Uncategorized

Boyle County Board of Education – Boyle County High Field Turf Replacement

Boyle County Board of Education – Boyle County High Field Turf Replacement

Project consists of furnishing all labor, materials, equipment and services for the
Boyle County High School Athletic Field Turf Replacement.

Project Location: Danville, Kentucky

More Details

City of Paintsville – 112 River Road Slope Repair

City of Paintsville – 112 River Road Slope Repair

This project consists of a unit price bid for the clearing, regrading, and repair of the slope at the 112 River Road site.

Project Location: Paintsville, Kentucky

More Details

CCK-2597-22 Huguelet Tunnel Phase 1A – 2568.0

CCK-2597-22 Huguelet Tunnel Phase 1A – 2568.0

Huguelet Tunnel Phase 1A

Install a new 2” high pressure return pipe (HPR) from the existing west side of the tunnel under Rose St at Huguelet and extend to the existing steam vault near Small Animal steam vault. In addition, install a new 3” forced main on the sump pump from the west side tunnel to the closest sanitary manhole. Extend new electrical service from the existing Small Animal steam vault to the existing west side tunnel and provide new lighting and power in the west side tunnel.

Project Location: Lexington, Kentucky

More Details

Letcher County Public Schools – Security Vestibules

Letcher County Public Schools – Security Vestibules

Project cost range is anticipated to be under $700,000.00.

Construction Contract: Bids will be received for the following Work:

1. General Contract (all trades).

Project Location: Whitesburg, Kentucky

More Details

Shelby Municipal Water & Sewer – Main Street Water Main Replacement Project

Shelby Municipal Water & Sewer – Main Street Water Main Replacement Project

The work to be bid is generally described as follows:

2,100 L.F. – 10” Dia. Ductile Iron Water Main with accessories

Project Location: Shelbyville, Kentucky

More Details

Town of Clarksville – Lincoln Drive Trunk Sewer and Pump Station 3 Elimination

Town of Clarksville – Lincoln Drive Trunk Sewer and Pump Station 3 Elimination

The scope of work includes: 2372 LF of 24–inch SDR 26/PS 115 PVC, 2157 LF of 24-inch SDR 35/PS 46
PVC, 80 LF of 15-inch SDR 35 PVC, 21 LF of 8-inch SDR 26 PVC, and 1595 LF of 6-inch SDR 35 PVC
gravity sewer pipe, and 2636 LF of 16-inch DR 21 C905 PVC sanitary force main;18 manholes; construction of
junction structure, abandoning and demolition of an existing pump station; connecting existing property service
laterals to the new sewer, abandonment and/or demolition of existing sewer pipes and manholes; also drainage
improvements including 560 LF of 16-inch DR 32.5 C905 PVC storm sewer pipe, 160 LF of 12-inch PVC
SDR 35 storm sewer pipe, 1181 LF of 12-inch HDPE storm sewer pipe, catch basins, knockout boxes, curb
inlets, and manholes for storm sewer system. Connections to existing sewer and drainage systems and other
appurtenances as shown on the plans, plus Traffic Control, EPSC and roadway and surface restoration.

Project Location: Clarksville, Indiana

More Details

Henry County Board Of Education – Henry County High School Partial Flooring, Windows & Doors Replacement

Henry County Board Of Education – Henry County High School Partial Flooring, Windows & Doors Replacement

Henry County High School Partial Flooring, Windows and Door Replacement

Project cost range is anticipated to be under $490,000.00

Construction Contract: Bids will be received for the following Work:

1. General Contract (all trades).

Project Location: New Castle, Kentucky

More Details

City of Jeffersontown – Veteran’s Memorial Park Phase II: BP1 Earthwork & Utilities

City of Jeffersontown – Veteran’s Memorial Park Phase II: BP1 Earthwork & Utilities

Click Here for Veterans Memorial Park Phase 2 Reference Drawings

Project consists of general site demolition and clearing of the site, earthwork for the site based on the grading plan, removal of existing fill material below the proposed Amphitheater building and placement of controlled fill per the Geotechnical recommendations, site utilities, and construction of a retaining wall east of Ruckriegel Parkway. Bids shall include all labor, materials, equipment, and incidentals necessary to complete the work as shown on the plans and specifications, including clean-up and disposal of all
materials.

