Taylor County Board of Education – Taylor County Athletic Complex
Taylor County Board of Education – Taylor County Athletic Complex
Specific building equipment, listed herein. Products furnished to site and installed by Owner under separate contract, not included in this work: High-tension backstop system at High School baseball field
Garrison-Quincy Water District – Contract II – Water Storage Tank Repaint
Garrison-Quincy Water District – Contract II – Water Storage Tank Repaint
Contract II (Water Storage Tank Repaint) – Complete blast and repaint the interior
and exterior of a 105,000 gallon ground water storage tank and other miscellaneous
repairs.
Western Lewis Rectorville Water & Gas District – 300,000 Gallon Elevated Tank
Western Lewis Rectorville Water & Gas District – 300,000 Gallon Elevated Tank
This project includes the construction of the 300,000 Gallon Elevated Tank Project and appurtenances for
Western Lewis-Rectorville Water & Gas District
RFP-26-011 Bluegrass CTC Construct Prison Education Program
RFP-26-011 Bluegrass CTC Construct Prison Education Program
Project Description:
The Kentucky Community and Technical College System, Office for Facilities Support Services, on behalf
of Bluegrass Community & Technical College (BCTC) desires to procure professional architectural led
services and associated project engineering team to accomplish the “Construct Prison Education
Program Building” at the Northpoint Training Center in Danville, Kentucky.
KCTCS/ BCTC is partnering with the Kentucky Department of Corrections (DOC) to build a national model
prison education program to reduce recidivism, accelerate workforce development and increase savings
to the society. The proposal builds upon KCTCS’s current work in 14 state prisons and several county
jails. Preliminary programs were selected based on feedback from employers that hire formerly
incarcerated individuals.
The project is contingent on funding from the Kentucky General Assembly that is expected to be
available on July 1, 2026. If funding is not made available by legislation, the project will be cancelled.
While the selection of the Design Team and Construction Manager / General Contractor will be
completed prior to the July 1 date, contract execution and the commencement of design and preconstruction work will not occur until that date. The Design Team’s work is expected to begin on July 1,
2026, and the pre-construction work of the Construction Manager / General Contractor will start before
or near the conclusion of Phase A design work – Mid-July 2026.
Responsible Vendors who have proper experience and qualifications are invited to submit
City of Maysville – Fleming Road Pump Station Rehabilitation
City of Maysville – Fleming Road Pump Station Rehabilitation
This project consists of the Fleming Road Pump Station Rehabilitation including
replacing two (2) pumps, interior piping, pump bases, pump control panels, electrical service, and
distribution panel, and all related appurtenances as shown on the DRAWINGS and described in the
SPECIFICATIONS.
Clark County Project Development Board – Judicial Center CM At-Risk RFP
Clark County Project Development Board – Judicial Center CM At-Risk RFP
The Administrative Office of the Courts is soliciting proposals on behalf of the Clark County Project Development
Board (PDB) for a construction manager-at-risk to develop and construct a new Judicial Center to be located in
Winchester, Ky.
The project consists of the removal and replacement of the existing ceramic tile roof & related flashings. New gutters and downspouts will also be installed throughout. Several gables will get new ceramic tile siding to match the roof. Chimneys and stone parapet caps over the affected roof areas will be cleaned & sealed.
Green County Board of Education – Athletic Bid Package 1 – Site Concrete & 3 Seating
Green County Board of Education – Athletic Bid Package 1 – Site Concrete & 3 Seating
All work as described for Athletic Pkg 1 – Site Concrete, including but not limited to construction of concrete – Seating platforms on south side of field, and east end of field (as Alternate Bid) with site work, concrete, masonry, retaining wall, steel handrails, and fencing/gates.
The interiors of the existing Conference Center at Lake Cumberland State Park are being upgraded with new finishes and other improvements throughout the public spaces. Work includes selective demolition throughout, with most existing finishes being completely removed. New work includes new flooring, painting, wallcoverings, casework, acoustic treatments and window treatments. Restrooms will receive new tile floors and walls, new toilet partitions and accessories, and new acoustic ceilings.
Mechanical work includes the replacement of many of the existing grilles. New plumbing fixtures will replace existing in the restrooms. All lighting in the public spaces will be new. A new audio-visual system includes projector, motorized screen, sound system and lighting controls.
