CC-339B-21 Curris Center Boiler Replacement Project
CC-339B-21 Curris Center Boiler Replacement Project
The project consists of the replacement of two steam boilers and water heaters with two condensing boilers,
two instantaneous condensing water heaters, tanks and accessories. The project also includes the replacement
of kitchen kettles and a dish machine.
Richmond Utilities Board – Silver Creek Pump Station and Force Main
Richmond Utilities Board – Silver Creek Pump Station and Force Main
The work to be bid is described as follows:
CONTRACT 170-20-104
Silver Creek Pump Station and Force Main—Perform work at the Silver Creek
Wastewater Treatment Plant site to decommission the treatment and discharge point.
Install a new 1,565 gpm pump station to discharge to the new Silver Creek Force Main.
Install approximately 14,500 L.F. of 18-inch PVC force main.
Description and location of Project: The scope of work shall include dirt removal and topsoil installation along the easement located at the rear of 12610 Old Henry Road, in Metro Council District 19. All work shall be done in accordance to MSD’s Standard Specifications.
A. Concrete Sidewalk and Dri Replacement
B. Handrail replacement at sidewalk stairs.
Work includes providing all items, articles, materials, operations or methods herein listed, mentioned
or scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and
incidentals as necessary for their completion.
City of Bardstown – Peracetic Acid Disinfection System Improvements
City of Bardstown – Peracetic Acid Disinfection System Improvements
Project consists of improvements to its peracetic acid disinfection systems at the
Town Creek Wastewater Treatment Plant located on Gilkey Run Road and the Jerry L. Riley Wastewater
Treatment Plant located on Sutherland Lane.
The primary scope of work includes complete construction of three (3) concrete masonry buildings, three (3) pre-engineered metal buildings and associated site improvements on one (1) site located on the Harold L. Disney Training Site (HLDTS) in Artemus, Knox County, Kentucky.
Site improvements include site striping, rough and finish grading to provide building pads and roadway within the project site. Roads are to be surfaced with DGA. Utilities are limited to minimal storm drainage, building associated improvements.
Building construction includes construction of one and two story concrete masonry buildings with poured concrete footings and foundations, ground supported slabs and precast concrete intermediate floor and roof decks. Roof construction is precast deck with elastomeric coating and concrete fill or wood truss with OSB sheathing and metal roofing panels as shown. Pre-engineered buildings are one story construction with metal siding and roofing. Framing members are girts or purlins as appropriate. Interior non-structural partitions are wood frame with OSB sheathing each side. Window openings are to be wrapped with treated wood or metal surrounds. No windows are to be installed. Doors are to be hollow core wood with field fabricated wood frames and grade 3 hardware. Building construction includes porches, stoops, handrails and guardrails as shown.
The Work of Project is defined by the Contract Documents and consists of the following main activities:
1. Widening of the dam’s crest.
2. Construction of the downstream embankment blanket drain and toe drain systems.
3. Flattening of the dam’s downstream embankment.
4. Existing spillway modifications to new low level outlet.
5. Construction of new low level outlet gates and conduit grouted in existing 66” CMP.
6. Construction of new baffled chute spillway.
7. Grouting existing low level outlet pipe and backfill concrete in existing tower.
8. Installation of erosion prevention and sediment control measures
Garrard County Board of Education – Camp Dick Robinson Elementary School Bus Canopy Additions
Garrard County Board of Education – Camp Dick Robinson Elementary School Bus Canopy Additions
Project consists of construction of a new pre-engineered metal canopy over
the bus drop off / pick up loop located on the north façade of Camp Dick Robinson Elementary
School.
CCK-2502-21 Replacement of Steam and Condensate Piping to Pence Hall
CCK-2502-21 Replacement of Steam and Condensate Piping to Pence Hall
University of Kentucky – Pence Hall (Building# 0041). The contractor will be required to
demolish, remove and replace the existing steam and pumped discharge piping (and all
associated materials/equipment) entering Pence Hall Mechanical Room through the utility
tunnel to the manhole outside of Pence Hall.
Restore all existing site conditions back to their original condition. This includes plantings,
lights, asphalt, concrete, grass, etc.
City of Jenkins – Waterline Improvement Project Phase 5
City of Jenkins – Waterline Improvement Project Phase 5
Construction including but not limited to the installation of:
Approximately 8,550 LF of 6-inch, 10,000 LF of 4-inch and 2,500 LF of 2-inch waterlines
with 80 LF of 8″ HDPE directionally drilled creek/river crossings and other
appurtenances, and 159 water service connections.
The scope of the project is as follows:
A. New lighting controls will be provided for the House Chambers Balcony level lighting.
B. House and Senate Chambers Lighting:
1. All existing LED lamp sources are proposed to be replaced in kind with newer updated LED lamp sources with equivalent lumen output.
2. All existing linear fluorescent luminaries are proposed to be demolished and replaced with new LED luminaires with equivalent lumen output.
3. All decorative surface mount -incandescent luminaires are proposed to be retrofit with new LED lamp sources with equivalent lumen output.
4. All surface mount spot luminaires are proposed to be demolished and replaced with new LED spot luminaires with equivalent lumen output.
5. All recessed spot luminaires are proposed to be retrofit with LED lamp sources with equivalent lumen output.
CCK-2501-21 T.P. Cooper Building – Replace Windows
CCK-2501-21 T.P. Cooper Building – Replace Windows
Replace all exterior windows with new aluminum windows. Includes installing accessory panels in new window sashes at locations currently having window A/C installations. Project includes removal of the A/C units with an add alternate to have the A/C units reinstalled.