Project Location: Jeffersontown, Kentucky

More Details

CITB-170-2022 Begley Lift Station

CITB-170-2022 Begley Lift Station

Eastern Kentucky University is seeking qualified firms to bid on the second phase of the force main lift station at the
Begley Building.

Project Location: Richmond, Kentucky

More Details

Bell County Board of Education – SFCC Projects Yellow Creek School Center & Page School Center

Bell County Board of Education – SFCC Projects Yellow Creek School Center & Page School Center

Project consists of the replacement of the existing paved drive lanes and
parking lot areas; replacement of the existing interior light fixtures throughout each facility and
new electrical upgrades to provide wireless access points in the existing classroom instructional
spaces at each facility.

Project Location: Middlesboro/Pineville Kentucky

More Details

Wood Creek Water District – Contract 3 – Water Meter Purchase

Wood Creek Water District – Contract 3 – Water Meter Purchase

The project consists of purchasing 2,500 AMR water meters
and all necessary appurtenances.

Project Location: London, Kentucky

More Details

RFB-101-22 KCTCS – Gateway CTC Marx Bldg 1st Floor Reconfiguration

RFB-101-22 KCTCS – Gateway CTC Marx Bldg 1st Floor Reconfiguration

Estimate:
$493,900.00
Estimated Length of Project:
180 (Substantial Completion) + 30 (Final Completion)

The project consist of the reconfiguration of approximately 4,000 square feet of space on the 1st floor of the Marx building located at 516 Madison Avenue in Covington Kentucky. The Marx Building was completely renovated in 2015. When complete the renovated space will house 2 classrooms, 2 labs and a tank storage area.

Project Location: Florence

More Details

Fayette County Public Schools – Lafayette High School Softball Field House

Fayette County Public Schools – Lafayette High School Softball Field House

The Scope of Work intent of the project is to construct a new Softball Field House on the existing
grounds of Lafayette High School. This work includes excavation, concrete foundations, concrete
slabs, masonry, wood trusses, asphalt shingle roofing, painting, toilet partitions, toilet accessories,
plumbing, mechanical systems, power, light fixtures and other miscellaneous related work to complete the
aforementioned project.

Project Location: Lexington, Kentucky

More Details

Jefferson County Public Schools – Western Middle School – Phase 1 HVAC Renovation BP 1

Jefferson County Public Schools – Western Middle School – Phase 1 HVAC Renovation BP 1

The Jefferson County Public School system will receive sealed bids for the furnishing of all labor and materials and the performance of all work required for the:

Western Middle School – Phase 1 HVAC Renovation
2201 West Main Street, Louisville, KY 40212
BID PACKAGE 1

Project Location: Louisville, Kentucky

More Details

City of Danville – Lebanon Road / Clarks Run Trunk Sewer Improvements – Phase 1

City of Danville – Lebanon Road / Clarks Run Trunk Sewer Improvements – Phase 1

The project consists of constructing gravity sanitary sewer lines, manholes and appurtances in the Clark’s Run sewershed and along Lebanon Road.

Project Location: Danville, Kentucky

More Details

RFB-99-22 Shelter Replacements for KEWS

RFB-99-22 Shelter Replacements for KEWS

Estimate:
$811,741.00
Estimated Length of Project:
150 (Substantial Completion) + 30 (Final Completion)

This project involves site preparation and restoration, shelter replacement, and equipment relocation at selected locations across the Commonwealth. At most sites, existing fiberglass shelters will be replaced with new concrete pre-cast Fibrebond shelters and all equipment moved from the old to the new shelter. Refer to the construction drawings for site-specific upgrades and modifications including site expansion, new generators, new propane tanks, and relocation of existing site components.

Project Location: Western KY

More Details

Harrison County Board of Education – Harrison County Middle & High School Security Upgrades

Harrison County Board of Education – Harrison County Middle & High School Security Upgrades

The project sites are located at 320 Webster Ave., and 269 Education Dr., Cynthiana, KY
41031. The bid is to furnish all necessary labor, materials, tools, machinery, warranties, and
all other items required to meet the renovations per plans and specifications. Work to
include, but not limited to; Aluminum Storefront, Casework, Access Control, VCT Flooring
and Secondary Electrical Circuits.

