RFB-34-20 DMA – Leitchfield RC Assembly Hall Addition Project
RFB-34-20 DMA – Leitchfield RC Assembly Hall Addition Project
Estimate:
$1,623,667.00
Estimated Length of Project:
270 (Substantial Completion) + 30 (Final Completion)
The assembly hall provides space for troop formations, maintenance of equipment, personnel assemblies, and large group assemblies for instructional training. It is a multi-purpose space which will be used for any large indoor events associated with the facility. The Assembly Hall shall be an open space with no internal columns or supports. In addition to the assembly hall, there is storage space and a breakroom provided.
The structural system for the building addition is of steel framing and IMP walls. Site work is limited to sidewalks, stairs, and railings required for access and emergency egress, general excavation and grading, erosion control, storm drainage and minimal landscaping. There will be some additional gravel parking in the motor pool area and paved parking for overflow employee parking.
The addition will not be provided with air conditioning but will utilize infrared gas fired strip heaters in the assembly hall and electric wall/ceiling heaters in the break room and storage room. The existing control system will be extended and connected to new equipment provided under this contract. The existing 400A electrical service and the 225A emergency service are estimated to be adequate for the existing load of the building and the new load of the building. A new panel will be provided in the addition from the existing to remain main switchgear. Minimal plumbing work will be required to install a sink in the break room and to alter routing of lines disturbed by the new construction. The communication system for the new building will include the incoming raceway for the plant cables, dedicated communications rooms overhead cable tray and raceway to each communication outlet individually connected to the cable tray. The communication system will also include the structured cabling system. This system will include the communication racks, backbone cabling and cabling from the rack to each outlet. There will also be a cable television system consisting of outlets, cabling, outlets, and a broad ban amplifier. This project will extend existing to remain fire alarm system to new assembly area and install new horn strobe and pull stations. A new fire department connection will be added at the addition to service a wet pipe system to suppress 100% of the addition. Tamper and flow switches will be added to the existing valve and an alarm bell will be added.
Project Location: Leitchfield