The demolition package consists of demolition of the Kirwan Blanding Complex, 11 buildings,
associated site work and utilities. New work includes earthwork, grading, and new lawns.
Fayette County Public Schools – 450 Park Place – Disconnecting and Setting Up Utilities
Fayette County Public Schools – 450 Park Place – Disconnecting and Setting Up Utilities
The work includes the utility improvements and minimal interior renovation of an existing office building totaling 198,352 square feet. The building’s square footage is spread over four floors, plus a basement and mechanical mezzanines The scope of work for this construction project includes but is not limited to: selective building demolition, upgrades to site and building utilities, site improvements, isolated
improvements to existing mechanical systems, existing electrical systems, fire protection, fire alarm systems, interior finishes (walls, ceilings, floors, base), and door hardware. The work effort will be executed in one principal phase beginning on or around February 20, 2020 and ending on November 21, 2020 (for Final Completion). The building will not be occupied during construction work. However, the contractor shall be required to coordinate a small amount of work that the previous owner will be doing at the same time as this project and to coordinate the contract work with daily site and neighboring activities, as well as the FCPS activities such as Owner move-in.
Eastern Kentucky University (EKU) hereby requests sealed bids for the materials, supplies,
equipment or services set forth herein, subject to all conditions outlined in this Bid Package
Allen County Board of Education – Allen County District Wide Safety Project
Allen County Board of Education – Allen County District Wide Safety Project
Project consists of work on multiple schools as follows:
1. Allen County-Scottsville High School/ Allen Co. Career and Tech. Center
a. System will include an overlay of the intercom system which will allow it to connect to the software of the safety items and send announcements to
lock down school, tornado warning, etc. System will include strobe lights, panic buttons, code red buttons and door sensors. (Allen Co.-Scottsville High School- Total of 31 panic code red buttons, 4 strobes and 16 Duress
Buttons) (Allen Co. Career Tech- Total of 13 panic code red buttons, 3 strobes and 3 duress buttons).
2. James E Bazzell Middle School
a. System will include an overlay of the intercom system which will allow it to connect to the software of the safety items and send announcements to lock down school, tornado warning, etc. System will include strobe lights,
panic buttons, code red buttons and door sensors. (Total of 23 panic code red buttons, 3 strobes and 8 Duress Buttons)
3. Allen County Intermediate Center
a. System will include a new headend for the intercom system because existing headend only partially working, also includes call in buttons in each classroom, all of this will improve the communication ability throughout the building and allow it to connect to the software of the safety items. System
will include strobe lights, panic buttons, code red buttons and door sensors. (Total of 26 panic code red buttons, 4 strobes, and 8 duress buttons)
4. Allen County Primary Center
a. System will include a new headend for the intercom system because existing headend only partially working, also includes call in buttons in each classroom, all of this will improve the communication ability throughout the building and allow it to connect to the software of the safety items. The system will also include new cameras for the surveillance system and an upgrade of the NVR/DVR for recording. System will include strobe lights, panic buttons, code red buttons and door sensors. (Total of 32 panic code red buttons, 4 strobes and 9 Duress Buttons)
5. Allen County Central Office-Alternate #1
a. System will include panic buttons and code red buttons. (Total of 4 panic buttons and 2 code red)
6. Allen County Learning Center
a. System will include strobe light, panic buttons, code red buttons, and door sensors. (Total of 3 panic code reds, 1 strobe and 7 duress buttons)
7. Athletic Complex- Alternate #2
a. System will include strobe lights, code red buttons, and door sensors. (Total of 4- panic code red buttons and 2 strobes)
19-115 / Greenbelt Highway & Logistics Drive Grid Tie
19-115 / Greenbelt Highway & Logistics Drive Grid Tie
The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $250,001 – $500,000.
If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is
required. For this Contract, a Bid Bond is required.
Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories
that apply to this Bid. This Bid requires prequalification in all of the following prequalification categories: 4”-16” Ductile Iron and
4”-16”PVC Water Mains. For information about pre-qualification, contact the Buyer listed above.
Knox County School Board of Education – Knox Central High School – Tennis Courts
Knox County School Board of Education – Knox Central High School – Tennis Courts
Project consists of furnishing all necessary labor, materials, tools, machinery, warranties, and all other items required to meet the renovations per plans and specifications.
Work to include, but not limited to; Earthwork, Exterior Concrete, Sporting Surfaces, Fencing
and Lighting
CCK-2457-20 Improve Student Center Space 2 – Dining Facilities Expansion Project – BP-01 – TC-001-TC-002 – 2530.0
CCK-2457-20 Improve Student Center Space 2 – Dining Facilities Expansion Project – BP-01 – TC-001-TC-002 – 2530.0
This package involves the installation work for Bid Package # 01 – Improve Student
Center Dining Expansion Project. The work will be performed under contract with the
Construction Manager, Turner Construction Company.
