Mayfield-Graves County Airport – Apron Expansion Project

Mayfield-Graves County Airport – Apron Expansion Project

Project consists of furnishing all labor, materials and equipment and performing all work
necessary for Apron Expansion Project at the Mayfield-Graves County Airport.

Project Location: Mayfield, Kentucky

More Details

City of New Albany – 2022 Annual Street Paving and Repairs Project

City of New Albany – 2022 Annual Street Paving and Repairs Project

The project consists of curb, curb ramp, sidewalk and driveway replacement, and other
appurtenant work associated with these improvements to various streets throughout the city.

Project Location: New Albany, Indiana

More Details

Bourbon County Board of Education – Bourbon County Middle School Sensory Garden

Bourbon County Board of Education – Bourbon County Middle School Sensory Garden

The project scope includes new outdoor sensory garden space for the Bourbon
County Middle School Special Education Classroom. Project includes new poured in place surfacing,
artificial turf, a pre-engineered shade structure and playground equipment.

Project Location: Paris, Kentucky

More Details

Owensboro-Daviess County Regional Airport – Terminal Apron Panel Replacement

Owensboro-Daviess County Regional Airport – Terminal Apron Panel Replacement

Notice is hereby given that the Owensboro-Daviess County Regional Airport will accept
sealed bids for the Terminal Apron Panel Replacement Project

Project Location: Owensboro, Kentucky

More Details

Kentucky River Foothills Development Council Inc. – Transit Center Office

Kentucky River Foothills Development Council Inc. – Transit Center Office

The project scope includes the development of a 2.5-acre site with the construction of two single story
buildings: a 13,976 square foot office building with type B occupancy, and a 3,962 square foot
maintenance garage with type S1 occupancy.

Project Location: Richmond, Kentucky

More Details

City of London – Levi Jackson Campground Sewer Pump Station Replacement Project

City of London – Levi Jackson Campground Sewer Pump Station Replacement Project

The project will include the installation of one (1) 150-GPM sanitary sewer duplex pump station and
valve vault, 60 LF of 8-inch PVC gravity sewer, construction of a gravel access drive, fencing,
excavation, and other associated appurtenances.

Project Location: London, Kentucky

More Details

Lexington Public Library – Marksbury Family Branch

Lexington Public Library – Marksbury Family Branch

The Village Branch, a linchpin in LPL’s system wide vision, opened in 2004 as a small storefront
branch. Expanded in 2010, the Village Library routinely punches above its weight with program
attendance and circulation numbers far above what might be expected. The branch is a true
community asset, hosting many extra-library programs for the neighborhood, which has higher
walkability and lower incomes than other areas of Lexington. The Library’s 2019 Master
Planning process, with input from the Lexington community, identified the replacement of the
Village Branch as its top priority. In November 2020, LPL purchased the site the library currently
sits on with the vision to build a new 30,000 square ft. branch library

Project Location: Lexington, Kentucky

More Details

Sandy Hook Water District – Contract 13 – Water Main Replacement

Sandy Hook Water District – Contract 13 – Water Main Replacement

Contract13 – Water Main Replacement – The program of work for this project which bids are to be
submitted consists of the replacement of approximately 20,000 LF of 4”/6” PVC water main and the
reconnection of approximately thirty-eight (38) meter services. Also included is the interior resealing of the
Wrigley standpipe tank and new pumps and VFD’s for the KY 7 pump station.

Project Location: Sandy Hook, Kentucky

More Details

Sandy Hook Water District – Contract 12 – New Water Treatment Plant & Improvements

Sandy Hook Water District – Contract 12 – New Water Treatment Plant & Improvements

Contract 12 – New Water Treatment Plant & Improvements – The program of work for which bids are to
be submitted consists of constructing a new approximately 4,600 square feet pre-engineered metal building
with interior rooms, CMU walls, three bays with overhead doors, chemical feed rooms, MCC electrical room,
three high service pumps and two backwash pumps, three 7-foot diameter pressure vessels with control
valves and piping, filter media and support gravel, utility and toilet area, overhead crane system, site
preparation, concrete backwash lagoons with pre-engineered metal canopy, stream restoration with gabion
baskets, two 40,000-gallon above-ground clearwell storage tanks, crushed stone paving, fencing,
emergency generator, on-site sewage disposal system with pumps, SCADA computer system, and all
associated appurtenances and miscellaneous items, including all other associated electrical, mechanical,
and structural work, including all related appurtenances, site clearing, site grading and improvements,
connections to existing utilities and other work for a complete installation,

