Uncategorized

Melco Basin Improvement Project

Melco Basin Improvement Project

Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty Street, Louisville, Kentucky 40203 for the construction of the Melco Basin Improvement Project Contract No. 2022-021, Budget ID No. F22127, Drawing Record No. 15830, Sheet No. 1-4, will be received at the office of MSD until 10:00 a.m., Local Time, February 24, 2022, and will be publicly opened and read at that place and time. The public may attend the bid opening via teleconference call.

Description and location of Project: This project is to improve the Melco Basin with a new paved ditch installation. All work shall be done in accordance to MSD’s Standard Specifications.

There will be no pre-bid meeting held for this project.

The Engineer’s Construction Cost Estimate for this project is between $1,000,000.00 and $1,500,000.00.

The bid documents will be available on, February 4, 2022, online at www.msdbids.com. The charge for each set of bid documents is outlined on the above-referenced web site.

Persons wishing to view the bid documents may do so online at www.msdbids.com or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.

The Project Manager for this Invitation to Bid is Joseph S Exely. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer Barry Pickett at Barry.Pickett@louisvillemsd.org. Questions received less than five days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.

MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $150,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:

If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms).

All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer, Barry Pickett at Barry.Pickett@louisvillemsd.org. Due to the current Coronavirus (COVID-19) pandemic measures, MSD will be hosting a Teleconference call in the place of a face-to-face public opening. MSD will also post the As-Read Bid Summary as soon as available. To take part in the Bid Opening Teleconference Call, please call 502-654-8113 and enter code 618 271 260#.

MSD SUPPLIER DIVERSITY PROGRAM: Applicable

The revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective June 1, 2020. If applicable, the goals are as follows:

18.0% MBE – African American, 2.0% MBE – Asian-Indian American and

15.0% WBE – Caucasian Female participation respectively required for this project.

MSD BID DISCOUNT: Not Applicable

This MSD construction project is bid and advertised as: check applicable below

Construction Services: X
Construction-related Services:

LOCAL LABOR COMMITMENT PREFERENCE: No

COMMUNITY BENEFITS PROGRAM: No

The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.

MBE and WBE businesses are encouraged to bid on this project as a prime contractor.

LOUISVILLE AND JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

David Johnson, P.E.
Chief Engineer

Rene’ Lindsay, CPPO
One Water Chief Procurement Officer

Project Location: LOUISVILLE

More Details

22-03 / Northwestern Area Parkway Water Main Replacement

22-03 / Northwestern Area Parkway Water Main Replacement

Questions: Renee Fromme

Louisville Water Company is requesting Bids for the supply and install a total of 7,690+/- linear feet of distribution water main using traditional trench installation techniques, including 2,000+/- linear feet of 12-inch Pressure Class 350 ductile iron water main (includes 600′ tradition trench, 1400+/- LF of flowable encasement), 170 +/- LF of 12-inch Pressure Class 350 Restrained Joint ductile iron water main inserted through four (4) sections of 20″ steel casing pipe, 1070+/- linear feet of 12-inch DR-18 C900 PVC water main, 2,430+/- linear feet of 8-inch Pressure Class 350 ductile iron water main, 1,585+/- linear feet of 6-inch Pressure Class 350 ductile iron water main, 435+/- linear feet of 6-inch DR-18 C900 PVC water main, for sections of four (4) neighborhood streets located in Portland, west of Downtown Louisville area. Also included with the project is the transfer, renewal, relocation or discontinue of 181 +/- customer services, Fire Hydrant removal and installation, cut and plugs, restoration on and along Project Limits.

Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Renee Fromme, email at rfromme@lwcky.com.

The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $1,000,001 – $3,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.

Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in all of the following prequalification categories: 4” – 16” Ductile Iron Water Mains, AND 4” – 16” PVC Water Mains, AND 1” and smaller Water Services, AND 1.5” and Larger Water and Fire Services. Subcontractors doing Boring work must be prequalified in “12” – 36” Boring. For information about pre-qualification, contact the Buyer listed above.

The Company will award the Contract to the Bidder presenting a Bid that is responsive to the Specifications, is in substantial compliance with the Contract requirements, and presents the lowest and best price for performing the Work making up the base bid and or Bid that Company determines is in the Company’s best interest, which may not necessarily be the least expensive Bid.

Company Local Preference Program applies to this bid and resultant bid award.

Bid Documents except the Bid Table may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com. The Bid Table is available in Microsoft Excel via download from the designated portal on Louisville Water’s electronic bidding site at https://louisvillewater.bonfirehub.com/portal/.