Project Location: Cynthiana, Kentucky

More Details

Estill County Board of Education – Estill County High School ARP ESSER Sanitary Line Replacement REBID

Estill County Board of Education – Estill County High School ARP ESSER Sanitary Line Replacement REBID

This project scope includes the replacement of the sanitary line at the existing
Estill County High School building. For the REBID of this project, the scope has been altered to
remove the asphalt work, grading of the subgrade, and concrete patching.

Project Location: Irvine, Kentucky

More Details

LFUCG – Lakeshore Drive Pump Station Replacement

LFUCG – Lakeshore Drive Pump Station Replacement

The project includes providing all construction supervision, labor, materials, tools, test equipment
necessary for the LAKESHORE DRIVE PUMP STATION REPLACEMENT. The project is
located at 544 Lakeshore Drive, Lexington, KY. The work will be construction of one
comminutor/splitter manhole, two wet wells, a valve vault, and associated piping. There will be
approximately 80 LF of 6” DIP force main to be constructed. Two submersible pumps will be
installed, one in each wet well. One comminutor will be installed. Associated electrical work shall
be performed.

Project Location: Lexington, Kentucky

More Details

RFB-98-22 Governor’s Mansion Roof Replacement & Repairs

RFB-98-22 Governor’s Mansion Roof Replacement & Repairs

Estimate:
$185,500.00
Estimated Length of Project:
90 (Substantial Completion) + 15 (Final Completion)

Roof Overlays: Attach insulation recovery board over existing roof systems as noted. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over recovery board insulation. Provide new metal components; e.g. metal counter flashings, edge metals, gutters, down spouts, curb cap, plumbing vent flashings, jacks/ collars, etc..

Project Location: Frankfort

More Details

City of Danville – Direct Purchase of PVC Pipe Request for Proposal

City of Danville – Direct Purchase of PVC Pipe Request for Proposal

The intent of this project is to provide pipe materials for implementation by City of Danville to be used in multiple municipal projects. The City reserves the right to negotiate the final purchased pipe quantities to comply with funding availability. Delivery of any purchased materials to the City of Danville shall be conducted in accordance with all applicable state and federal regulations.

Project Location: Danville, Kentucky

More Details

Middlesboro Independent Board of Education – West End Elementary School – Gymnasium HVAC Renovation

Middlesboro Independent Board of Education – West End Elementary School – Gymnasium HVAC Renovation

Project consists of the replacement of the existing HVAC system at the existing Gymnasium.

  1. Project cost range is anticipated to be under $310,000.00

Construction Contract: Bids will be received for the following Work:

  1. General Contract (all trades).

Project Location: Middlesboro, Kentucky

More Details

Town of Paoli – Paoli 2021-2 CCMG Paving Projects

Town of Paoli – Paoli 2021-2 CCMG Paving Projects

The project set consists of milling and HMA resurfacing, with full depth HMA patching as required along
various streets throughout the Town of Paoli.

Project Location: Paoli, Indiana

More Details

Logan County Board of Education – Logan County Schools Secure Entry Vestibules

Logan County Board of Education – Logan County Schools Secure Entry Vestibules

This project scope includes renovations to four Logan County schools to increase
security by creating secure vestibules at the main entrance to each building. The scope of work
includes selective demolition as well as new doors, storefront and hollow metal window installation.
Interior fit-up construction includes gypsum board wall construction and interior finishes. An alternate
is also included to construct a new steel frame awning with a metal roof at one location.

Project Location: Russellville, Kentucky

More Details

Spencer Co Fiscal Court – Architectural Services RFQ

Spencer Co Fiscal Court – Architectural Services RFQ

Spencer County Fiscal Court is considering establishing an auxiliary EMS Ambulance facility at Waterford Park in Spencer County. We are seeking qualified professional architectural services to design and provide detailed drawings, specifications and construction estimates for a one-story brick exterior garage type structure with attached living quarters to accommodate 1 ambulance and 2 EMS employees. Approximate size 32’ x 40’ Successful applicant will also provide construction oversight if project is approved for construction.

Project Location: Taylorsville, Kentucky

More Details

Subscribe