Project Location: Sandy Hook, Kentucky

More Details

RFB-186-22 CHFS – KCPC Break/Rest Areas Demolition and Replacement

RFB-186-22 CHFS – KCPC Break/Rest Areas Demolition and Replacement

Estimate: $129,267.00

Estimated Length of Project: 90 (Substantial Completion) + 15 (Final Completion)

This project includes demolition and removal of four wood frame pavilions and associated concrete slabs. New work includes installation of 4 new pre-finished steel pavilions and thermoplastic coated picnic tables. New concrete slabs will be installed. Pavilion designs are to be engineered by manufacturer with stamped and sealed drawings by a Kentucky engineer. After construction any site disturbances made during construction shall be returned to existing conditions prior to construction.

Project Location: LaGrange

More Details

Mount Sterling Montgomery County Parks and Recreation – Botts Park Rebid

Mount Sterling Montgomery County Parks and Recreation – Botts Park Rebid

Project consists of a single bid scope:

BOTTS PARK – Construction of a masonry free standing restroom pavillion, and associated site utilities.

Project Location: Mt. Sterling, Kentucky

More Details

Buffalo Trail Water Association – Pin Hook Road Tank Repainting Project

Buffalo Trail Water Association – Pin Hook Road Tank Repainting Project

The project consists of various
improvements for the repainting of one elevated water storage
tank.

Project Location: Mayslick, Kentucky

More Details

Clark-Floyd Landfill – West Perimeter Pipe Construction

Clark-Floyd Landfill – West Perimeter Pipe Construction

The project generally consists of:

The installation of the perimeter leachate collection piping and associated electrical controls around
the west portion of the landfill as shown on the plans. This includes the installation of seven (7)
sump pumps, approximately seven thousand (7,000) linear feet of leachate collection piping,
approximately seven thousand (7,000) linear feet of electrical conduit and all pumping, hauling and
disposing of leachate to allow installation of the items described.

Project Location: Jeffersonville, Indiana

More Details

CC-349B-22 Racer Arena HVAC and BAS

CC-349B-22 Racer Arena HVAC and BAS

This project consists of installation of new HVAC units to serve Racer Arena and associated electrical upgrades. Demolition work includes demolition of existing HVAC units, associated ductwork, steam piping, condensate piping, controls, and associated electrical. New work consists of HVAC units on structural support
stand, ductwork distribution, HVAC controls and electrical upgrades. Associated architectural work includes patching and painting existing walls and floors, and modifications to existing roof for new ductwork penetrations and structural steel supports.

The following alternates are included:

Alternate 1 – HVAC controls shall be integrated into the Owner’s existing BAS (Reliable Controls). The bid shall include all costs associated with the extension of the existing system and be in compliance with the specifications. As this is an extension of the existing BAS, the web-based server may be omitted if the existing
BAS allows

Project Location: Murray, Kentucky

More Details

CC-350B-22 Carr Hall Boilers

CC-350B-22 Carr Hall Boilers

This project consists of installation of a new HVAC heating hot water system and domestic water heating
system to serve Racer Arena and Carr Hall, generator, and associated electrical upgrades. Demolition work
includes demolition of existing HVAC units, associated ductwork, steam piping, condensate piping, hydronic
piping, controls, and associated electrical. New work consists of hydronic piping, domestic water heaters,
heating hot water boilers, hydronic pumps, HVAC controls and electrical upgrades. Associated architectural
work includes construction of a new mechanical room, patching and painting of existing walls and floors, and
modifications to existing roof for new penetrations.

The following alternates are included:
Alternate Bid#1 – HVAC controls shall be integrated into the Owner’s existing BAS (Reliable Controls). The
bid shall include all costs associated with the extension of the existing system and be in compliance with the
specifications. As this is an extension of the existing BAS, the web-based server may be omitted if the existing
BAS allows.

Alternate Bid#2 – Per Base Bid, condensing boilers shall be an approved equal per Specification Section
235216 Condensing Boilers. Per Alternate Bid, condensing boilers shall be manufactured by RBI as
scheduled.