Click Here for the List of Prequalified Bidders

Project Location: Louisville, Kentucky

More Details

CCK-2608-22 Medical Science Building 6th Floor Renovation

CCK-2608-22 Medical Science Building 6th Floor Renovation

This project will include the renovations of three existing laboratory units (MS668, MS672A/B and
MS676A/B) and a conference room.

Project Location: Lexington, Kentucky

More Details

RFB-136-22 THVC Dish Washer Upgrades

RFB-136-22 THVC Dish Washer Upgrades

Estimate:
$233,497.00
Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

The goal of this project is to replace the dishwasher and provide dishwash room upgrades for the Thomson Hood Veterans Center. The dishwash room upgrades include a new stainless-steel sink with disposer, new dish sprayers, new hose reels and other associated equipment. Architecturally, the project includes a new ceiling, soffit face material, and wall finishes including stainless steel wall splashes, wall guards, and paint. Flooring is also addressed with an anti-slip coating added to the existing tile floor.

Project Location: Wilmore

More Details

RFB-134-22 Re-Ad of RFB-88-22

RFB-134-22 Re-Ad of RFB-88-22

Estimate:
$ 75,000.00
Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

The Work includes selective replacement of storefront window system with new thermally broken storefront window system with insulating glazing. Various aluminum break metal fabrications at sills and post wraps will be included. Aluminum storefront entrance doors at south side of building will be replaced.

Project Location: Pineville

More Details

WKU-10309 Price Contract JOC Irrigation Contractor

WKU-10309 Price Contract JOC Irrigation Contractor

Bids are requested by Western Kentucky University, from eligible firms located within a 125-mile radius of Bowling Green, KY to establish price contracts for the furnishing of labor, materials, and services for a Job Order Contract for Irrigation Contractor on facilities utilized by Western Kentucky University. The Irrigation Contractor shall be capable of providing qualified and skilled tradesmen as may be required. All jobs are to include but are not limited to the Contractor acquiring any necessary permits, inspections, and Performance Bonds where required. For question regarding this bid, please select “Messages” tab in Unimarket to send a message to your WKU contact, Marci Morehead

Project Location: Bowling Green, Kentucky

More Details

LFUCG – Leestown Road FMC Culvert Replacement

LFUCG – Leestown Road FMC Culvert Replacement

The project includes providing all construction supervision, labor, materials, tools, test equipment
necessary for Leestown FMC Culvert Replacement, Lexington-Fayette County, Kentucky.

Project Location: Lexington, Kentucky

More Details

Jefferson County Public Schools – Ballard High School CTE Program Renovations

Jefferson County Public Schools – Ballard High School CTE Program Renovations

This project consists of construction of a renovation to an existing school.
The work consists of: concrete work, masonry, demolition,
mechanical, electrical, and plumbing work, and partition, flooring,
ceiling, and painting work.

The school renovation consists of approximately 2,173 s.f. Windows are
hollow metal units. Floor finishes include vct, epoxy, and ceramic tile.
Interior walls are cmu and/or metal studs with g.w.b. Wall finishes are
paint. Ceilings are suspended acoustical tile. Partial replacement of
HVAC, electrical and lighting, and sprinkler / plumbing renovations
is also included.

Project Location: Louisville, Kentucky

More Details

Jefferson County Public Schools – Doss High School Health Program Renovations

Jefferson County Public Schools – Doss High School Health Program Renovations

This project consists of construction of a renovation to an existing school.
The work consists of: concrete work, masonry, demolition,
mechanical, electrical, and plumbing work, and partition, flooring,
ceiling, and painting work.

The school renovation consists of approximately 4,437 s.f. Windows are
hollow metal units. Floor finishes include vct and ceramic tile.
Interior walls are cmu and/or metal studs with g.w.b. Wall finishes are
paint. Ceilings are suspended acoustical tile. Partial replacement of
HVAC, electrical and lighting, and sprinkler / plumbing renovations
is also included.

Project Location: Louisville, Kentucky

More Details

RFB-133-22 Thompson Hall Window Repairs

RFB-133-22 Thompson Hall Window Repairs

Estimate:
$289,169.00
Estimated Length of Project:
90 (Substantial Completion) + 30 (Final Completion)

The Schwendeman / Thompson complex is in need of complete joint sealant replacement as the joints are currently failing as identified in EOP’s DOCJT Facility Assessment report conducted March 22, 2019. All joints are to be cut out and completely replaced with silicon sealant and backer rod, locations including: Curtain wall perimeter seals, Louvers, shelf angle joints, pre-cast and masonry control and expansion joint etc. Building vertical expansion joint to be replaced with silicon coated preformed expanding cellular foam expansion joint system.

