Hardin County Water District No. 1 – Fort Knox Hospital Sanitary Sewer Relocation Project

Hardin County Water District No. 1 – Fort Knox Hospital Sanitary Sewer Relocation Project

Sealed bids will be received by the Hardin County Water District No. 1 for the project named
Fort Knox Hospital Sanitary Sewer Relocation Project in Ft. Knox, KY.

Project Location: Fort Knox, Kentucky

More Details

LFUCG – Town Branch Trail Phase 6 and Turn Lane at Manchester and Forbes Projects – 105-2019

LFUCG – Town Branch Trail Phase 6 and Turn Lane at Manchester and Forbes Projects – 105-2019

Consisting of the construction and/or furnishing of items, plus incidentals necessary to complete the
work. The project will construct 4,000 feet of shared use trail along Old Frankfort Pike and
Manchester Street, 1,800 feet of a cycle track along Manchester Street, and additional turn
lanes at the Manchester Street and Forbes Road intersection. The project includes a box
culvert extension and a frontage road.

Click Here To Download Revised Town Branch Trail Phase 6 & Turn Lane Bid Schedule

Project Location: Lexington, Kentucky

More Details

Blue Grass Airport – General Aviation Hangars Design Build – 1906

Blue Grass Airport – General Aviation Hangars Design Build – 1906

The Project consists of design, permitting and construction of General Aviation Hangars at Blue Grass Airport. While design services will include 4 – 100’x100’ buildings and adjacent office space, the Board will consider how many to construct once construction estimates have been established. One of the hangar sites includes additional architectural design guidelines.

Project Location: Lexington, Kentucky

More Details

City of Springfield – KY 528 Waterline Relocation Over Road Run Branch

City of Springfield – KY 528 Waterline Relocation Over Road Run Branch

The work to be bid is described as follows:

KY 528 Waterline Relocation Over Road Run Branch

Project Location: Springfield, Kentucky

More Details

RFB-93-20 KEC North Wing Mezz Meeting Room Renovation

RFB-93-20 KEC North Wing Mezz Meeting Room Renovation

Estimate:
$356,806.00
Estimated Length of Project:
105 (Substantial Completion) + 14 (Final Completion)

Project consists of the upfit of two (2) existing Mezzanine Level shell spaces, off the North Wing Lobby, to meeting rooms. The work includes, but not limited to metal stud framing, gypsum wall board, suspended acoustical ceilings, finishes and wall protection. Additionally, new male and female toilet rooms will be constructed within the existing Mezzanine Level shell space. Each toilet room with have one (1) accessible toilet compartment, as well as one (1) additional fixture, lavatory counters, ceramic tile, hose bibbs, and floor drains.

Project Location: Louisville

More Details

RFB-95-20 Parks – Jenny Wiley Conference Center Roof Replacement

RFB-95-20 Parks – Jenny Wiley Conference Center Roof Replacement

Estimate:
$391,500.00
Estimated Length of Project:
60 (Substantial Completion) + 15 (Final Completion)

The project consists of roof replacement of Steep & Low Sloped Roofs. Low Slope: Remove existing EPDM roof system down to existing deck. Install 2-ply SBS Modified Bitumen roof assembly over rigid insulation. Steep Slope: Remove existing shingle roof system down to existing roof deck. Install 40-year laminate Shingle Roofing system over underlayment, vented nail base insulation to be installed where indicated.Carpentry: Install new siding where indicated at Conference Center.
Painting: Clean, prepare and paint siding & trim as indicated. Drainage: Repair/ Replace gutters as indicated.

Project Location: Prestonsburg

More Details

1712 Sheridan Ave Drainage Improvement Project

1712 Sheridan Ave Drainage Improvement Project


Please note: Addendum No. 1 has changed the Bid Opening Date

Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty St., Louisville, Kentucky 40203 for the construction of 1712 Sheridan Ave Drainage Improvement Project, Contract No. No. 2020-013, Budget ID No. C20235, will be received at the office of MSD until 10:00 am, Local Time, November 14, 2019 and will be publicly opened and read at that place and time.