Alternate Bid#3 -Per Base Bid, hydronic pumps shall be and approved equal per Specification Section 232123
Hydronic Pumps. Per Alternate Bid, hydronic pumps shall be manufactured by Bell & Gossett as scheduled.

Alternate Bid#4 – Per Base Bid HVAC Water Treatment shall be an approved equal per Specification Section
232500 HVAC Water Treatment. Per Alternate Bid, HVAC Water Treatment shall be manufactured by RBI as
scheduled.

Alternate Bid#5 – Domestic Water Heaters shall be manufactured by NTI or approved equal as scheduled.

Alternate Bid#6 – Thermostatic Mixing Valve for Domestic Water shall be manufactured by Armstrong and the
“Brain” or approved equal as scheduled.

Alternate Bid#7 – Construction of exterior concrete ramp for vehicular access to floor level of Mechanical
Room. Also included is associated site work and metal railings.

Project Location: Murray, Kentucky

More Details

CC-348B-22 Carr Hall Electrical for Boilers

CC-348B-22 Carr Hall Electrical for Boilers

This project includes electrical upgrades needed to support the boiler project. The project consists of
installation of new pad mounted transformer and distribution gear to support new electrical gear in the Carr
Hall Boiler Project.

Project Location: Murray, Kentucky

More Details

LFUCG – Leestown Road Industrial Pump Station Replacement

LFUCG – Leestown Road Industrial Pump Station Replacement

The project includes providing all construction supervision, labor, materials, tools, test equipment
necessary for LEESTOWN ROAD INDUSTRIAL PUMP STATION REPLACEMENT.

Project Location: Lexington, Kentucky

More Details

City of Georgetown – KY 32 & Cardinal Drive Improvements

City of Georgetown – KY 32 & Cardinal Drive Improvements

The scope of work includes widening of Cardinal Drive to accommodate
left and right turn lanes into Scott County High School and conversion to a two-way roadway for
all hours of the day, including reconfiguration of the eastbound Cardinal Drive approach at US
25. Widening of KY 32 (Long Lick Road) to accommodate a designated westbound left turn lane
and a designated eastbound right turn lane from KY 32 (Long Lick Road) onto Cardinal Drive.
Cardinal Drive will be repaved for the entire length.

Project Location: Georgetown, Kentucky

More Details

Breathitt County Board of Education – Area Technology Center Building B Demolition Package

Breathitt County Board of Education – Area Technology Center Building B Demolition Package

Work of the Project includes limited hazardous material abatement of specific building elements,
demolition and removal of existing Building B (Autobody and Automotive learning center). The building
slab, parking and paved sidewalks are to remain and will be removed under a separate project.

Project Location: Jackson, Kentucky

More Details

RFB-185-22 KSP – Academy Dorm Improvements

RFB-185-22 KSP – Academy Dorm Improvements

Estimate:
$497,609.00

Estimated Length of Project:
91 (Substantial Completion) + 14 (Final Completion)

The project is the Kentucky State Police, Academy Dorm Improvements, 380 Coffee Tree Road, Frankfort, Kentucky, Franklin County. The project is located at the Kentucky State Police Training Academy. Project consist of recladding the existing dormitory with new metal roof & wall panels. All roof areas indicated shall receive a new metal-over-metal roof panel system on existing standing seam metal roofs (to remain in place) utilizing retrofit sub-purlin framing system. Provide new metal panel wall system at all walls with galv. hat channels over existing EIFS to be coated with an air barrier prior to enclosure. Provide new rake, fascia, valley, wall, & soffit prefinished metal trims + gutters & downspouts at full perimeter. Existing false attic vents at dutch hips shall be covered over with wall panels. All unused exhaust stacks (4) will be removed. Existing KSP radio communication equipment will be taken off-line for a (5) day max. outage during new roof work. Provide (8) large exterior louvers to be mounted in front of existing louvers. All PVDF finishes for new metal panel systems, soffit, ceiling, and trims shall have 45-year paint warranty (Kynar-500 paint). Reinforced concrete mow strip shall be placed at full perimeter of building. Project Includes exterior painting of existing exterior windows, doors, and frames. Painting and concrete work must be performed by experienced contractors. Retrofit sub-purling framing system must be installed by a Contractor that can provide verified experience with installing these systems. Plumbing work to extend several sprinkler system drain lines and a water driven sprinkler system activation alarm bell.