Project Location: Richmond

More Details

Boyd County Fiscal Court – Boyd County Animal Shelter

Boyd County Fiscal Court – Boyd County Animal Shelter

The Boyd County Animal Shelter project will be bid and constructed using the CM Agency method of procurement,
consisting of multiple bid packages. Successful bid package contractors would enter a contract directly with the
Boyd County Fiscal Court, whereby Trace Creek Construction, Inc. will be serving as the Owner’s agent.

The project is generally described as new construction of a single story, approximately 3,298 square feet, Animal
Shelter facility. Roughly 1,823 SF of the facility will contain the kennel area where there will be 25 individual
kennels, the remaining spaces of the building serve as a procedure room, office, storage, cat kennels, breakroom,
mechanical, restroom, and playroom space. The building will be constructed primarily of load-bearing concrete
masonry units with wood-framed trusses.

Project Location: Ashland, Kentucky

More Details

Taylor County High School-Phase 5 (Ag Science Building and Athletic Building)

Taylor County High School-Phase 5 (Ag Science Building and Athletic Building)

Scope includes construction of two metal buildings, one building to
house the Ag Science program including animal sales ring, veterinary studies clinic, Ag
farm to home kitchen. Second building to serve as an athletic building including weight
training, locker rooms, baseball hitting areas and turf practice area.

Project Location: Campbellsville, Kentucky

More Details

UK-2232-22 CM Services for Improvements to Sanders-Brown Center

UK-2232-22 CM Services for Improvements to Sanders-Brown Center

CM Services for Improvements to Sanders-
Brown Center

Project Location: Lexington, Kentucky

More Details

Jefferson County Public Schools – Coleridge Taylor Montessori Elementary School – Exterior Wood Door Replacements

Jefferson County Public Schools – Coleridge Taylor Montessori Elementary School – Exterior Wood Door Replacements

The scope of this Project shall include, but not necessarily be limited to, the purchase, delivery, construction, installation and finish painting of new insulated flush steel exterior doors, insulated flush transom panels, hardware and weatherstripping at Coleridge Taylor Montessori Elementary School, located at 1115 W. Chestnut Street in Louisville, KY. Existing hollow metal frames and thresholds shall remain. The existing wood exterior doors and transom panels shall be removed and disposed of by the Contractor. Existing hardware shall be salvaged and turned over to Jefferson County Public Schools.

Project Location: Louisville, Kentucky

More Details

Simpson County Schools – Franklin Elementary Restroom Modification & Simpson Elementary Addition & Renovation

Simpson County Schools – Franklin Elementary Restroom Modification & Simpson Elementary Addition & Renovation

The SIMPSON COUNTY BOARD OF EDUCATION will receive sealed bids for the bid packages listed for the
FRANKLIN ELEMENTARY SCHOOL & SIMPSON ELEMENTARY SCHOOL ADDITION/RENOVATIONS

Project Location: Franklin, Kentucky

More Details

Madisonville-Hopkins County Sportsplex Phase II

Madisonville-Hopkins County Sportsplex Phase II

Project consists of furnishing all labor, materials, supplies, tools,
services, etc., necessary for:

MADISONVILLE / HOPKINS COUNTY SPORTSPLEX
BID PACKAGE 2
HOPKINS COUNTY, KENTUCKY

Project Location: Madisonville, Kentucky

More Details

Grayson County Board of Education – Grayson County Middle School Renovations Project

Grayson County Board of Education – Grayson County Middle School Renovations Project

Project consists of furnishing all labor, materials, equipment and services for the
Grayson County Middle School Renovations.

Project Location: Leitchfield, Kentucky

More Details

CCK-2603-22 PAV A – 12th Floor Patient Room Fit-Out – 2402.16

CCK-2603-22 PAV A – 12th Floor Patient Room Fit-Out – 2402.16

This package involves the installation work for Bid Package # 01 – Pavilion A 12th Floor Patient Room Fit-Out Project. The work will be performed under contract with the Construction Manager, Turner Construction Company.

