West Shelby Water District – The Villas at Cardinal Club Waterline Extension
West Shelby Water District – The Villas at Cardinal Club Waterline Extension
This contract consists of constructing approximately 2,065
L.F. of 8” PVC, SDR-17 waterline and 630 L.F. of 6” PVC, SDR-17 waterline with
all other necessary appurtenances. The engineer’s estimate for the total base bid
is $130,000.
Whitley County Water District – 2019 Water System Extensions
Whitley County Water District – 2019 Water System Extensions
The 2019 Water System Extensions Project consists of the
installation of approximately 6,000 feet of three inch (3″) waterlines and
appurtenances such as gate valves, blow-off assemblies, and casing pipe.
19-70 / Cabin Creek Booster Pumping Station Replacement
19-70 / Cabin Creek Booster Pumping Station Replacement
Louisville Water Company is requesting Bids for providing all labor, rigging, tools, equipment, and materials to install pre-fabricated, underground booster pumping station, back-up diesel generator, water main and electric utilities; Furnish and install all items and accessories for a complete project. Demolish existing booster pumping station including all mechanical, electrical, and process accessories; Landscape and Restore site.
Eastern Kentucky University – Replacement of Model Lab Arts HVAC – 33-20
Eastern Kentucky University – Replacement of Model Lab Arts HVAC – 33-20
Project consists of furnishing all labor,
materials, tools, equipment, services, supplies, and related items necessary for the replacement of HVAC units
within Model Labs
The Base Bid work involves making concrete slab repairs to the front entrance at the plaza that serves The Kentucky Center for the Preforming Arts, in Louisville, Kentucky. The work will include joint sealants repairs, routing and sealing of existing cracks, and the application of penetrating concrete sealer/densifier to the entirety of the front entrance plaza concrete slab and stairs.
Alternate No. 1 consist of supplying and installing a fully functional expansion joint system for the replacement of the existing expansion joint. This shall include all equipment and material needed. See Specifications Sections 03 31 00 and 07 95 00 for additional information.
This Work includes interior renovation to Men’s and Women’s Restroom/Shower, Locker Room, and security upgrades to Vault. The Restroom/Shower areas will include removal of existing ceramic tile floors to concrete slab, all plumbing fixtures and partitions will be removed, and all light fixtures will be removed. Existing HVAC system will remain and be protected from damage. New C.M.U. partitions will be constructed in both shower areas. All floors and walls in the Restroom/Shower areas will receive new resinous coating (Methyl-Methacrylate type). New light fixtures and receptacles will be installed throughout the Restroom/Shower and Locker Room. New plumbing fixtures will be installed along with new phenolic core restroom partitions. The existing Vault will receive security caging upgrades at the interior, including steel caging panels on the walls and ceiling and 1/4″ steel plates on the floor. The Locker Room will receive new lockers on C.M.U. bases, resinous coating on floor and paint on walls. One hollow metal door will be deleted and filled in and one hollow metal door will be added from the Locker Room to the Hall.
New Albany Redevelopment Commission – Green Space, 15th and Main Street
New Albany Redevelopment Commission – Green Space, 15th and Main Street
The work involved is described below:
Primary Bid:
• Developing existing green space into pocket park featuring walking trail and fixtures
Alternate Bid:
• Install parking lane, new curb, and sidewalk along East 15th Street
• Installing storm water inlets and pipe for parking lane addition
for parking lane addition
• Pavement markings for crosswalk Pavement markings for crosswalk
The project consists of five different locations indicated as Spots 1 through 5. Spot 1 is located
on North Winter Street and includes a 2-inch mill and inlay of surface asphalt. Spot 2 is located
on US 62 (South Winter Street) and includes the removal and replacement of curb at locations
along both sides of the street. Spot 3 is located on Starks Street and includes a 1.5-inch mill and a
4-inch overlay of asphalt (2.5 inches of base and 1.5-inches of surface) with a milling taper to 4
inches through a designated area. Spot 4 is located on West Stephens Street and includes a 1.5-
inch mill and inlay of surface asphalt. Spot 5 is located on East Stephens St. and includes a 1.5-
inch mill and inlay of surface asphalt with two sections of excavation and pavement construction
with one of those sections also including curb and storm sewer construction.
Eastern Kentucky University – Cleaning of PTAC, VTAC, and Fan Coil Units – 31-20
Eastern Kentucky University – Cleaning of PTAC, VTAC, and Fan Coil Units – 31-20
Eastern Kentucky University (EKU) hereby requests sealed bids for the materials, supplies, equipment or services set forth herein, subject to all conditions outlined in this Bid Package.
