Uncategorized

RFB-213-21 Big Sandy CTC Science Building Repairs

RFB-213-21 Big Sandy CTC Science Building Repairs

Estimate:
$208,500.00
Estimated Length of Project:
90 (Substantial Completion) + 30 (Final Completion)

Project is for the repair of damage to the science building caused by water. Repairs include gypsum wall board repairs; new LVT, broadloom carpet, carpet tile and VCT flooring and base; new acoustical wall covering; new paint; and new floor receptacles and associate electrical and CAT6 wiring. Additional work includes moving and storing existing loose fixtures, furnishing, and auditorium seating while work is being performed, then reinstalling. Existing equipment to be left in place is to be protected. Star projector is to have protective box built and placed around it to prevent any damage, debris or dust getting onto the projector during construction.

Project Location: Prestonsburg

More Details

21-33 / Smyrna Parkway Area Water Main

21-33 / Smyrna Parkway Area Water Main

Questions: Renee Fromme

Louisville Water Company is requesting Bids for the referenced project consists of the supply and installation of 2,360 +/- linear feet
of 6-inch DR-18 C900 PVC water main, 225 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main, 2,100 +/- linear feet
of 8-inch DR-18 C900 PVC water main, and 305 +/- linear feet of 8-inch Pressure Class 350 ductile iron water main. Also included
with the project is the supply and installation of 5 fire hydrants, and the supply and transfer, renewal, relocation or discontinue of 96
+/- customer services. Contractor shall supply and install all materials required for the completion of this project.

Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Renee Fromme, email at rfromme@lwcky.com .

The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $500,001.00 – $1,000,000.00. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.

Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in all of the following prequalification categories: 4” – 16” PVC Water Mains. For information about pre-qualification, contact the Buyer listed above.

Award of the Contract will be based on base bid pricing and is at the Company’s sole discretion. Alternate bid(s) may or may not be awarded. The Company will award the Contract to the Bidder presenting a Bid that is responsive to the Specifications, is in substantial compliance with the Contract requirements, and presents the lowest and best price for performing the Work making up the base bid. The Company may accept the Bid that the Company determines is in the Company’s best interest, which may not necessarily be the least expensive Bid.

Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.

Click Here for the List of Prequalified Bidders

Project Location: Louisville, Kentucky

More Details

21-30 / Garrs Lane Area Water Main Replacement Project

21-30 / Garrs Lane Area Water Main Replacement Project

Questions: Terri Young

Louisville Water Company is requesting Bids for supply and installation of 4,095 +/- linear feet of six (6)-inch DR-18 C900 PVC water main and 1,220 +/- linear feet of six (6)-inch Pressure Class 350 ductile iron water main. Also included with the project is the supply and installation of six (6) fire hydrants, and the supply and transfer, renewal, relocation or discontinue of 129 +/- customer
services. Contractor shall supply and install all materials required for the completion of this project.

Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Terri Young, email at tyoung@lwcky.com.

The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $1,000,001 – $3,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.

Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in the 4” – 16” PVC Water Mains Category. For information about prequalification, contact the Buyer listed above.

Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.

Click Here for the List of Prequalified Bidders

Project Location: Louisville, Kentucky

More Details

RFB-212-21 ESH 2nd Floor Renovations

RFB-212-21 ESH 2nd Floor Renovations

Estimate:
$ 61,005.00
Estimated Length of Project:
120 (Substantial Completion) + 14 (Final Completion)

The needs have changed for the waiting room 2C29 at Eastern State Hospital, due to increased abuse to finishes. Existing paneling and drywall from all walls will be removed and replaced with plywood backing and high-impact gypsum board, then painted with epoxy paint. The sheet vinyl flooring will be replaced with a resinous flooring. The existing window and door sidelite will be replaced with monolithic safety glass that cannot be shattered or scratched. As indicated in detail below, electrical and mechanical fixtures will be upgraded to withstand abuse and prevent provision of objects that can be used for harm. With the addition of monolithic glass between the waiting area and staff areas, an intercom will be provided for communication to patients.

