furnishing all
necessary labor, materials, tools, machinery, warranties, and all other items required to demolish and reconstruct a (6) unit apartment building to meet plans and specifications.
Work to include, but not limited to; Demolition, General Trades, Electrical, Plumbing and
HVAC.

Project Location: Pikeville, Kentucky

More Details

City of Frankfort – Louisville Hill Erosion Control Project

City of Frankfort – Louisville Hill Erosion Control Project

The work includes the following:

 • 600 CY of Granular Embankment
 • 378 CY of Gabion Mattresses and Baskets
 • 500 SY of Type IV Filter Fabric
 • 700 SY of Erosion Control Blanket

Project Location: Frankfort, Kentucky

More Details

RFB-231-19 KEC North Wing Roof Repairs

RFB-231-19 KEC North Wing Roof Repairs

Project Manager Name: Andy Casebier
Phone: (502) 782-0316
Email:
Andy.Casebier@ky.gov


Estimate:
$1,981,000.00
Estimated Length of Project:
345 (Substantial Completion) + 15 (Final Completion)

Roof Repairs/Overlays: Remove wet roofing as indicated, match existing. Attach recovery board over existing roof systems. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over recovery board insulation. Provide new metal components; e.g. metal counter flashings, scuppers, conductor heads, downspouts, plumbing vent flashings, metal expansion joint, roof access ladders, etc.

Project Location: Louisville

More Details

RFB-230-19 KEC Roof Repairs South Wing C

RFB-230-19 KEC Roof Repairs South Wing C

Project Manager Name: Andy Casebier
Phone: (502) 782-0316
Email:
Andy.Casebier@ky.gov


Estimate:
$1,960,000.00
Estimated Length of Project:
345 (Substantial Completion) + 15 (Final Completion)

Roof Repairs/Overlays: Remove wet roofing as indicated, match existing. Attach recovery board over existing roof systems. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over recovery board insulation. Provide new metal components; e.g. metal counter flashings, scuppers, conductor heads, downspouts, plumbing vent flashings, metal expansion joint, etc.

Project Location: Louisville

More Details

Audubon School Apartments

Audubon School Apartments

This project is for SUBCONTRACTORS only

Project consists of new construction of 49 residential units, mix of one and two bedrooms in one
building with community spaces. Wood frame construction with brick veneer, vinyl siding and asphalt
shingle roofing.

Project Location: Henderson, Kentucky

More Details

Warren County Board of Education – Cumberland Trace Elementary School Bid Group 1 – Site Excavation

Warren County Board of Education – Cumberland Trace Elementary School Bid Group 1 – Site Excavation

Addendum 03 has changed the bid date

The project consists of site excavation

Project Location: Bowling Green, Kentucky

More Details

RFB-234-19 Bond Forfeiture G V LON 19

RFB-234-19 Bond Forfeiture G V LON 19

Estimate:
$999,892.50
Estimated Length of Project:
(Substantial Completion) + December 31, 2019 (Final Completion)

The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 148.68 acres of mine land in Leslie County, Kentucky. The work will consist of earthwork, gradework, tree planting and revegetation of 1 bond forfeiture permit(s).

Project Location: Leslie

More Details

Shelby County Public Schools – Milestone Academy Addition and Renovation

Shelby County Public Schools – Milestone Academy Addition and Renovation

Scope of Work consists of, but is
not limited to the following:

• Sitework including structural fill
• Demolition
• Concrete foundations
• Concrete Masonry Unit Walls
• Brick veneer
• Fiber Cement Products
• Gypsum wall board construction in Ceilings
• Hollow metal doors & frames
• Modified Bitumen Roofing & Metal Panel Roofing
• Finishes
• Electrical
• HVAC
• Plumbing & Fire Protection

Project Location: Shelbyville, Kentucky

More Details

UK-1956-19 Phase II Interventional Services TC-162 – 2402.13

UK-1956-19 Phase II Interventional Services TC-162 – 2402.13

Project consists of furnishing all labor, materials, supplies, tools, appliances, equipment, services, etc.,
necessary for the construction of, Trade Contract 162 – Furnish Doors & Door Hardware Systems for
Project #2402.13

Project Location: Lexington, Kentucky

More Details

Woodford County Park – Tennis Complex Renovation

Woodford County Park – Tennis Complex Renovation

This project is located at the at the existing tennis courts at the Woodford County Park in Versailles, KY. The project consists of the removal of the existing six tennis courts and the construction of six new tennis courts, sports lighting and associated site work.

Project Location: Versailles, Kentucky

More Details

Scott County Extension Office – Meeting Room Renovation

Scott County Extension Office – Meeting Room Renovation

Addendum 02 has changed the bid date.