Springfield Water and Sewer Commission – Springfield Wastewater Treatment Plant Expansion
Springfield Water and Sewer Commission – Springfield Wastewater Treatment Plant Expansion
Please note: Addendum 01 has changed the bid date and time.
The Project consists of construction of “Springfield
Wastewater Treatment Plant Expansion” which includes three (3) Sequencing Batch Reactors (SB R’ s),
two (2) Chlorine Contact and Post Aeration Basins, Parshall Flume, and Solids Dewatering Facilities.
Existing facilities that will be modified are: revised/upgrades to Influent Pump Station No. 1 and No. 2;
Post Equalization Basin revisions; Converting the North SBR into two (2) Sludge Holding Basins. New
structures will include an Operations, Solids Dewatering, Electrical, and Storage Buildings. Demolition of
existing structures will also be included. Also, included will be a standing generator, and associated
piping and electrical.
CCK-2425-19 College Way Motor Pool Lot Phase 2 – 2518.0
CCK-2425-19 College Way Motor Pool Lot Phase 2 – 2518.0
Proposed construction activities for the 150 space parking extension to the existing College
Way Parking Lot include site demolition, site grading, and off-site underground stormwater
detention system and storm sewer improvements. The project includes coordination with
electrical, lighting, communication, and landscape improvements by others. The project is
located along College Way in Lexington, Kentucky near the Kentucky Proud Park (Baseball
Stadium). The total area disturbed by the proposed construction activities is approximately
1.1 acres.
Louisville Water Company is requesting Bids for the supply and installation of 345 +/- linear feet of 12-inch Pressure Class 350 ductile iron water main, the supply and installation of 2,500 +/- linear feet of 12-inch DR-18 C900 PVC water main, the supply and installation of 2,755 +/- linear feet of 6-inch DR-18 C900 PVC water main, the supply and installation of 540 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main, and the supply and installation of 315 +/- linear feet of 4-inch DR-18 C900 PVC water main. Also included with the project is the installation of eight (8) fire hydrants and the transfer, renewal, relocation or discontinue of 66 +/- customer services.
Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Robin Heitz, email at rheitz@lwcky.com.
The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $1.000,001 – $3,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.
Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in the 4” – 12” PVC Water Mains prequalification category. For information about pre-qualification, contact the Buyer listed above.
Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.
Bowling Green – Warren County Regional Airport – Reconstruct Taxiway A and Taxiway Connectors
Bowling Green – Warren County Regional Airport – Reconstruct Taxiway A and Taxiway Connectors
Removal of bituminous pavement, removal and salvage of airfield
electrical components, and removal or rehabilitation of storm drainage infrastructure; new
construction of asphalt pavement, airfield electrical components and vault work, earthwork and
grading, storm drainage
infrastructure, pavement markings, and temporary and permanent erosion control items.
Project consists of removal/disposal of the existing North Lake
liner system and installation of new compacted clay fill; including all related appurtenances
In general, the project involves the replacement of the heating hot water boiler and associated pumps serving the Allied Health Building. Included in the scope is piping, hydronic accessories, electrical and temperature controls.
City of Frankfort – Unit Price Concrete Projects – 2019
City of Frankfort – Unit Price Concrete Projects – 2019
Project consists of concrete sidewalk and curb
maintenance and new sidewalk and curb construction, and miscellaneous storm sewer
construction to be performed for the City of Frankfort Public Works Department on an as
needed, cafeteria style project scope.
Campbellsville Independent Schools – Campbellsville Independent Middle School Roof Replacement
Campbellsville Independent Schools – Campbellsville Independent Middle School Roof Replacement
Project consists of furnishing the specified labor, materials, supplies, tools, and or services, indicated for the:
Campbellsville Independent Middle School Roof Replacement
Work includes the subgrade preparation, forming, placement of reinforcement, pouring and finishing of one 60’ x 40’ boat ramp (Site A) and one 40’ x 20’ boat ramp (Site B), which will provide sustainable access into Big Reno Lake located on the Wendell H. Ford Regional Training Center (WHFRTC) near Greenville, KY. These boat ramps will support multiple military training exercises, Kentucky Emergency Management (KYEM) Fire and Emergency water rescue training, and Kentucky Division of Environmental Protection (KYDEP) water spill response training. This project will also provide erosion control, nesting habitat for aquatic species, and establish bank stabilization. Refer to Drawings and Specifications for additional information.
Housing Authority of Versailles – Storage Building and Smoking Areas
Housing Authority of Versailles – Storage Building and Smoking Areas
The work to be performed consists of:
A. Construct storage buildings
1. Split face concrete block
2. Metal roofing
B. Concrete sidewalks
C. Smoking Areas
Work includes providing all items, articles, materials, operations or methods herein listed, mentioned
or scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and
incidentals as necessary for their completion.