Uncategorized

Estill County Board of Education – Estill County High School ARP ESSER HVAC Controls

Estill County Board of Education – Estill County High School ARP ESSER HVAC Controls

This project scope includes HVAC controls at the existing Estill County High School building.

Project Location: Irvine, Kentucky

More Details

Middlesboro Independent Board of Education – Performing Arts & Education Center Renovation

Middlesboro Independent Board of Education – Performing Arts & Education Center Renovation

Project consists of the replacement of the existing HVAC Equipment; replacement
of the existing metal wall panel system and roof edge metals with a new metal wall panel system and roof edge metals; removal of the existing translucent roof system at Main Lobby with new standing seam metal roof system, repainting of exposed steel lintels, light poles/bases, and exterior pole mounted light fixtures; and other miscellaneous building maintenance items including replacement of sealants at existing windows and masonry control joints; and cleaning of the existing masonry brick veneer.

1. Project cost range is anticipated to be under $1,088,000.00

Construction Contract: Bids will be received for the following Work:

 1. General Contract (all trades).

Project Location: Middlesboro, Kentucky

More Details

City of Elizabethtown – State Theater Kitchen Renovation

City of Elizabethtown – State Theater Kitchen Renovation

Notice is hereby given that the City of Elizabethtown will receive sealed bids for the
State Theater Kitchen Renovation Project

Project Location: Elizabethtown, Kentucky

More Details

City of Elizabethtown – Public Works Maintenance Building

City of Elizabethtown – Public Works Maintenance Building

Notice is hereby given that the City of Elizabethtown will receive sealed bids for the Elizabethtown
Public Works Facility Maintenance Building Project

Project Location: Elizabethtown, Kentucky

More Details

Blue Grass Airport – Boiler Room 1 – Chiller Replacement – 2112

Blue Grass Airport – Boiler Room 1 – Chiller Replacement – 2112

The Project shall consist of the replacement of the Chiller in Boiler Room 1 in the
Terminal Building at Blue Grass Airport.

Project Location: Lexington, Kentucky

More Details

Salyersville Water Works – Water Intake Pump Replacement

Salyersville Water Works – Water Intake Pump Replacement

This project consists of the providing of all materials, labor, and equipment for the construction of one (1) 1,000
GPM raw water intake pump.

Project Location: Salyersville, Kentucky

More Details

Salyersville Water Works – Water Intake Generator

Salyersville Water Works – Water Intake Generator

This project consists of the providing of all materials, labor, and equipment for the construction of one emergency
gas generator, gas line, and generator pad.

Project Location: Salyersville, Kentucky

More Details

Trigg County Board of Education – Multi-Purpose Building & Athletic Improvements

Trigg County Board of Education – Multi-Purpose Building & Athletic Improvements

Project cost range is anticipated to be under $4,100,000.00.

Construction Contract: Bids will be received for the following Work:

 1. General Contract (all trades).

Project Location: Cadiz, Kentucky

More Details

CCK-2592-22 LRC Residence Construction

CCK-2592-22 LRC Residence Construction

Per the Project drawings, erect a 42’ (width) x 42’ (length) residence for the University of
Kentucky, College of Agriculture.

Project Location: Lexington, Kentucky

More Details

Trigg County Board of Education – Bus Garage, Fuel Pumps & Tanks

Trigg County Board of Education – Bus Garage, Fuel Pumps & Tanks

Project cost range is anticipated to be under $350,000.00.

Construction Contract: Bids will be received for the following Work:

 1. General Contract (all trades).

Project Location: Cadiz, Kentucky

More Details

RFB-93-22 RE-ADVERTISEMENT OF RFB-51-22

RFB-93-22 RE-ADVERTISEMENT OF RFB-51-22

Estimate:
$1,457,840.00
Estimated Length of Project:
210 (Substantial Completion) + 30 (Final Completion)

The scope of this project is to demolish three (3) existing roof top exhaust (RTE) units, provide and install three (3) replacement RTE units and perform all necessary trades to bring new units on-line. The base bid units are specifically identified as being RTE-1, RTE-2, RTE-3 as identified in the design documents. The roofing system is to be protected during construction and architectural screen wall assemblies to be temporarily supported and re-braced. Project to include all necessary cranes and rigging to demolish existing equipment and install new rooftop mounted air handling units.