Description and location of Project: This unit based construction order is for an earth re-grade along the existing easement next to 4623 Preston Highway, in Metro Council District 21.
Greenup County Board of Education – McKell Elementary School Roof Replacement
Greenup County Board of Education – McKell Elementary School Roof Replacement
This project consists the removal and replacement of the existing 2-ply SBS
roofing system from the deck up to include required insulation, gutters and downspouts, etc. New
roofing system will be 2-ply SBS with 20-year no-dollar-limit (NDL) warranty.
Greenup County Board of Education – Wurtland Elementary School Roof Replacement
Greenup County Board of Education – Wurtland Elementary School Roof Replacement
This project consists the removal and replacement of the existing 2-ply SBS
roofing system from the deck up to include required insulation, gutters and downspouts, etc. New
roofing system will be 2-ply SBS with 20-year no-dollar-limit (NDL) warranty.
This Work includes the renovation to the interiors including the sprinkler system at Guest Unit Buildings A and B at the Barren River Lake State Resort Park. Renovations include removing all furnishings from guest rooms in Buildings A and B and storing them in temporary storage pods/containers on site. The existing gypsum board ceilings and fiberglass batt insulation will be removed from the third floor guests rooms only in both buildings (A and B). Contractor shall take particular care to protect existing floor and wall finishes as well as existing sprinkler system. Contractor will install new closed cell foamed in place insulation at underside of roof deck to make the attic part of the conditioned space. See specs for complete details.
The project includes structural repairs to nine separate cottages located in the Lake Cumberland State Resort Park near Jamestown, KY. Structural Repairs include new concrete foundation walls (2 per cottage), installation of metal straps on exterior wall framing, replacement of wood ledger and/or rim board, removal / replacement of some exterior wall sheathing as well as some additional wall studs. Structural work also includes the installation of new steel rod x-bracing and wood struts.
Architectural work includes siding replacement in the areas of structural repairs where siding removal is required. Exterior Decking replacement (pressure treated 2 x 4 decking) is also required in the areas of structural repairs adjacent to the buildings (i.e. deck ledger replacement and band board replacement). The architectural work also includes repairs to the existing walkways and handrails.
Louisville Metro – Construction Manager at Risk – Louisville Slugger Field Renovations (Rebid) – 200082
Louisville Metro – Construction Manager at Risk – Louisville Slugger Field Renovations (Rebid) – 200082
Construction Manager at Risk for Louisville Slugger Field Renovations.
Louisville Metro Government uses Bonfire portal for accepting and evaluating proposals digitally (https://louisvilleky.bonfirehub.com/portal)
. Bidders must submit all pages of bid document through Bonfire. Sealed Proposals must be uploaded,
submitted, and finalized prior to the closing at 12/23/19 3:00pm. The bid document and drawings
are available on Bonfire and Lynn Imaging, all other forms, documents and attachments are available
on (https://louisvilleky.bonfirehub.com/portal).
Hopkinsville Surface & Stormwater Utility – 2019 West 7th Street and Kentucky Avenue Drainage Improvements
Hopkinsville Surface & Stormwater Utility – 2019 West 7th Street and Kentucky Avenue Drainage Improvements
The work to be bid is described as follows:
All necessary demolition, excavation, labor, materials, and equipment for the
construction of conveyance piping and structures, including approximately 860 linear
feet of storm piping, concrete sidewalk replacement, and curb and gutter construction
Invited General Contractors:
Jacobs Group General Contractors
Abel Construction Group, Inc.
Parco Constructors Group, LLC
EH Construction, LLC
Wehr Constructors, Inc.
Lichtefeld Incorporated
Redlee Construction
Kelley Construction, Inc.
Prodigy Construction
Project consists of furnishing all labor, materials and equipment for
the performance of all work required for the New Sanctuary Building Addition.
Southern Water & Sewer District – Mink Branch Water Storage Tank – Contract 2 – Water Storage Tank
Southern Water & Sewer District – Mink Branch Water Storage Tank – Contract 2 – Water Storage Tank
MINK BRANCH WATER STORAGE TANK – CONTRACT 2:
Project includes constructing a new 250,000 gallon ground storage tank and site preparation and all related
appurtenances
Please note: Addendum No. 2 has changed the Bid Opening Date
Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty Street, Louisville, Kentucky 40203 for the construction of Southwestern Pump Station Flood Repair Contract No. 16166, Budget ID No. H20153, Sheet No. 1-12, will be received at the office of MSD until 9:00 a.m., Local Time, Tuesday, January 7, 2020, and will be publicly opened and read at that place and time.
