Uncategorized

RFB-229-21 WKCC Concrete Repairs

RFB-229-21 WKCC Concrete Repairs

Estimate:
$117,410.00
Estimated Length of Project:
75 (Substantial Completion) + 30 (Final Completion)

Repair concrete sidewalks at West Kentucky Correctional Center in Fredonia, KY. Work will consist of removal and replacement of existing concrete sidewalks and related grading and drainage work.

Project Location: Fredonia

More Details

Spencer County Fiscal Court – Little Elk Creek Road Bridge Replacement

Spencer County Fiscal Court – Little Elk Creek Road Bridge Replacement

The scope of the work is for the replacement of 1 bridge on Little Elk Creek Road
in Spencer County, KY. This work includes the demolition of an existing bridge,
construction of a roadway diversion, construction of a 40’ Long x 12’ Wide concrete
composite box beam bridge, alternate 1 bid for roadway and modular block wall
construction, and alternate 2 bid for CON/SPAN culvert.

Project Location: Taylorsville, Kentucky

More Details

RFB-228-21 Governor’s Mansion Chilled Water Line

RFB-228-21 Governor’s Mansion Chilled Water Line

Estimate:
$1,065,065.00
Estimated Length of Project:
230 (Substantial Completion) + 30 (Final Completion)

Provide a new stand alone chiller (with air side economizer) to serve the Governor’s mansion. Provide new piping from the chilled water mains to the mansion. Provide cross over control valves to allow the mansion to be feed from the central plant or from the stand alone chiller.

Project Location: Frankfort

More Details

City of Brandenburg – Downtown Sidewalk Connections

City of Brandenburg – Downtown Sidewalk Connections

Project consists of Grade, Concrete, Retaining Walls, Pedestrian Rails, and Asphalt.

Project Location: Brandenburg, Kentucky

More Details

RFB-226-21 National Responders Preparedness Center (NRPC) Expansion

RFB-226-21 National Responders Preparedness Center (NRPC) Expansion

Estimate:
$5,227,758.00
Estimated Length of Project:
395 (Substantial Completion) + 30 (Final Completion)

The Work of the Project is defined by the Contract Documents and consists of, but not limited to, the following site clearing and new construction work of a classroom building and a fire fighting simulator (burn tower): Site clearing including, but not limited to, existing concrete driver training pad and other Work indicated in the Contract Documents.
Construction of new KCTCS NRPC Classroom training facility. Construction of new KCTCS NRPC fire fighting simulator, Burn Tower.

Project Location: Greenville

More Details

Bells Lane WWTF Polymer Dosing System Updates

Bells Lane WWTF Polymer Dosing System Updates

Description and location of Project:
The Bells Lane WWTF Polymer Dosing System Updates (“Project”) project includes: removal of the existing air flush and water flush control valves for the polymer distribution system and installation of new valves in a different location in the same room; installation of a new solvent flush system for the polymer blending and dosing system; relocation of various appurtenances associated with the polymer blending, dosing, and distribution system; and installation of system control Panel(s) in support of the flushing system upgrades to the polymer blending, dosing, and distribution system. The project is located at the Bells Lane WWTF at 4010 Bells Lane, Louisville, Kentucky 40211. All work shall be done in accordance to MSD’s Standard Specifications.

Project Location: Louisville, Kentucky

More Details

RFB-225-21 CHFS – ESH Dish Machine Replacement

RFB-225-21 CHFS – ESH Dish Machine Replacement

Estimate:
$ 86,687.00
Estimated Length of Project:
56 (Substantial Completion) + 30 (Final Completion)

Replace the existing dishwasher at the Eastern State Hospital with new. Modify electric and reconnect exhaust, water and drain.

Project Location: Lexington

More Details

West Shelby Water District – Ardmore Crossing Phase 3A & 3B Waterline Extension

West Shelby Water District – Ardmore Crossing Phase 3A & 3B Waterline Extension

This contract consists of installing approximately 1,575 L.F. of 6” PVC, SDR-17 waterline
and all other necessary appurtenances.

The engineer’s
estimate is $114,000.

Project Location: Simpsonville, Kentucky

More Details

CITB-121-2021 Coates Roof Replacement & Masonry Repairs

CITB-121-2021 Coates Roof Replacement & Masonry Repairs

This invitation is for the roof replacement and masonry repair on the Coates building as specified in the
following bid at Eastern Kentucky University’s Richmond Campus. The work includes furnishing all labor,
materials, equipment, and services necessary for the removal and replacement of the existing brick and stone
parapet, replacement of damaged stone, and replacement of the lower roof.

Project Location: Richmond, Kentucky

More Details

CCK-2551-21 BBSRB Penthouse – Replace JCI Devices throughout Building

CCK-2551-21 BBSRB Penthouse – Replace JCI Devices throughout Building

Work includes coordination with all utility companies; agency review fees and all inspection
fees; all labor, materials, tools, excavation and backfill and all equipment necessary for the
installation of all Heating, Ventilating and Air Conditioning, System as shown on the Drawings
and Specifications and/or as required for complete and operating systems. The work shall
include starting, balancing and the necessary and required tests to insure the proper
operation of the complete system to ensure the proper functioning of the system and
equipment installed.