Description and location of Project: This unit based construction order for pipe, paved ditch, and drainage structures along Trevilian Way and Sheridan Ave, in Metro Council District 10.




All work shall be done in accordance to MSD’s Standard Specifications.




There will be no pre-bid meeting held for this project.




The Engineer’s Construction Cost Estimate for this project is between $150,000.00 to $195,000.00




The bid documents will be available on, October 22, 2019, online at www.msdbids.com. The charge for each set of bid documents is outlined on the above-referenced web site.




Persons wishing to view the bid documents may do so online at www.msdbids.com, or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.




The Project Manager for this Invitation to Bid is Joseph S. Exely. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer, Rosita Napier-Brown at rosita.brown@louisvillemsd.org. Questions received less than two days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, Angela Akridge, P.E.




IF THE ENGINEER’S CONSTRUCTION COST ESTIMATE IS $50,000 OR MORE, the Minority Business Enterprise and Woman Business Enterprise (MBE/WBE) participation goals shall be applicable to all contracts and comply with MSD’s Interim Supplier Diversity Policy and Guidelines (Interim Policy). The Interim Policy is considered as one of the elements of responsiveness in a bid. Bidders must subcontract at least 15.0% of the total amount of the Contract Bid price to a certified MBE and 6.0% to a certified WBE, or if the Contractor is unable to meet the goals, must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the Interim Policy. See (MSD Construction-Related MBE/WBE Documents and Forms at http://www.msdlouky.org/insidemsd/diverse ). Each bidder is responsible for careful review of the Interim Policy requirements contained in the bid documents. Failure to comply with the Interim Policy may be grounds for rejection of the bid as non-responsive.




All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer, Rosita Napier-Brown at rosita.brown@louisvillemsd.org at (502) 240-6130.




MSD Interim Supplier Diversity Policy and Guidelines for this project is as follows:




15% MBE and 6 % WBE participation is required for this project




LOCAL LABOR PREFERENCE: NO




The Contract will be awarded on the basis of the lowest responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.




LOUISVILLE AND JEFFERSON COUNTY
METROPOLITAN SEWER DISTRICT




Angela Akridge, P.E.

Chief Engineer




Rene’ Lindsay

One Water Chief Procurement Officer

Project Location: Louisville

More Details

RFB-90-20 FSS – Old Capital Bldg HVAC Upgrade

RFB-90-20 FSS – Old Capital Bldg HVAC Upgrade

Estimate:
$581,600.00
Estimated Length of Project:
160 (Substantial Completion) + 30 (Final Completion)

This project involves the following:
1. The demo of the existing air handlers, hot/chilled water coils, fan coil unit, hot/chilled Water piping, steam piping, condensate piping, ductwork
2. The installation of new split system water cooled VRF heat pumps, make up air unit water cooled, all piping and duct work.
3. Electrical disconnect and connect equipment with new panels, disconnect switches, breaker and new ckts.

Project Location: Frankfort

More Details

EKU 81-20 Abatement Services

EKU 81-20 Abatement Services

The purpose of this bid is to establish a price contract for contracting certified abatement services.

Project Location: Richmond, Kentucky

More Details

RFB-98-20 Bond Forfeiture GXIV LON 19

RFB-98-20 Bond Forfeiture GXIV LON 19

Estimate: $1,079,492.75
Estimated Length of Project: (Substantial Completion) + April 30, 2020 (Final Completion)

The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation
work on approximately 124 acres of mine land in Leslie County.

Project Location: Leslie

More Details

Monroe County Board of Education – Tompkinsville Elementary School Roof Renovation – REBID

Monroe County Board of Education – Tompkinsville Elementary School Roof Renovation – REBID

The project scope includes new fluid-applied polyurethane coating to
approximately 65,000 square feet of existing EPDM roofing system, including replacement of
approximately 470 square feet of existing damaged insulation and cover board. New fluid-applied
polyurethane coating is from State Price Contract.

Project Location: Tompkinsville, Kentucky

More Details

Monroe County Board of Education – Central Office Roof Replacement – REBID

Monroe County Board of Education – Central Office Roof Replacement – REBID

This project consists of the removal of the existing roof system down to deck and
replacement with new roof system including required insulation, gutters, downspouts, etc. New
roofing system to be SBS from State Price Contract.