Project Location: Lexington

More Details

Madison County Utilities District – US 25 South Water Line Relocation

Madison County Utilities District – US 25 South Water Line Relocation

The work to be bid upon is described as follows:

US 25 Water Line Relocation

• Construction of approximately 5,000 LF of 8” PVC Water Main, 1,030 LF to 8” Ductile Iron w/ Nitrate Gasket, 50 LF of Steel Encasement Pipe by Open Cut, 330 LF of PVC Encasement Pipe by Open Cut,
550 LF of Steel Encasement Pipe by Jack & Bore, 380 LF of Free Bore, 30 LF of Creek Crossing, appurtenances and other necessary items.

Project Location: Richmond, Kentucky

More Details

LFCHD – Window Assessment with Replace/Repair and Building Wash and Seal

LFCHD – Window Assessment with Replace/Repair and Building Wash and Seal

The Lexington-Fayette County Health Department is accepting bids for a complete assessment of all windows
with replacement and/or repair along with complete building wash and sealant application at its 650 Newtown
Pike, Lexington, KY 40508 location.

Project Location: Lexington, Kentucky

More Details

City of Louisa – 2020 Water Treatment Plant Improvements

City of Louisa – 2020 Water Treatment Plant Improvements

Project consisting of
installation of an Owner purchased coarse screen filter unit with associated piping modifications,
upgrades to the SCADA (Supervisory Control and Data Acquisition) control system, and various
electrical upgrades.

Project Location: Louisa, Kentucky

More Details

Mt Sterling Water & Sewer – Howard’s Mill Road Phase II Water Line Replacement

Mt Sterling Water & Sewer – Howard’s Mill Road Phase II Water Line Replacement

Mt. Sterling Water and Sewer (MSWS) is accepting bids for labor, equipment, gravel, concrete
and blacktop related to a water line replacement project proposed for Howard’s Mill Road
Phase II Mt. Sterling, Kentucky. Please note materials for this project will be supplied by the
owner. This project consists of an estimated 3,940 feet of 8” class 350 ductile iron pipe,
reconnection of service lines, along with related accessories.

Project Location: Mt Sterling, Kentucky

More Details

Mt Sterling Water & Sewer – Antwerp Avenue and Pribble Park Sewer Line Replacement

Mt Sterling Water & Sewer – Antwerp Avenue and Pribble Park Sewer Line Replacement

Mt. Sterling Water and Sewer (MSWS) is accepting bids for labor, equipment, gravel, concrete and blacktop related to a sewer line replacement project proposed for Antwerp Avenue and Pribble Park, both located in Mt. Sterling, Kentucky. Please note materials for this project will be supplied by the owner. Plan sheets are available, Antwerp (720’) and Pribble Park (265’). In addition to the construction of the above footages of sanitary sewer pipe, installation of precast manholes and reconnection of existing sewer laterals are also included requirements of this project.

Project Location: Mt. Sterling, Kentucky

More Details

Calloway County Public Library – Main Street Demolition Project

Calloway County Public Library – Main Street Demolition Project

Work consists of, but is not limited to the following:

• Building Demolition and Grading
• Pavement Demolition
• Site Utilities disconnections and Demolition
• Site Improvement – Soil Preparation and Plantings
• All Hazardous Building Materials have been removed by Audas
Environmental.

Project Location: Murray, Kentucky

More Details

WKU-10285 / Garrett Conference Center Demolition

WKU-10285 / Garrett Conference Center Demolition

The project is to demolish and remove Garrett Conference Center located on the main campus of Western Kentucky University in its entirety including footers/foundations and existing underground utility piping. The building is of concrete frame construction originally built in 1951 consisting of 87,460 total gross square feet on four levels (one sub-grade with three elevated levels). The building does have a partially excavated crawl space.

Project Location: Bowling Green, Kentucky

More Details

CCK-2543-21 TP Cooper Classrooms 109, 113 & 212 Renovations

CCK-2543-21 TP Cooper Classrooms 109, 113 & 212 Renovations

This project upgrades the HVAC systems in classrooms 109, 113 and 212 of the Thomas Poe
Cooper Building. Existing window air conditioning units and steam radiators will be removed.
New ceiling cassette fan coil units will be installed in each of these classrooms. A new rooftop
condensing unit will also be installed.