TC-220 Enabling Phase 1

Project Location: Lexington, Kentucky

More Details

RFB-128-22 Judy & Freddie Moore AML

RFB-128-22 Judy & Freddie Moore AML

Estimated Length of Project:
75 Calendar Days (Final Completion)

Project Location: Floyd

More Details

RFB-132-22 Re-Advertisement of RFB-107-22

RFB-132-22 Re-Advertisement of RFB-107-22

Estimate:
$960,490.00
Estimated Length of Project:
160 (Substantial Completion) + 15 (Final Completion)

Project includes all work associated with the conversion of an existing cafeteria/kitchen space into a teaching dental clinic. This consists of a full renovation of approximately 4600 square feet of interior space, as well as minor exterior work. Dental equipment will be provided under a separate contract.

Project Location: Paintsville

More Details

CITB-178-2022 Telford Hall Replacement Electrical Feeders

CITB-178-2022 Telford Hall Replacement Electrical Feeders

This invitation is for electrical upgrade of the specified items in Telford Hall at Eastern Kentucky University’s
Richmond Campus. The work includes furnishing all labor, materials, equipment and services necessary for the
complete project including all items as indicated throughout the attached specifications.

Project Location: Richmond, Kentucky

More Details

CITB-179-2022 University Building Window Replacement

CITB-179-2022 University Building Window Replacement

This invitation is for complete window replacement as specified in the following bid at Eastern Kentucky
University’s Richmond Campus. The work includes furnishing all labor, materials, equipment and services
necessary for the complete project including all items as indicated throughout the attached specifications.

Project Location: Richmond, Kentucky

More Details

Boyd County Fiscal Court – Boyd County Road Department – Interior Renovation

Boyd County Fiscal Court – Boyd County Road Department – Interior Renovation

The bid is to furnish all
necessary labor, materials, tools, machinery, warranties, and all other items required to
renovate a designated area within the Road Department Building located at 12327 Cr-1347, Ashland, KY 41101.

Project Location: Ashland, Kentucky

More Details

Jefferson County Public Schools – Security Vestibules – Phase I

Jefferson County Public Schools – Security Vestibules – Phase I

The scope of this Project shall include, but not necessarily be limited to, selective demolition and the purchase,
delivery, construction and installation of new metal stud and drywall partitions, hollow metal frames, steel doors,
counter millwork, suspended acoustical ceiling tile and grid (new and existing modifications), door hardware (new and existing modifications), painting, resilient floor tile, carpeting, wall base, electrical circuit revisions, electrical
outlet installations, new light fixtures (and existing fixture) relocations, security and life safety (fire alarm) wiring, data wiring and modifications at the following schools in Louisville, Ky:

BASE BID (All 8 Schools)
• Atkinson Academy; 2811 Duncan Street
• Brandeis Elementary School; 2817 West Kentucky Street
• Cochran Elementary School; 500 West Gaulbert Avenue
• Coleridge Taylor Montessori Elementary School; 1115 West Chestnut Street
• Frayser Elementary School; 1230 Larchmont Avenue
• King Elementary School; 4325 Vermont Avenue
• McFerran Preparatory Academy; 1900 South 7th Street
• Young Elementary School; 3526 West Muhammad Ali Blvd.

ALTERNATE BIDS (Separate Bids Each)
• Carter Traditional Elementary School; 3600 Bohne Avenue
• Engelhard Elementary School; 1004 South 1st Street

Project Location: Louisville, Kentucky

More Details

RFB-112-22 Hopkins County Salt Structure

RFB-112-22 Hopkins County Salt Structure

Estimate:
$219,471.00
Estimated Length of Project:
75 (Substantial Completion) + 30 (Final Completion)

This project is for the construction of a 80’-3” long x 62-0” wide x 10’ high concrete structure with an interior concrete pad and concrete entrance apron for the purpose of bulk storage of roadway, deicing salt.
Class “A” concrete to be reinforced with epoxy coated rebar & fiber, which shall be used throughout the shallow, spread footing and walls. The Contractor shall be required to perform all excavation, filling, grading, & compaction of sub-grade and sub-base necessary for the construction of footing, interior pad, and entrance apron.
Concrete walls will be ten (10) feet high, will be twelve (12) inches thick, will be constructed on the concrete footing, and will support a pre-engineered, membrane covered (roof) structure (PMCS) with trusses being fourteen (14) foot on-centers. The roof structure is to be furnished and installed separately by Bulk Storage, Inc., per their current Master Agreement upon completion of the footing and walls under this contract. The (PMCS) is not a part of this Scope of Work.
Nine (9) inch thick, Class “AA” concrete modified with fiber & epoxy coated rebar, concrete slabs shall be placed inside the footing and at the entrance on the exterior of the structure.

Project Location: Hopkins

More Details

Subscribe