Project Location: Lexington, Kentucky

More Details

CITB-122-2021 Coates Roof Abatement

CITB-122-2021 Coates Roof Abatement

This invitation is for the abatement of the Coates Building roof as specified in the following bid at Eastern
Kentucky University’s Richmond Campus. This project is in preparation of roof replacement and masonry
repair. The work includes furnishing all labor, materials, equipment, and services necessary for the removal
abatement of the roof area.

Project Location: Richmond, Kentucky

More Details

Whitley County Board of Education – Whitley County High School Career & Technical Education Building

Whitley County Board of Education – Whitley County High School Career & Technical Education Building

The project scope includes construction of a 10,474 SF Pre-engineered Metal
Building for a Carpentry program and Electricity program at Whitley County High School.

Project Location: Williamsburg, Kentucky

More Details

MFWQTC Primary Sedimentation Basin Rehabilitation Project

MFWQTC Primary Sedimentation Basin Rehabilitation Project

Be Advised that this Bid that opened on Tuesday, July 27, 2021, is hereby cancelled. The Bid will be revised and posted to the website in the near future

Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty St., Louisville, Kentucky 40203 for the construction of Morris Forman Water Quality Treatment Center (MFWQTC) Primary Sedimentation Basin Rehabilitation Project Contract No. 16460 , Budget ID No. D17042, Drawing Record No. 16460, Sheet No. 1-197, will be received at the office of MSD until 11:00 A.M., Local Time, July 27th, 2021, and will be publicly opened and read at that place and time. The public may attend the bid opening via call-in number.

Description and location of Project: This project includes construction of new influent bypass channel, replacement of three (3) blowers in the Service and Blower Building and associated air piping and diffusers in the influent aerated channel, primary influent channel and East headworks raw influent channel, replacement of two (2) rectangular butterfly valves in the Influent Aerated Channel, replacement of four (4) traveling bridge sludge collection mechanisms and associated screw collector system, replacement of thirty-two (32) primary influent gates, eight (8) drain gates, six (6) effluent butterfly valves, two (2) effluent gates, eight (8) primary sludge pumps, two (2) scum pumps and two (2) dewatering pumps, North and South Pump Stations piping and valve modifications, structural repairs to aerated channel, primary sedimentation basins, North and South Pump stations, North and South Pump Stations windows, doors and canopies replacement, covering of the East Headworks raw influent channel, Influent Aerated Channel, and Primary Sedimentation Basin influent, effluent channels, and effluent weir
launders, inspection of pressure relief valves located in the primary sedimentation basins, odor control system modifications and associated ductwork, electrical modifications such as addition of Motor Control Center M-P25-A, improvements to the Bio-tower Pump Station, addition of new bypass influent channel, and addition of new Chemically Enhanced Primary Treatment (CEPT) system together with all associated appurtenant as shown as in the Contract Documents. The project is located at Morris Forman WQTC at 4522 Algonquin Parkway, Louisville, KY 40211. All work shall be done in accordance to MSD’s Standard Specifications.

There will be one mandatory in person pre-bid meeting held for this project. At Morris Forman WQTC Administrative building located at 4522 Algonquin Parkway, with site walk to follow at 9:00 am Local Time, June 16th, 2021. Attendees shall follow MSD’s safety and COVID requirements.

The Engineer’s Construction Cost Estimate for this project is between $32,000,000.00 and $36,000,000.00.

The bid documents will be available on June 3rd, 2021, online at www.msdbids.com
. The charge for each set of bid documents is outlined on the above-referenced web site.

Persons wishing to view the bid documents may do so online at www.msdbids.com
or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.

The Project Manager for this Invitation to Bid is Alex Novak. All inquiries and questions prior to the bid opening shall be Directed, in writing, to MSD’s Project Manager, Alex Novak E-mail: alex.novak@louisvillemsd.org. Questions received less than five days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David Johnson, P.E.

MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $150,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:

If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at https://louisvillemsd.org/SupplierDiversity/forms

All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Project Manager, Alex Novak

MSD SUPPLIER DIVERSITY PROGRAM: Applicable

The revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective June 1, 2020. If selected as applicable above, the goals are as follows:

18.0% MBE – African American, 2.0% MBE – Asian-Indian American and
15.0% WBE – Caucasian Female participation respectively required for this project.

MBE and WBE businesses are encouraged to bid on this project as a prime contractor.

MSD BID DISCOUNT: Applicable

This MSD construction project is bid and advertised as:

Construction Services: YES   Construction-related Services: NO

LOCAL LABOR COMMITMENT PREFERENCE: Yes

COMMUNITY BENEFITS PROGRAM Yes

The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board.
MSD reserves the right to reject any or all bids or waive any informality in any bid.