Project Location: Lexington, Kentucky

More Details

North Mercer Water District – 2019 Water System Improvements – Contract 2C

North Mercer Water District – 2019 Water System Improvements – Contract 2C

The program of work for Contract 1 which bids are to be submitted consists of the replacement of
approximately 46,000 LF of existing 3”, 4” and 6” water main and replacement of existing service line. The
program of work for Contracts 2A, 2B and 2C consists of the replacement of approximately 26,500 LF,
19,000 LF, and 18,000 LF respectively, of 4”, 6” and 8” pipe. Also included in all three contracts is the
replacement of existing service line.

Project Location: Mercer County, Kentucky

More Details

North Mercer Water District – 2019 Water System Improvements – Contract 2B

North Mercer Water District – 2019 Water System Improvements – Contract 2B

The program of work for Contract 1 which bids are to be submitted consists of the replacement of
approximately 46,000 LF of existing 3”, 4” and 6” water main and replacement of existing service line. The
program of work for Contracts 2A, 2B and 2C consists of the replacement of approximately 26,500 LF,
19,000 LF, and 18,000 LF respectively, of 4”, 6” and 8” pipe. Also included in all three contracts is the
replacement of existing service line.

Project Location: Mercer County, Kentucky

More Details

North Mercer Water District – 2019 Water System Improvements – Contract 2A

North Mercer Water District – 2019 Water System Improvements – Contract 2A

The program of work for Contract 1 which bids are to be submitted consists of the replacement of
approximately 46,000 LF of existing 3”, 4” and 6” water main and replacement of existing service line. The
program of work for Contracts 2A, 2B and 2C consists of the replacement of approximately 26,500 LF,
19,000 LF, and 18,000 LF respectively, of 4”, 6” and 8” pipe. Also included in all three contracts is the
replacement of existing service line.

Project Location: Mercer County, Kentucky

More Details

North Mercer Water District – 2019 Water System Improvements – Contract 1

North Mercer Water District – 2019 Water System Improvements – Contract 1

The program of work for Contract 1 which bids are to be submitted consists of the replacement of
approximately 46,000 LF of existing 3”, 4” and 6” water main and replacement of existing service line. The
program of work for Contracts 2A, 2B and 2C consists of the replacement of approximately 26,500 LF,
19,000 LF, and 18,000 LF respectively, of 4”, 6” and 8” pipe. Also included in all three contracts is the
replacement of existing service line.

Project Location: Mercer County, Kentucky

More Details

Graves County Board of Education – Graves County High School – Security Upgrades

Graves County Board of Education – Graves County High School – Security Upgrades

This project consists of installation of new hollow metal frames, doors and metal
stud with gypsum walls. These new walls and frames will infill existing hallway openings in order to
control access into the existing gym. The existing lay-in ceiling will be selectively reconfigured to
allow for installation of new work only. Finishes include paint, lay-in grid, ceiling tiles and rubber
base. Electrical scope will relocate existing light fixtures and provide exit lighting. Existing sprinkler
system to be adjusted to accommodate new work.

Project Location: Mayfield, Kentucky

More Details

CCK-2542-21 New High-Voltage Electrical Duct Bank Across South Upper Street

CCK-2542-21 New High-Voltage Electrical Duct Bank Across South Upper Street

UK High Voltage Utilities requires installation of a new electrical duct bank across S. Upper
Street to replace an outdated duct bank containing Orangeburg conduits (and the aging
circuits within). This project will allow full use of the new duct bank across S. Limestone,
improve safety conditions in vaults 104 and 105, and improve general reliability for nearly all
circuits coming to campus from substation #2 (especially circuit 2-5 which experienced a
recent outage and feeds much of the Ave. of Champions corridor, as well as serving as a
backup to the Peterson Service building, Heating #2, Parking #5, and the new Cornerstone
facility). No electrical outages should be required. Sidewalk and single-lane road closures will
be required.