Project Location: Frankfort

More Details

CCK-2591-22 PAV H Replace Revolving Front Door

CCK-2591-22 PAV H Replace Revolving Front Door

Project involves the replacement of the revolving door and side doors on the first floor of the
main entry of Pavilion H at the Chandler Medical Center. Concrete work, drywall and metal
framing, insulation, storefront framing and glass, finishes, and revisions for HVAC and
electrical are included.

Project Location: Lexington, Kentucky

More Details

Madisonville / Hopkins County Fiscal Court – Sportsplex BP1 – Rough Grading

Madisonville / Hopkins County Fiscal Court – Sportsplex BP1 – Rough Grading

Project consists of furnishing of all labor, materials, supplies, tools,
services, etc., necessary for:
MADISONVILLE / HOPKINS COUNTY SPORTSPLEX
BID PACKAGE I – ROUGH GRADING

Project Location: Madisonville, Kentucky

More Details

CITB 163-2022 Pipe Insulator Services

CITB 163-2022 Pipe Insulator Services

EKU is seeking qualified companies to provide pipe insulation services including applying, removal and repair
of insulation supports. Services also need to include application of insulating materials, surface cladding and
coating to pipes, vessels, tanks, ductwork and associated equipment or other mechanical systems as applicable.

Project Location: Richmond, Kentucky

More Details

RFB-92-22 KHP Campground Hydrants

RFB-92-22 KHP Campground Hydrants

Estimate:
$ 68,409.00
Estimated Length of Project:
30 (Substantial Completion) + 30 (Final Completion)

Removal of existing hydrants at 120 existing camp sites and replace with 120 new frost proof hydrants. Hydrant / hydrant assembly to be provided by Owner and installed by Contractor. Contractor to provide and install fitting and connections as indicated in the Drawings, and shall restore areas around hydrants damaged or disturbed by construction.

Project Location: Lexington

More Details

CCK-2590-22 Huguelet Tunnel Phase 1 – 2568.0

CCK-2590-22 Huguelet Tunnel Phase 1 – 2568.0

Huguelet Tunnel Phase 1

Terminate ends of the tunnel under Huguelet and infill the tunnel under Huguelet with
flowable fill. This will include termination of electric in the infilled section.

Project Location: Lexington, Kentucky

More Details

RFB-88-22 KDF Pineville Window Replacement

RFB-88-22 KDF Pineville Window Replacement

Estimate:
$ 94,975.00
Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)


The Work includes selective replacement of storefront window system with new thermally broken storefront window system with insulating glazing. Various aluminum break metal fabrications at sills and post wraps will be included. Aluminum storefront entrance doors at south side of building will be replaced. Selective areas of board and batten siding will be removed and replaced with new painted PVC board and batten siding. Selective areas of exterior stone masonry will be re-pointed where deteriorated. Existing copper gutters and downspouts will be re-painted.

Project Location: Pineville

More Details

RFB-86-22 KCIW Switchgear Replacement

RFB-86-22 KCIW Switchgear Replacement

Estimate:
$805,000.00
Estimated Length of Project:
210 (Substantial Completion) + 14 (Final Completion)

The Project involves replacement of the exterior, pad-mount, 15 kV switchgear serving the KCIW. Installation of the replacement switchgear, transfer of medium voltage services and removal of the existing switchgear must be performed in a sequenced work effort coordinated with the KCIW and the local utility. Associated work of the Project includes, but is not limited to, trenching and backfill for installation of direct-buried conduits, construction of equipment pad and the installation and termination of 15 kV rated cables. Work of the Project is outside of the KCIW security boundary.