City of Paintsville – Rock City Plaza – Sanitary Sewer Relocation
City of Paintsville – Rock City Plaza – Sanitary Sewer Relocation
The project consists of installing approximately 315 linear feet of 8-inch SDR 35 PVC sewer pipe by open-cut trench methods. The work also consists of abandoning approximately 270 linear feet of existing 8-inch VCT sewer pipe by flowable fill, abandoning one (1) existing manhole, and replacing two (2) existing manholes.
Sealed Bids will be received electronically by Louisville and Jefferson County Metropolitan Sewer District, for the construction of MFWQTC Lab HVAC Upgrades Contract No. 17339, Budget ID No. D26156, Drawing Record No. / Sheet No. 22, until 10:00 AM, Local Time, May 5, 2026, and will be publicly opened and read at that time. The public may attend the bid opening via teleconference call at 502-654-8113 (Dial-in Number) Conference ID: 563 466 776#.
MSD is using a web-based portal for accepting and evaluating bid proposals digitally at http://louisvillemsd.bonfirehub.com/portal for this Invitation to Bid. Documents may be uploaded at any time during the open period indicated for each proposal.
Description and location of Project: SCOPE OF WORK COVERED BY THE CONTRACT
A. The Contractor shall provide all materials, equipment, labor, supervision, incidentals, and all other items necessary to complete the project in accordance with the requirements of the Contract Documents.
B. The Work of this Project is defined by the Contract Documents and includes, but is not limited to, the following:
Pre-TAB:
Perform pre-TAB on existing airside and hydronic systems, prepare report, and submit to Owner.
Mechanical:
Inspect, clean, and disinfect existing supply/return/exhaust ductwork and plenums scheduled to remain. Disconnect, remove, and replace select fume hoods and associated appurtenances where indicated within the laboratory space. Disconnect, remove, and replace portions of the existing exhaust duct as indicated where it extends through the existing roof deck. Disconnect, remove, and replace the existing rooftop-mounted exhaust fans, plenum, and roof curbs. Disconnect, remove, and replace the existing inline chilled water pump, air separator, and appurtenances.
Electrical:
Miscellaneous supporting electrical work is included in the scope of the project.
Architectural:
Saw-cut, remove, and replace a select portion of the existing low-slope roofing system including rigid board insulation down to the existing metal roof deck as required for demolition and new work.
Commissioning & Closeout:
Provide start-up/testing and TAB of new systems, perform Owner training, and provide O&M manuals and record documents in accordance with specs.
All work shall be done in accordance to MSD’s Standard Specifications.
There will be Non-Mandatory pre-bid meeting held for this project. The Meeting will be held at the Morris Forman Water Quality Treatment Center on Tuesday, April 21, 2026 at 9:00 a.m. The address is 4522 Algonquin Parkway. All visitors will be required to furnish their own PPE to visit the site. We can meet at the gazebo at the top of the hill and then walk to the conference room. Will do a lab walkthrough after the meeting.
The Engineer’s Construction Cost Estimate for this project is between $900,000.00 and $1,500,000.00.
Persons wishing to view the bid documents may do so online at http://louisvillemsd.bonfirehub.com/portal or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.
The Project Manager for this Invitation to Bid is Julie Potempa. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal. Questions received less than Three (3) days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda posted on MSD’s designated web portal will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.
MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $200,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:
If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms.
The revised MSD Supplier Diversity Minority and Women Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective January 1, 2025. If selected as “Applicable” or “Applicable, Partial Waiver” above, the goals are as follows:
18.0% MBE – African American participation 2.0% MBE – Asian-Indian American participation 15.0% WBE – Caucasian Female participation
MBE and WBE businesses are encouraged to bid on this project as a prime contractor.
MSD BID DISCOUNT: Not Applicable
This MSD construction project is bid and advertised as: check applicable below
Construction Services: x
Construction-related Services:
LOCAL LABOR COMMITMENT PREFERENCE: No
COMMUNITY BENEFITS PROGRAM: No
The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.
LOUISVILLE AND JEFFERSON COUNTY
METROPOLITAN SEWER DISTRICT
David Johnson, P.E.