Project consists of 1500 SF renovation of a multi-purpose/meeting room
for the Scott Co. Cooperative Extension Service / University of Kentucky Dept. of Agriculture.

Project Location: Georgetown, Kentucky

More Details

19-32 / River Bluff Road Grid Tie Water Main

19-32 / River Bluff Road Grid Tie Water Main

Louisville Water Company is requesting Bids for the supply and install of 1275+/- linear feet of 12-inch DR-18 C900 PVC water main (using traditional trench installation techniques). Also included with the project is the supply and install of fire hydrants, valves, cut and plugs, and tree clearing restoration.

Project Location: Louisville, Kentucky

More Details

City of Lawrenceburg – Main Street Streetscape Project Rebid

City of Lawrenceburg – Main Street Streetscape Project Rebid

This project is for replacing dilapidated sidewalks on the East and West side of 100 block of
South Main Street. This area is between Court Street and Woodford Street. The width of the
sidewalk varies between 7 and 24 feet. Project includes approximately 12,400 square feet of
sidewalk replacement, 400 feet of curb replacement, 21 ADA sidewalk ramps and
appurtenances.

Project Location: Lawrenceburg, Kentucky

More Details

CCK-2409-19 Polk-Dalton Split System Change Outs

CCK-2409-19 Polk-Dalton Split System Change Outs

This project involves the changing out of the existing split-system at the Polk-Dalton Clinic.
The scope includes the removal and replacement of the existing condensing units and
furnaces along with all associated electrical and mechanical rework.

Project Location: Lexington, Kentucky

More Details

Muhlenberg County Water District No. 1 – Interior Recoat/Repair of the Nelson Creek 70,000 Gallon Standpipe

Muhlenberg County Water District No. 1 – Interior Recoat/Repair of the Nelson Creek 70,000 Gallon Standpipe

The Project consists of the interior
recoat/repair of a 70,000 welded steel standpipe.

Project Location: Greenville, Kentucky

More Details

Fayette County Public Schools – Linlee Learning Center Site Improvements

Fayette County Public Schools – Linlee Learning Center Site Improvements

This project scope includes site improvements around the existing Learning Center at 2420 Spurr Road in
Lexington, Kentucky. The work includes extension of the existing drive island around the building,
expansion of parking along the extended drive and adjacent to the primary entry, and construction of a new
dumpster pad with enclosure. Work is limited to the Spurr Road side of the property. The building will be
occupied during construction work. The contractor shall be required to coordinate the contract work.

Project Location: Lexington, Kentucky

More Details

Wayne County Schools – Track and Soccer Field Early Bid Package # 1

Wayne County Schools – Track and Soccer Field Early Bid Package # 1

Project consists of furnishing the specified labor, materials, supplies, tools, and or services, indicated for the:
 Wayne County Schools Track and Soccer Field
 BG#19-239

Project Location: Monticello, Kentucky

More Details

LFUCG – Polo Club Boulevard Public Improvement Project

LFUCG – Polo Club Boulevard Public Improvement Project

Addendum 01 has changed the bid date.

Project consists of the construction and/or furnishing of items, plus incidentals necessary to
complete the work. The work entails modification of roadway intersection.

Project Location: Lexington, Kentucky

More Details

Danville Independent Schools – John W Bate Middle School HVAC Replacement

Danville Independent Schools – John W Bate Middle School HVAC Replacement

Furnishing of all labor and materials and
the performance of all work required for:
JOHN W BATE MIDDLE SCHOOL HVAC REPLACEMENT

Project Location: Danville, Kentucky

More Details

RFB-229-19 KCTCS – BCTC Newtown Campus Signage & Wayfinding

RFB-229-19 KCTCS – BCTC Newtown Campus Signage & Wayfinding

Project Manager Name: Ron Harris
Phone:
(502) 782-0321
Email:
RonL.Harris@ky.gov


Estimate:
$527,104.00
Estimated Length of Project:
90 (Substantial Completion) + 15 (Final Completion)

The Newtown Campus of Bluegrass Community & Technical College seeks improvements to the campus entrances and modifications to the traffic circle at the 4th street entrance along with an expansion of an existing parking lot. Work scope includes new signature signage walls consisting of masonry, fencing, and aluminum signs, engraved stone letters, expansion of existing parking lot with limited storm work and a small basin, demolition and removal of existing curbing and walks, removal of select trees, and associated earthmoving and paving. New shrubs, perennials, ground covers and sod (on all disturbed areas). In addition, lettering will be added to the pedestrian bridge that leads to the science education center.

Project Location: Lexington

More Details