Description and location of Project: In February 2018 a flood occurred at the Southwestern Pump Station, causing catastrophic damage to the pumps, as well as the electrical components. This project will raise the electrical junction boxes for the pumps to an elevation above ground, thus minimizing the likelihood of future flooding.
All work shall be done in accordance to MSD’s Standard Specifications.
There will be Mandatory pre-bid meeting held for this project. Pre Bid meeting to be held at the Southwestern Pump Station, 4010 Bells Lane, Louisville, KY 40211. The meeting will be held on Friday, December 20, 2019 at 1:00 p.m. All visitors will be required to furnish their own PPE to visit the site.
The Engineer’s Construction Cost Estimate for this project is between $100,000.00 to $800,000.00.
The bid documents will be available on, Friday, December 6, 2019, online at www.msdbids.com The charge for each set of bid documents is outlined on the above-referenced web site.
Persons wishing to view the bid documents may do so online at www.msdbids.com or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.
The Project Manager for this Invitation to Bid is Julie Potempa. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Project Manager, Julie Potempa E-mail: Julie.potempa@louisvillemsd.org. Questions received less than two days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, Angela Akridge, P.E.
IF THE ENGINEER’S CONSTRUCTION COST ESTIMATE IS $50,000 OR MORE, the Minority Business Enterprise and Woman Business Enterprise (MBE/WBE) participation goals shall be applicable to all contracts and comply with MSD’s Interim Supplier Diversity Policy and Guidelines (Interim Policy). The Interim Policy is considered as one of the elements of responsiveness in a bid. Bidders must subcontract at least 15.0% of the total amount of the Contract Bid price to a certified MBE and 6.0% to a certified WBE, or if the Contractor is unable to meet the goals, must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the Interim Policy. – (see MSD Construction Related MBE/WBE Documents and Forms at http://www.msdlouky.org/insidemsd/diverse ). Each bidder is responsible for careful review of the Interim Policy requirements contained in the bid documents. Failure to comply with the Interim Policy may be grounds for rejection of the bid as non-responsive.
All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Project Manager, Julie Potempa – julie.potempa@louisvillemsd.org.
MSD Interim Supplier Diversity Policy and Guidelines for this project is as follows:
15% MBE and 6% WBE participation is not required for this project.
LOCAL LABOR PREFERENCE: No
The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.
Harrison County Schools – Southside Elementary Renovation
Harrison County Schools – Southside Elementary Renovation
The bid is to furnish
all necessary labor, materials, tools, machinery, warranties, and all other items required to
meet the renovations per plans and specifications. Work to include, but not limited to; exterior
concrete, exterior canopy, security entrance, interior renovations, ceilings, lighting, hvac
replacement, fire suppression and window replacement.
The work to be performed includes the addition of a stainless-steel weir to the pool gutter, stripping and re-painting the existing pool, replacing the filtered water return line, replacing two pool ladder sockets, refurbishing the diving stand and repairing and leveling of the concrete deck.
Harrison County Schools – Central Office Renovation
Harrison County Schools – Central Office Renovation
The bid is to furnish
all necessary labor, materials, tools, machinery, warranties, and all other items required to
meet the renovations per plans and specifications. Work to include, but not limited to; brick
masonry repair, ceilings, lighting, hvac replacement, and roofing.
CCK-2456-20 Vaughn Warehouse – Installation of Hi-Speed Roll Up Doors
CCK-2456-20 Vaughn Warehouse – Installation of Hi-Speed Roll Up Doors
VAUGHN WAREHOUSE (Located at 1247 Versailles Rd, Lexington, KY 40508)
INSTALLATION OF HI-SPEED ROLL UP DOORS
THIS PROJECT IS THE ADDITION (FURNISHED AND INSTALLED) OF 2 EACH
20’w X 16’h HI SPEED ROLL UP DOORS. ELECTRICAL WILL BE WITHIN 15 LF OF DOOR
OPENINGS TO TIE INTO BY THIS CONTRACT.
Louisville Water Company is requesting Bids for the furnish and install 890+/- LF of 8′ chain link fencing per project specifications
and as shown on the project plans. All of the above made ready for use in accordance and compliance with the Contract Documents.
All materials to be supplied by the Contractor.
The Project consists of providing all Work, including but not limited to labor, material, equipment, supplies and transportation for
RESTROOM RENOVATIONS – PIKEVILLE ELEMENTARY SCHOOL