Chief Engineer
Rene’ Lindsay, CPPO
One Water Chief Procurement Officer
CMF Solids Handling Facility Bioretention Area Rehab
CMF Solids Handling Facility Bioretention Area Rehab
INVITATION TO BID
Sealed Bids will be received electronically by Louisville and Jefferson County Metropolitan Sewer District, for the construction of CMF Solids Handling Facility Bioretention Area Rehab, Contract No. 26-0430, Budget ID No. A26181, Drawing Record No. / Sheet No., until 2:00 PM , Local Time, April 30, 2026, and will be publicly opened and read at that time. The public may attend the bid opening via teleconference call at 502-654-8113 (Dial-in Number) Conference ID: 234 940 135#.
MSD is using a web-based portal for accepting and evaluating bid proposals digitally at http://louisvillemsd.bonfirehub.com/portal for this Invitation to Bid. Documents may be uploaded at any time during the open period indicated for each proposal.
Description and location of Project: Removal of existing bioretention area and construction of new bioretention area including a V-ditch, berm, and infiltration wells. All work shall be done in accordance to MSD’s Standard Specifications.
There will be a mandatory pre-bid meeting held for this project. Pre-Bid Meeting will be held on Wednesday, April 15, 2026 at 11:00 AM local time at 3050 Commerce Center Pl, Louisville, KY 40211 (38.217989, -85.809094).
The Engineer’s Construction Cost Estimate for this project is between $100,000.00 and $200,000.00.
Persons wishing to view the bid documents may do so online at http://louisvillemsd.bonfirehub.com/portal or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.
The Project Manager for this Invitation to Bid is Isabella Altier. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal. Questions received less than five days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda posted on MSD’s designated web portal will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.
MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $200,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:
If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms.
The revised MSD Supplier Diversity Minority and Women Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective January 1, 2025. If selected as “Applicable” or “Applicable, Partial Waiver” above, the goals are as follows:
18.0% MBE – African American participation 2.0% MBE – Asian-Indian American participation 15.0% WBE – Caucasian Female participation
MBE and WBE businesses are encouraged to bid on this project as a prime contractor.
MSD BID DISCOUNT: Applicable
This MSD construction project is bid and advertised as: check applicable below
Construction Services: x
Construction-related Services:
LOCAL LABOR COMMITMENT PREFERENCE: No
COMMUNITY BENEFITS PROGRAM: No
The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.
LOUISVILLE AND JEFFERSON COUNTY
METROPOLITAN SEWER DISTRICT
David Johnson, P.E.
Chief Engineer
Rene’ Lindsay, CPPO
One Water Chief Procurement Officer
Hardin County Water District No. 2 Contract 1 – Lift Station Improvements
Hardin County Water District No. 2 Contract 1 – Lift Station Improvements
Contract 1 consists of the liner repair and sluice gate repairs at Lift Stations No.1, and liner
repairs and piping improvements at Rose Run Lift Station. By-pass pumping will be required at
both lift stations while the work is being performed.
Bourbon County Extension Office – Bourbon County Extension Office Addition / Renovation
Bourbon County Extension Office – Bourbon County Extension Office Addition / Renovation
Project consists of two phases. Phase A is construction of a new 1-story entry lobby addition and an interior renovation of the right half of the existing building. Following completion of the entry lobby addition and interior renovation to the right half and the Owner relocating from the Phase B area into the completed Phase A area, proceeding with Phase B performing designated repairs in the left half of the existing building. Construction to include all necessary associated structural, plumbing, HVAC and electrical work. Limited site / civil construction on the site around the building is included in the Project scope to be completed during Phase A.
Caneyville Elementary School Metal Roof Replacement & Gutter and Downspout Replacement
Caneyville Elementary School Metal Roof Replacement & Gutter and Downspout Replacement
Recovering of an existing standing seam metal roof system with new standing
seam metal roof and removal and replacement of metal gutters and downspouts
and other Work indicated in the Contract Documents. Removal of existing standing seam metal roof system and installation of new
Thermoplastic-Polyolefin (TPO) Roofing, and replacement of metal gutters and
downspouts and other Work indicated in the Contract Documents.