The project consists of removal of existing shingle and built-up roofing systems, installation of new asphalt shingle and modified bitumen roofing systems over existing building, remove existing wood siding at gable ends, install new fiber cement board siding at gable ends, miscellaneous minor repairs to roof edge condition, and roof edge drainage systems as follows:
1. At Carter Caves State Resort Park:
a. Removal and replacement of asphalt shingles.(Areas ‘A’, ‘B’, ‘C’ ‘D’ & ‘E’)
i. New vented nail base insulation at Guestrooms.
1. 2.75″ insulation, 1″ airspace & 5/8″ OSB.
ii. New 50-year asphalt shingles.
iii. Synthetic underlayment.
iv. Ice and Water shield at perimeters.
b. Removal and replacement of gutters and downspouts at Roofs ‘A’, ‘B’, ‘C’ ‘D’ & ‘E’
i. New gutters and downspouts to match existing size and shape.
ii. Materials to be 24 ga. Pre-finished galvanized.
c. Exterior masonry at Chimney over Roof ‘A’ to have 100% re-pointing and sealer.
d. Existing drain lines to be jet cleaned and noted damaged areas repaired.
i. After cleaning, drain lines to be inspected via camera and any additional repairs to be completed via CO.
e. New drain lines to be installed at Conference Center grade to catch drainage from Areas ‘F’ & ‘G’ & expelled to hill side.
i. Roof ‘E’ & ‘F’ to have new drain lines installed and drainage to be expelled to hill side.
2. At Greenbo State Resort Park:
a. Removal and replacement of asphalt shingles.(Areas ‘A’ & ‘J’).
i. New vented nail base insulation at Guestrooms.
1. 4″ insulation, 1″ airspace & 5/8″ OSB.
ii. ii. New 50-year asphalt shingles.
iii. Synthetic underlayment.
iv. Ice and Water shield at perimeters.
b. Removal and replacement of mansard shingles: (Areas ‘B’, ‘C’, ‘D’, ‘E’, ‘F’ & ‘H’).
i. New 50-year asphalt shingles.
ii. Synthetic Underlayment.
iii. Ice & Water Shield at Perimeters.
c. Removal and replacement of SBS flat roofing (Areas ‘B’, ‘C’, ‘E’, ‘F’, ‘H’ & ‘I’).
i. R-25 insulation slope in deck at ‘H’ & ‘I’.
ii. R-25 + 1/4″ taper at Areas ‘B’, ‘C’, ‘E’ & ‘F’.
d. Removal and replacement of gutters and downspouts at Roofs ‘A’ & ‘J + Copper gutter repairs at Areas ‘B’, ‘C’, ‘D’, ‘E’, ‘F’, ‘H’ & ‘I’.
i. New gutters and downspouts to match existing size and shape.
ii. Materials to be 20 oz. copper.
e. Exterior masonry at Chimney over Roof ‘E’ to have 100% re-pointing and sealer.
f. Existing drain lines to be jet cleaned.
i. After cleaning, drain lines to be inspected via camera and any additional repairs to be completed via CO.
g. New drain lines to be installed at Conference Center grade to catch drainage from Areas ‘D’, ‘F’ & ‘H’ & tapped into existing yard drains.
The Work of the Project is defined by the Contract Documents dated 1 August 2020 the Carl D. Perkins Vocational Training Center – Carl Perkins Medical Wing Renovation, in Thelma Kentucky. The project includes the renovation of the existing bathrooms located on the 1s floor in the medical wing of the residential building. The scope of work for this current construction project includes but is not limited to: selective demolition, removal and replacement of plumbing systems, replacement of existing light fixtures, concrete slab replacement, doors and frames, hardware, interior finishes including tile work (walls, floors and base), drywall and painting, and toilet accessories. The work effort will be executed in the winter/spring 2020/21. The building will be partially occupied during all phases of construction work. In addition the project will be completed in two phases so the wing can remain occupied.
The project consists of removal of existing shingle and Modified Bitumen roofing systems, installation of new asphalt shingle and modified bitumen roofing systems over existing building, miscellaneous minor repairs to roof edge condition, and roof edge drainage systems as follows:
1. Remove existing asphalt shingles and underlayment to decking.
2. Remove selected areas of existing gutters, downspouts, and metal roof trim.
3. Remove existing modified bitumen, flashings and insulation to decking
4. Remove selected areas of scuppers, water heads, downspouts and metal roof trim
5. Install new vented composite nail base.
6. Install new underlayment, including ice and water shield.
7. Install new 40-year, asphalt shingles.
8. Install new insulation system, taper as required
9. Install new modified bitumen roof system
10. Install new metal components.
11. Install new prefinished galvanized steel gutters, downspouts, and trim.
12. Install new PVC storm drain below grade and connect to existing downspouts with cast iron boots.
Project includes replacement of HVAC system consisting of 10 water loop heat pumps, cooling tower, heat exchanger, boiler, pumps and piping with new heat pump system consisting of water loop heat pumps, rooftop unit, with pumps and DDC control system. Contractor will be responsible for temporary heating and cooling space for animal comfort. Architectural work includes demolition of ceilings and drywall ceilings and replacement of same.