The project is focused exterior repairs on three buildings at the Main Campus. Work at the Main Campus includes landscaping wall repairs at the Campus Center (CC) and the Academic Building (ACA), and removal of skylight at the Learning Resource Center (LRC). The skylight opening will be replaced with clerestory windows and sloped roof system. Project work involves demolition, concrete, masonry, steel framing, roofing, railings, windows, and finishes.
Estill County Board of Education – South Irvine Early Childhood Center ARP ESSER Renovation
Estill County Board of Education – South Irvine Early Childhood Center ARP ESSER Renovation
The project scope includes demolition of existing windows in original portion of
the school and replace with new exterior wall and windows. The project will also provide a secure
entry vestibule at the main entrance of the school.
Grayson County Board of Education – Security Vestibules at Four Grayson County Schools
Grayson County Board of Education – Security Vestibules at Four Grayson County Schools
The Work consists of selective demolition and construction of new security vestibules within the existing lobbies of four separate school facilities. New construction shall include but not be limited to new steel stud and gypsum board partitions, aluminum storefront frames, new doors and frames, new ceilings and finishes, custom casework, and associated mechanical, electrical, and lighting.
Estimated Length of Project: July 11, 2022 (Substantial Completion) + 15 (Final Completion)
Project Description: The project consists of an interior renovation of the existing building. The renovation will include the demolition and reconstruction of new latrines. New hollow metal doors, frames, and new door hardware. Interior finishes including ceiling grids, wall paint, resinous flooring, and CMU walls. Improvements to building mechanical systems including plumbing, heating, ventilation, and air conditioning. Renovations to building electrical systems including power, lighting. All plumbing fixtures in the restrooms will be replaced and a new natural gas fired water heater will be added to serve the new showers. LED light fixtures will take the place of existing fixtures. A new 1000 gallon propane tank and pad will be part of this project.
CCK-2622-22 Renew/Modernize Frazee Hall Bid Package #3 – All Work Categories – Core & Shell Project 2511.8
CCK-2622-22 Renew/Modernize Frazee Hall Bid Package #3 – All Work Categories – Core & Shell Project 2511.8
The Renew/Modernize Frazee Hall project includes returning the exterior of the building to its 1907 appearance while modernizing the interior to fit the needs of the University of Kentucky’s staff and students.
Project involves upgrading the electrical distribution equipment, within Buildings 14, 15, 21,22, 28, 48, 49, 50, 51, 55-63 (main building), 78/79, and 162. New distribution will be provided in the Electrical Building 41 to serve Buildings 55-60. New exterior ductbanks will be provided. Existing exterior building mounted light fixtures around Main Building will be replaced with LED. The existing campus public address system will be replaced.
RFB-165-22 Group I LON 22 – Bond Forfeiture – Knox County, KY
RFB-165-22 Group I LON 22 – Bond Forfeiture – Knox County, KY
Estimated Length of Project:
(Substantial Completion) + October 31, 2022 (Final Completion)
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 81.8 acres of mine land in Knox County, Kentucky. The work will consist of pond removal, gradework, ditch work, and revegetation of one bond forfeiture permit.
Estill County Board of Education – Estill County Middle School ARP ESSER Restroom Renovations
Estill County Board of Education – Estill County Middle School ARP ESSER Restroom Renovations
This project scope includes replacement of plumbing fixtures and exhaust
systems, as well as new interior finishes in facility restrooms and locker rooms.
WKU-10322 Job Order Contract for Concrete/Sidewalk Contractors
WKU-10322 Job Order Contract for Concrete/Sidewalk Contractors
The Contractor shall be required to furnish all labor, materials, supplies, equipment, permit,
bonds, and supervision, and anything else required to complete the projects. The University
reserves the right to furnish materials, supplies, and/or equipment when evaluated to be in the
best interest of the University. It is the intent of this bid to establish a minimum of three (3)
contracts which will provide for everything required to perform work and related services as
needed by WKU. There shall be no guarantee of any quantities of work, only what shall be
needed.
Mount Sterling Montgomery County Parks & Recreation – Botts Park / EZ Walker Park
Mount Sterling Montgomery County Parks & Recreation – Botts Park / EZ Walker Park
Project consists of two separate project bid scopes. Bidders may
bid on one project or both projects.
1. SCOPE #1 – BOTTS PARK – Construction of a masonry free standing restroom
pavilion, and associated site utilities.
2. SCOPE #2 – EZ WALKER PARK – Construction of a new children’s playground
including playground equipment, play surface and site connection walkway. This
playground will accommodate mobility-impaired users.
RFB-163-22 Elizabeth Joseph Drainage, AML, Floyd Co., KY
RFB-163-22 Elizabeth Joseph Drainage, AML, Floyd Co., KY
Estimated Length of Project:
(Substantial Completion) + 45 Calendar Days (Final Completion)
The Elizabeth Joseph Drainage site is located at 315 Hoover Hollow, Garrett in Floyd County, KY, 41630. GPS coordinates at the site are 37° 28’ 9.13″N, 82° 48’ 10.37″W. On January 3, 2022, the culvert crossing the property originally installed as part of an OSM reclamation project failed during a heavy precipitation event damaging the citizen’s yard and impacting access to the driveway servicing the residence.
To address this concern, the failed pipe will be removed and replaced with 48” HDPE pipe with headwalls on the inlet and outlet. The material generated during excavation will be used as an alternate pipe bedding or used onsite to create positive drainage in the yard area. Class II/III stone will be used to further armor erosion prone areas near the headwalls. Revegetation of all disturbed areas will be addressed using standard residential seeding practices. The impacted concrete driveway will be replaced in kind. An allowance for removal, relocation and repair of existing utilities within the work area has been included. No material will be transported to an off-site waste area.