Project Location: Peewee Valley

More Details

RFB-91-22 Courtyard Concrete Pavement Replacement

RFB-91-22 Courtyard Concrete Pavement Replacement

Estimate:
$ 70,000.00
Estimated Length of Project:
90 (Substantial Completion) + 30 (Final Completion)

The project consists of demolition of the existing slab-on-grade concrete pavement and construction of a new slab-on-grade concrete paving in the courtyard at the Southeast Community & technical College, as shown on the attached documents.
Work includes demolition of existing slab-on-grade concrete pavement and associated reinforcement; placement of new slab-on-grade concrete pavement and associated reinforcement; and the installation of new surface water drainage and associated piping to an existing catch basin. The goal of the project is to remove and replace the concrete pavements in the courtyard with dimensions being approximately 145’-0″ long by 40’-0″ wide, less two raised planting areas to remain (12’-0″ X 24’-0″). In addition, the project requires the replacement of the existing 6-inch drains with three larger drains for easier cleaning, including a new 6-inch drain line from each drain to the catch basin discharge point.

Project Location: Cumberland

More Details

KCTCS – System Office Building Roof Repair/Replacement

KCTCS – System Office Building Roof Repair/Replacement

Project consists of The project involves re-roof work at the KCTCS –
System office building in Versailles, KY. The existing approximately 128,000 square foot roof to
be removed is spray foam apllied roof over built up asphalt on multiple deck conditions. Multiple
decks include metal deck, light weight concrete and gypsum deck. The new roof system is a
SBS Modified Asphalt Two Ply system that is cold adhered over rigid board insulation system.
The existing roof drains are to be reused. Three new roof drains and associated piping will be
installed. All pre-finished metal roof coping caps, flashings, accessories and terminations are to
be replaced.

  1. Project cost range is anticipated to be under $2,938,000.

Construction Contract: Bids will be received for the following Work:

  1. General Contract (all trades).

Project Location: Versailles, Kentucky

More Details

CCK-2589-22 CAER Mineral Processing Building – 2544.0

CCK-2589-22 CAER Mineral Processing Building – 2544.0

The University of Kentucky Center for Applied Energy Research – Mineral Processing Facility
Expansion project includes the approximate 2,000 square foot addition to the existing Mineral
Processing building.

The design includes the construction of a new attached addition that will complement the
functions of existing Mineral Processing building already located on the CAER campus. The
new addition will include space for dry materials storage and processing equipment. The new
structure will include concrete foundations, structural steel framing, and metal panels. The
design will need to incorporate the mechanical/electrical/ plumbing infrastructure for all new
and existing equipment to be located in the completed facility.

Project Location: Lexington, Kentucky

More Details

RFB-90-22 EKVC Dish Machine Replacement

RFB-90-22 EKVC Dish Machine Replacement

Estimate:
$113,500.00
Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

Project is for the replacement of an existing conveyor dishwasher with new dishwasher and related utility connections. A new dishwasher exhaust system and ductwork shall be provided. Existing dishwashing room shall be stripped and repainted and a new ceiling installed. New light fixtures shall be installed in the dishwashing area.

Project Location: Hazard

More Details

RFB-70-22 Testing and Balancing Services

RFB-70-22 Testing and Balancing Services

Estimate:
$ 50,000.00
Estimated Length of Project:
August 28, 2023 (Final Completion)

Scope of work for the TAB (Testing Adjusting and Balancing) Agency consists of furnishing all required materials, tools, instruments, coordination, participation, and labor to perform and complete the TAB services per the Project plans and specifications for the above referenced Building Project.

Project Location: Frankfort

More Details

UK-2214-22 Construction Management Services for Parking Structure 8 Expansion – 2565.0

UK-2214-22 Construction Management Services for Parking Structure 8 Expansion – 2565.0

The University of Kentucky desires the services of an experienced and highly qualified construction
management firm to provide “FULL SERVICE” construction management on the proposed project.
The Construction Manager (CM) selected will become a responsible, cooperative and contributing
member of the Owner’s professional team for the design and construction of the project.

Project Location: Lexington, Kentucky

More Details

City of Taylorsville – Contract 25A Hunter Rd

City of Taylorsville – Contract 25A Hunter Rd

The project includes but is not limited to the following:

a) 3150 LF 6″ C-900 DR 14 PVC Waterline (Labor Only)
b) 5 EA 6″ Gate Valves (Labor Only)
c) 2 EA Fire Hydrants (Labor Only)
d) 1 LS Miscellaneous Items

Project Location: Taylorsville, Kentucky

More Details

Subscribe