Project Location: Lexington, Kentucky

More Details

RFB-211-21 L&N Parking Lot Sinkhole Repairs

RFB-211-21 L&N Parking Lot Sinkhole Repairs

Estimate:
$ 77,350.00
Estimated Length of Project:
60 (Substantial Completion) + 30 (Final Completion)

The work located at L&N Building Parking lot in downtown Louisville, Kentucky consists of a sinkhole that has developed from an unknown cause. The parking lot was built on the former L&N railyard and thus is speculated that buried debris could be a potential cause of the sinkhole. AEI has performed a Geotechnical investigation and recommended excavating soil at the sinkhole location down to a 15’ depth and re-install/compact in lifts as recommended by the Geotechnical report. All the soil excavated from the site should remain on site and placed back into the excavation hole due to prior contamination. The existing asphalt should be reconstructed to match existing pavement thickness, grades, and direction of flow.

Project Location: Louisville

More Details

Blue Grass Airport – Final Packet for Master Plan Update

Blue Grass Airport – Final Packet for Master Plan Update

It is the LFUCAB’s intent to hire a consulting firm who will perform a comprehensive planning study
and produce planning documents in accordance with the airport’s development goals and FAA
requirements. The LFUCAB is interested in firms which can demonstrate expertise and ability to
deliver such a project. Due to public interest in major airport infrastructure projects, it is likely that the
project will be subject to extensive review by government agencies and the public.

Project Location: Lexington, Kentucky

More Details

21-44 / North Nelson Master Meter Access Project

21-44 / North Nelson Master Meter Access Project

Louisville Water Company is requesting Bids for the furnish and install of approximately 4,020 Square Feet of Asphalt paved
roadway, approximately 550 CY of roadway fill, 47 +/- LF of 60 inch Concrete Storm pipe (Or approved equal) near the intersection of Lotus Road and KY 245 in Bullitt County, all of the above made ready for use in accordance and compliance with the Contract Documents. All materials to be supplied by the Contractor.

Project Location: Louisville, Kentucky

More Details

Housing Authority of Harlan – Bathroom Upgrades

Housing Authority of Harlan – Bathroom Upgrades

The project consists of:

Bathroom Upgrades

Project Location: Harlan, Kentucky

More Details

RFB-210-21 Todd County Salt Structure

RFB-210-21 Todd County Salt Structure

Estimate:
$130,913.00
Estimated Length of Project:
75 (Substantial Completion) + 30 (Final Completion)

This project is for the construction of a 60’-3″ long x 60-0″ wide x 10’ high concrete structure with an interior concrete pad and concrete entrance apron for the purpose of bulk storage of roadway, deicing salt.
Class “A” concrete to be reinforced with epoxy coated rebar & fiber, which shall be used throughout the shallow, spread footing and walls. The Contractor shall be required to perform all excavation, filling, grading, & compaction of sub-grade and sub-base necessary for the construction of footing, interior pad, and entrance apron.
Concrete walls will be ten (10) feet high, will be twelve (12) inches thick, will be constructed on the concrete footing, and will support a pre-engineered, membrane covered (roof) structure (PMCS) with trusses on fifteen (15) on-centers. The roof structure is to be furnished and installed separately by Bulk Storage, Inc., per their current Master Agreement upon completion of the footing and walls under this contract. The (PMCS) is not a part of this Scope of Work.
Nine (9) inch thick, Class “AA”concrete modified with fiber & epoxy coated rebar, concrete slabs shall be placed inside the footing and at the entrance on the exterior of the structure.

Project Location: Todd

More Details

Housing Authority of Pineville – Kitchen Upgrades

Housing Authority of Pineville – Kitchen Upgrades

The project consists of:

Water Piping, Waste Piping, Kitchen Upgrades & Flooring

Project Location: Pineville, Kentucky

More Details

Housing Authority of Russellville – Bathroom Upgrades

Housing Authority of Russellville – Bathroom Upgrades

The project consists of:

Bathroom Upgrades

Project Location: Russellville, Kentucky

More Details

Subscribe