The cost estimate for this work also includes bid items for site preparation, hoe ram, filter fabric, and roadway stone to facilitate the construction. In total, the project area encompasses approximately 0.5 acres between the public road (Hoover Hollow) and the citizen’s residence as marked on the plans.
This project will not address underground mine openings. No trees will be disturbed outside of the unstable landslide area. All areas disturbed by this project will be revegetated by means of standard AML residential seeding practices. Sediment control will be provided by installation of silt checks or silt traps downstream of the work area.
Estill County Board of Education – Estill County High School – ARP ESSER Field House Restroom Renovation REBID
Estill County Board of Education – Estill County High School – ARP ESSER Field House Restroom Renovation REBID
This project scope includes providing additional plumbing fixtures, replacing
exhaust systems, and providing new interior finishes in the field house restrooms.
Blue Grass Airport – Aircraft Rescue and Fire Fighting Training Center Modernization
Blue Grass Airport – Aircraft Rescue and Fire Fighting Training Center Modernization
The scope of work, at a minimum, will include all work required to provide an Index E simulator,
cab control devices, fuel delivery system, ramp and building modifications to deliver a project that
is fully functional for all users.
A. Existing Training System
The existing training system was installed by the Symtron Corporation in 1998. It uses
Programmable Logic Controllers (PLC) and Windows based desktop computer
controllers and Liquified Petroleum Gas (LPG) as the fuel source. The system is
specifically composed of the following:
1. The SPILL Trainer
2. The SAFT Trainer
3. 30,000-gallon LPG storage tank
4. LPG delivery system (piping, pumps, valves, thermocouples etc.)
5. PLC cabinetry, desktop PC, hardware, and software
6. Live Fire Control Tower
7. Multipurpose Building
8. Classroom and support facilities
9. Vehicle Storage Bay
All existing simulator equipment (tentatively identified as items 1-5 above) are to be
replaced as part of this project
The project involves removing and replacing brick wall areas to install thru-wall flashing above the existing roof in select locations. Additional scope involves removing all aluminum frame windows and glass block windows and their lintels and replacing them with blast resistant aluminum storefront windows and galvanized steel lintels. There is an allowance for brick tuckpointing. The brick on the building will be washed and a sealer applied. The project is located at the National Guard Armory in Hazard, KY.
Muhlenberg County Board of Education – Muhlenberg County North Middle School – Security Vestibules
Muhlenberg County Board of Education – Muhlenberg County North Middle School – Security Vestibules
The project sites are located at 1000 N. Main St., Powderly, KY 42367. The bid is to furnish
all necessary labor, materials, tools, machinery, warranties, and all other items required to
meet the renovations per plans and specifications. Work to include, but not limited to;
Aluminum Storefront, Casework, Access Control, VCT Flooring and Secondary Electrical
Circuits.
UK-2248-22 Construction Management Services for College of Medicine and Health Education Building – 2564.0
UK-2248-22 Construction Management Services for College of Medicine and Health Education Building – 2564.0
The University of Kentucky desires the services of an experienced and highly qualified construction
management firm to provide “FULL SERVICE” construction management on the proposed project.
The Construction Manager (CM) selected will become a responsible, cooperative and contributing
member of the Owner’s professional team for the design and construction of the project. The
Construction Manager (CM) will provide assistance and advice and provide management services to
the Owner and design consultants to assure the project is completed within defined budget, program
and schedule.
Springfield Water and Sewer Commission – Rizer Avenue Pump Station Replacement
Springfield Water and Sewer Commission – Rizer Avenue Pump Station Replacement
The Project includes the following Work:
Construction of a new 350 gpm pump station to replace the existing Rizer Avenue Pump Station.
Work includes two (2) 15 hp submersible pumps, precast wet well, precast valve vault, gravity sewer
to new wet well, tie-in to existing force main, and demolition of the existing wet well and pump
housing.
Green-Taylor Water District – Contract 1 – US68 Waterline Relocation
Green-Taylor Water District – Contract 1 – US68 Waterline Relocation
This project consists of one (1) contract. Contract 1 consists of
installing approximately 2,000 L.F. of 8” PVC waterline, approximately 1,100 L.F.
of 4” PVC waterline and all necessary appurtenances. Engineers estimate for
project is $270,000.00.
Barbourville Independent Board of Education – Barbourville Independent School Building Connection
Barbourville Independent Board of Education – Barbourville Independent School Building Connection
The addition consists of a corridor expansion to the Barbourville Independent
School. Work will include selective demolition of an existing exterior wall, doors and frame. The
addition will be a masonry load bearing structure with metal beams and deck, insulated roof with
single-ply roof membrane, brick veneer, hollow metal doors/frames, and new site elements. Major
systems include Mechanical, Plumbing, Fire Protection, Electrical, & Voice/Data.
Louisville Water Company is requesting Bids for providing all labor, rigging, tools, equipment, and materials to perform the roof replacement at the John L. Huber Building. All of the above shall be made ready for use in accordance and compliance with the Contract Documents, Plans, and LWC Standard Specifications and Drawings.
A pre-bid meeting to discuss the Project will be held on March 29, 2022, at 2:00 p.m. EST/EDT. at the John L. Huber Building, 550 South 3rd Street, Louisville, KY 40202. Attendance at this meeting is strongly recommended.
Questions or inquiries relating to this project must be submitted through the Louisville Water Company web-based portal by the date and time provided on the web portal.
The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $500,001 – $1,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.
Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in the Building Category. Contractors/Subcontractors performing specialty items of work such as Roofing must be prequalified in the Roofing Category. For information about pre-qualification, contact the Buyer listed above.
Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.