Project Location: Frankfort

More Details

Housing Authority of Mt. Sterling – Phase B: HVAC Upgrades

Housing Authority of Mt. Sterling – Phase B: HVAC Upgrades

The project consists of:
    Phase B: HVAC Upgrades

Project Location: Mt. Sterling, Kentucky

More Details

RFB-184-22 Donna Baker – Phase II, AMLRP, Pike County, KY

RFB-184-22 Donna Baker – Phase II, AMLRP, Pike County, KY

(Substantial Completion) + 60 Calendar Days (Final Completion)

The proposed project (approximately 0.1 acres, the primary waste area is approximately 40.8 acres, though only a small fraction will be used) consists primarily of installing a 36” pipe to transmit surface water from the hillside behind the Baker residence to the nearby creek. The project area is centrally located at N 37° 26’ 56.22′, W 82° 28’ 44.77″. The site address is 3829 Chloe Road and is located on KY-1460 in Pikeville, KY 41501. The primary waste area, previously used on the Henry Hatcher AML reclamation project, is located approximately 9.6 miles from the project site at N 37° 25’ 38.57″, W 82° 32’ 10.32″.
Reclamation work consists of constructing a concrete headwall at the foot of the hillside and installing a 36” HDPE pipe from that headwall to a dropbox by Chloe Road. A 36” DWPP pipe will then connect to the dropbox and take the water under the road and outlet into the creek. A 6’x6’x15” reinforced concrete headwall will be constructed at the DWPP outlet to bridge the existing rail steel. Other concrete dropboxes will be constructed along the pipe as portrayed on the plans and directed by the ENGINEER. Existing water and gas lines (held by Mountain Water and Utilities Management Group, respectively) are currently in the path of the proposed pipe and will have to be lowered before work can commence. Additional subdrain will be installed to direct water away from the backyard of the Baker residence and into the new pipe.
During the time when the pipe is being installed under Chloe Road, that section of road will be shut down to traffic. Public notification of this closure will be given at least two weeks in advance including message boards, radio, and newspaper notification. Hay bales/silt fence will be used for sediment and erosion control.

Project Location: Pike County

More Details

Jefferson County Public Schools – Ballard High School Concrete Patio Repair

Jefferson County Public Schools – Ballard High School Concrete Patio Repair

Construction Plans for the repair/replacement of the outdoor patio at
Ballard High School. The new plans will eliminate the single concrete
retaining wall and replace it with a 3-tiered modular retaining wall
design. The design removes much of the existing concrete and replaces it with permeable pavers, turf, new steps, and a new concrete walk to
dramatically reduce the impervious surface area in the project area.
Existing circulation is reconfigured, and the new concrete walk provides a
universally accessible route throughout the project limits. The detention
basin retaining wall and section of the patio overhanging the existing
detention basin within the existing MSD easement will remain
unchanged.

Project Location: Louisville, Kentucky

More Details

Housing Authority of Danville – Nichols Terrace Storm Damage Repair

Housing Authority of Danville – Nichols Terrace Storm Damage Repair

Sealed bids will be received by the Housing Authority of Danville for construction of the project entitled Nichols
3 Terrace Storm Damage, AMP 201, KY14-05, Danville, Kentucky.

Project Location: Danville, Kentucky

More Details

CCK-2631-22 Repair/Upgrade/Expand Central Plant Deaerators Phase 1 #2560.0

CCK-2631-22 Repair/Upgrade/Expand Central Plant Deaerators Phase 1 #2560.0

This project is to replace the Deaerator and Condensate Surge Tanks in the Medical Center
Heating and Cooling Plant. The existing tanks will be removed, and the new tanks will be
installed through the existing exterior wall. The exterior wall panels will need to be removed.
The extra steel columns will be added to the existing second floor mezzanine structural steel.
The steam, condensate, feedwater piping to and from the tanks will be removed and
replaced. New level controls for both tanks will be provided. The Deaerator and Condensate
Surge Tanks are owner furnished and contractor installed.

Project Location: Lexington, Kentucky

More Details