Project Location: Tompkinsville, Kentucky

More Details

RFB-89-20 Re-Ad of RFB-20-20

RFB-89-20 Re-Ad of RFB-20-20

Estimate:
$213,308.00
Estimated Length of Project:
105 (Substantial Completion) + 42 (Final Completion)

This project is for renovating one bathroom in the Hazelwood Clinic and bathroom renovation at three (3) Group Homes. See project description for complete details.

Project Location: Louisville

More Details

RFB-97-20 Bond Forfeiture G XIII LON 19

RFB-97-20 Bond Forfeiture G XIII LON 19

Estimate:
$186,268.75
Estimated Length of Project:
(Substantial Completion) + March 31, 2020 (Final Completion)

The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 22.5 acres of mine land in Leslie County, Kentucky. The work will consist of earthwork, gradework and revegetation of 1 bond forfeiture permit.

Project Location: Hazard

More Details

EKU 82-20 Telford Hall Resurfacing

EKU 82-20 Telford Hall Resurfacing

Eastern Kentucky University (EKU) hereby requests sealed bids for the materials, supplies,
equipment or services set forth herein, subject to all conditions outlined in this Bid Package

Project Location: Richmond, Kentucky

More Details

19-59 / Billtown Tank Fence

19-59 / Billtown Tank Fence

Louisville Water Company is requesting Bids for the furnish and install of 890+/- LF eight (8′) chain link fencing

Project Location: Louisville, Kentucky

More Details

Spencer County – Spears Drive Drainage Improvement

Spencer County – Spears Drive Drainage Improvement

The Spears Drive Drainage Improvement involves various drainage improvements, including
pipe bursting, installation of new drains, disconnection/reconnection of storm lines,
grading/earthwork, and all other appurtenant work

Project Location: Taylorsville, Kentucky

More Details

CCK-2448-20 Trade Package 12 – Structural Steel – 2446.1- REBID

CCK-2448-20 Trade Package 12 – Structural Steel – 2446.1- REBID

The University of Kentucky received bids for Invitation for Bid CCK-2424-20 on 10/09/2019. There were no bids submitted for the Trade Package 12 – Structural Steel work, so the project team has
decided to rebid this package to get bid coverage for this scope of work.

In addition, the documents contained in the Bid Package Manual and Invitation for Bid IFB CCK-2424-
20, are incorporated herein by reference including:

Addendum No. 1 – Dated 08/22/19
Addendum No. 2 – Dated 09/3/19
Addendum No. 3 – Dated 09/6/19
Addendum No. 4 – Dated 09/18/19
Addendum No. 5 – Dated 10/02/19

• Revised Form of Proposal – Trade Package 12 – Structural Steel – Rebid

Project Location: Lexington, Kentucky

More Details

967 Ida Way Drainage Improvement Project

967 Ida Way Drainage Improvement Project

Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty St., Louisville, Kentucky 40203 for the construction of 967 Ida Way Drainage Improvement Project, Contract No. 2020-012, Budget ID No. C20238, will be received at the office of MSD until 10:00 am, Local Time, November 5, 2019, and will be publicly opened and read at that place and time.




Description and location of Project: This unit based construction order is for 24-inch pipe and 24-inch flat bottom paved ditch installation, along the rear of 967 & 967 Ida Way in Metro council District 25.




All work shall be done in accordance to MSD’s Standard Specifications.




There will be no pre-bid meeting held for this project.




The Engineer’s Construction Cost Estimate for this project is between $30,000.00 to $49,000.00.




The bid documents will be available on, October 16, 2019, online at www.msdbids.com. The charge for each set of bid documents is outlined on the above-referenced web site.




Persons wishing to view the bid documents may do so online at www.msdbids.com, or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.




The Project Manager for this Invitation to Bid is Joseph S Exely. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer Barry Pickett at Barry.Pickett@louisvillemsd.org.. Questions received less than two days prior to the date for opening of bids will not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, Angela Akridge, P.E.