LOUISVILLE AND JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

David Johnson, P.E.
Chief Engineer

Rene’ Lindsay, CPPO
One Water Chief Procurement Officer

Project Location: Louisville, Kentucky

More Details

Estill County Courthouse- HVAC Repair and Controls Upgrade

Estill County Courthouse- HVAC Repair and Controls Upgrade

This project will consist of selective repair of the existing HVAC System and upgrade of the existing Direct
Digital Controls System at the Estill County Courthouse. Generally, the replacement/upgrade consists of
work related to mechanical, testing and balancing, temperature controls and electrical.

Project Location: Irvine, Kentucky

More Details

RFB-223-21 Lake Barkley Lodge Pool Improvements

RFB-223-21 Lake Barkley Lodge Pool Improvements

Estimate:
$76,000.00
Estimated Length of Project:
50 (Substantial Completion) + 15 (Final Completion)

Provide a new Diamond Brite Coating to replace the failed Fiberglass on the Lake Barkley State Resort Park Lodge Swimming Pool.

Project Location: Cadiz

More Details

Shelbyville Municipal Water & Sewer Commission – Old Finchville Road Water Main Project

Shelbyville Municipal Water & Sewer Commission – Old Finchville Road Water Main Project

The work to be bid is generally described as follows:

5,000 L.F. – 14” Ductile Iron Water Main with accessories

80 L.F. – 24” Dia. Steel Casing by Bore and Jack

Project Location: Shelbyville, Kentucky

More Details

Somerset Water Department – Oak Hill and Bogle Street Water Main Upgrades Project

Somerset Water Department – Oak Hill and Bogle Street Water Main Upgrades Project

The work to be bid is described as follows:

CONTRACT 397-19-03

Oak Hill and Bogle Street Water Main Upgrades Project—The Project consists of constructing new booster water mains in the Oak Hill (16-inch diameter) and Bogle Street (6-inch diameter) areas, installation of a new flow control valve vault, and demolition of an existing 1 million gallon storage tank and altitude valve vault.

Project Location: Somerset, Kentucky

More Details

KCTCS System Office Roof Replacement Architectural RFP

KCTCS System Office Roof Replacement Architectural RFP

KCTCS City of Versailles Architectural RFP

Project Location: Versailles, Kentucky

More Details

Cawood Ledford Boys and Girls Club – New Gymnasium

Cawood Ledford Boys and Girls Club – New Gymnasium

The project site is located at 1 Positive Place, Harlan, KY. The bid is to furnish all necessary
labor, materials, tools, machinery, warranties, and all other items required to construct a new
Gymnasium Facility on existing vacant lot.

Project Location: Harlan, Kentucky

More Details

Clark-Floyd Landfill Drainage and Work Platform Earthwork

Clark-Floyd Landfill Drainage and Work Platform Earthwork

Click Here for Clark-Floyd Landfill Archive files

Project consists of the construction of :
CLARK-FLOYD LANDFILL DRAINAGE AND WORK PLATFORM EARTHWORK

Project Location: Clark County, Indiana

More Details

RFB-224-21 CHFS – WSNF Replace Nurse Call System

RFB-224-21 CHFS – WSNF Replace Nurse Call System

Estimate:
$227,000.00
Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

The Project consists in general of the following: Remove the existing nurse call system that serves the Nursing Facility building. Furnish and install a complete nurse call system consisting of wiring, devices and controls as indicated in the Contract Document.

Project Location: Hopkinsville

More Details

City of Lebanon – Senior Center

City of Lebanon – Senior Center

Project consists of General Construction (including all divisions 0-16, 31-33) for
construction of the new Lebanon Senior Center.

Project Location: Lebanon, Kentucky

More Details

CCK-2550-21 Polk Dalton Exterior Doors

CCK-2550-21 Polk Dalton Exterior Doors

Replace both back doors and add security badge readers to them including framing.

Project Location: Lexington, Kentucky

More Details

City of Georgetown – Streetscape Project Rebid

City of Georgetown – Streetscape Project Rebid

The work to be bid is described as follows:

Refurbishment of existing and installation of new dry stack stone wall,
installation of sidewalk, curb and gutter, lighting, and other streetscape elements
spanning 375 feet over a dry stack stone viaduct bridge along U.S. 460 and 200 feet
along Water Street in downtown Georgetown, Kentucky.

Project Location: Georgetown, Kentucky

More Details

Greenup County Board of Education – Greysbranch Elementary School Roof Replacement

Greenup County Board of Education – Greysbranch Elementary School Roof Replacement

This project consists of the removal and replacement of the existing 2-ply SBS
roofing system from the deck up to include required insulation. New roofing system will be 2-ply SBS
with 20-year no-dollar-limit (NDL) warranty.

Project Location: Greenup, Kentucky

More Details

Subscribe