IF THE ENGINEER’S CONSTRUCTION COST ESTIMATE IS $50,000 OR MORE, the Minority Business Enterprise and Woman Business Enterprise (MBE/WBE) participation goals shall be applicable to all contracts and comply with MSD’s Interim Supplier Diversity Policy and Guidelines (Interim Policy). The Interim Policy is considered as one of the elements of responsiveness in a bid. Bidders must subcontract at least 15.0% of the total amount of the Contract Bid price to a certified MBE and 6.0% to a certified WBE, or if the Contractor is unable to meet the goals, must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the Interim Policy. See (MSD Construction-Related MBE/WBE Documents and Forms at http://www.msdlouky.org/insidemsd/diverse ). Each bidder is responsible for careful review of the Interim Policy requirements contained in the bid documents. Failure to comply with the Interim Policy may be grounds for rejection of the bid as non-responsive.




All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer, Barry Pickett at Barry.Pickett@louisvillemsd.org..




MSD Interim Supplier Diversity Policy and Guidelines for this project is as follows:




15% MBE and 6 % WBE participation is not required for this project




LOCAL LABOR PREFERENCE: NO




The Contract will be awarded on the basis of the lowest responsive, responsible bid, subject to the approval of the Board of MSD. MSD reserves the right to reject any or all bids or waive any informality in any bid.




LOUISVILLE AND JEFFERSON COUNTY
METROPOLITAN SEWER DISTRICT




Angela Akridge, P.E.

Chief Engineer




Rene’ Lindsay

One Water Chief Procurement Officer

Project Location: Louisville

More Details

CCK-2446-20 TH Morgan 201 & 224 Lab Renovation

CCK-2446-20 TH Morgan 201 & 224 Lab Renovation

This project renovates rooms 201 & 224. The wall between 201 and 201A will be removed to create four new spaces. The project also updates existing Lab 224. 224 will contain four new lab spaces. Both rooms will receive new casework, fume hoods, and laboratory equipment. Upgrades to lighting, power, and HVAC will also be included. The hallway ceiling between rooms 201 & 224 will also be replaced.

Project Location: Lexington, Kentucky

More Details

Greensburg Medical Clinic – Family Medical Centers

Greensburg Medical Clinic – Family Medical Centers

This project consists of the following bid packages: site work, asphalt, concrete, masonry, structural
steel, metal stud framing, roofing, storefront/windows, drywall, acoustical ceiling, floor coverings,
painting, casework, plumbing, HVAC and electrical.

Project Location: Russell Springs, Kentucky

More Details

City of Marion – Sidewalk Project

City of Marion – Sidewalk Project

The work to be bid is described as follows:

CONTRACT 676-18-01
Construction of approximately 1,025 L.F. of concrete sidewalk, 850 L.F. of curb and gutter, concrete entrances, and earthwork.

Project Location: Marion, Kentucky

More Details

CCK-2447-20 PAV A, PAV H, UKGS eICU Patient Rooms

CCK-2447-20 PAV A, PAV H, UKGS eICU Patient Rooms

The contractor shall furnish all labor and materials to patching, painting, removing and hanging
of TV’s, infection plastic and electrical work.

Project Location: Lexington, Kentucky

More Details

CCK-2445-20 PAV CC Transformer Replacement

CCK-2445-20 PAV CC Transformer Replacement

This project is to replace Transformer in Ben F Roach Building. The exiting Generator is a
dual Fed Transformer. It has two main feeds tied to each end of the transformer. If either
feed loses power it will transfer to the other feed. Because Roach facilitates overnight patient
and day patients it is critical that the transformer has dual feeds.

Project Location: Lexington, Kentucky

More Details

RFB-86-20 DOCJT – Schwendeman Bldg Emergency Generator Replacement

RFB-86-20 DOCJT – Schwendeman Bldg Emergency Generator Replacement

Estimate:
$123,000.00
Estimated Length of Project:
150 (Substantial Completion) + 14 (Final Completion)

Replace existing emergency generator with new emergency generator.

Project Location: Richmond

More Details