CCK-2632-22 Renew/Modernize Facilities Reynolds Building #1
CCK-2632-22 Renew/Modernize Facilities Reynolds Building #1
A. The Work of Project is defined by the Contract Documents and consists of the following:
1. Demolition of various exterior and interior components of the existing Reynolds Building.
2. Construction of new exterior and interior components, window systems, partitions, door systems, finishes, stairways, elevator system, mechanical and electrical systems.
B. Type of Contract:
1. Construction Delivery Method: Construction Management
2. Project will be constructed under coordinated, concurrent multiple contracts, administered by the Construction Manager.
Louisville Water Company is requesting Bids for The referenced project consists of the supply and install of a total of 2,610 LF of water main, including supply and install of 1,165+/- linear feet of 8-inch DR-18 C900 PVC, 1,395+/- linear feet of 8-inch Pressure Class 350 ductile iron water main and 50+/- linear feet of 6-inch DR-18 C900 PVC using traditional trench installation techniques and the abandonment of 2,520+/- linear feet of 8-inch Asbestos-Cement water main. Also included with the project is the supply and installation of 3 fire hydrant, and the supply and transfer, renewal, relocation, or discontinue of 47+/- customer services. Fire hydrant removal, main cut and plugs, and restoration on and along Project Limits as stated above shall be included. Contractor shall supply and install all materials required for the completion of this project.
Questions or inquiries relating to this project must be submitted through the Louisville Water Company web-based portal by the date and time indicated for this bid.
The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $500,001 – $1,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.
Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in any of the following prequalification categories: 4” – 16” Duct8ile Iron Water Main, and/or 4”-16” PVC Water Main. For information about pre-qualification, contact the Buyer listed above.
The Company will award the Contract to the Bidder presenting a Bid that is responsive to the Specifications, is in substantial compliance with the Contract requirements, and presents the lowest and best price for performing the Work making up the base bid and or Bid that Company determines is in the Company’s best interest, which may not necessarily be the least expensive Bid
Company Local Preference Program applies to this bid and resultant bid award.
Bid Documents except the Bid Table may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.
This project includes providing a standby rated generator system to support the entire electrical distribution system of the Oakwood campus. Also, to satisfy life safety code requirements, emergency battery back-up lighting fixtures will be added to facilities that currently do not have them.
The standby generator system will consist of three 500KW natural gas fired generators, a transformer, and automatic transfer switch (ATS) connected in line with the main electrical service entrance. The generator plant will be located outside on concrete pads adjacent to Building 600. Existing generators that are located throughout the campus in individual buildings shall be disconnected and abandoned for future demolition. Generators at buildings 501 and 600 shall remain and the associated automatic transfer switches will be modified to become manual transfer switches. Also, the existing “load shed” control of one chiller at building 501 will be removed such that both will operate during an outage.
The generator system shall be capable of producing 1,500KW (1,875 KVA) – 2,255A at 480V, 3-phase. The new generator plant area and equipment will be designed to accommodate future additions of generators to increase capacity if needed.
City of Jamestown – C. Wooldridge Road Waterline Extension
City of Jamestown – C. Wooldridge Road Waterline Extension
This contract consists of installing approximately 3,600 L.F. of
3” PVC, SDR-17 waterline along C. Wooldridge Road as well as all necessary
appurtenances. The engineer’s estimate is $105,000.
Bell County Extension District Board – Bell County Extension Office
Bell County Extension District Board – Bell County Extension Office
The project site is located at 10524 US Highway 25E, Pineville, KY 40977. The bid is to
furnish all necessary labor, materials, tools, machinery, warranties, and all other items
required to meet the plans and specifications. Work to include New Building Construction
and site development.
Lee County Board of Education – Lee County School Projects
Lee County Board of Education – Lee County School Projects
Lee County Board of Education (OWNER) will receive proposals through Codell Construction
Company (Construction Manager) to furnish all labor and materials to complete the following:
1. BG 22-133 Lee County Elementary School Addition and Renovation – ESSER III, 1665 Hwy
11 South, Beattyville, KY 41311
2. BG 22-183 Lee County MHS Secure Entry Vestibules – 600 Lee Avenue, Beattyville, KY
41311
3. BG 22-184 Lee County Schools Multi-Purpose Building – ESSER II and ESSER III, 454 Lee
Avenue, Beattyville, KY 41311
City of Jeffersontown – Seized Car Storage Facility
City of Jeffersontown – Seized Car Storage Facility
The City of Jeffersontown is accepting sealed bids for the construction of a vehicle storage facility located at Jeffersontown Public Works, 10307 Grand Avenue, Jeffersontown, Kentucky 40299
Louisville Water Company is requesting Bids for for the supply and install of a total of 6,345+/- linear feet of distribution water main using traditional trench installation techniques, and jack and bore, including; 3,530+/- linear feet of 12-inch DR-18 C900 PVC water main, 70+/- linear feet of 12-inch Pressure Class 350 Restrained Joint ductile iron water main inserted through 50 linear feet of 24” steel casing pipe, 1,830+/- linear feet of eight (8)-inch DR-18 C900 PVC water main, 915+/- linear feet of six (6)-inch DR-18 C900 PVC water main, for sections of five (5) neighborhood streets located in Louisville, Buechel area. Also included with the project is the transfer, renewal, relocation or discontinue of 149 +/- customer services, Fire Hydrant removal and installation, cut and plugs, restoration on and along Project Limits.
Questions or inquiries relating to this project must be submitted through the Louisville Water Company web-based portal by the date and time indicated for this bid.
The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $1,000,001 – $3,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.
Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in all of the following prequalification categories: 4″ – 16″ PVC Water Mains, 4″ – 16″ Ductile Iron Water Mains, 1″ and Smaller Water Services and 1.5” and Larger Water and Fire Services. For information about pre-qualification, contact the Buyer listed above.
Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.
Russell Independent Board of Education – Russell Independent High School Multi-Purpose Facility – Phase A
Russell Independent Board of Education – Russell Independent High School Multi-Purpose Facility – Phase A
Sealed proposals in duplicate, shall be received in the manner and on the date herein specified for the
furnishing of the specified labor, materials, supplies, tools, and or services, indicated for the:
Russell Independent High School Multi-Purpose Facility, Phase A, BG # 22-363
Nicholas County Board of Education – Nicholas County High School Renovation – BP5
Nicholas County Board of Education – Nicholas County High School Renovation – BP5
Sealed bids will be received by the Nicholas County Board of Education for the Nicholas County High School
3 Renovation – Bid Package 5 in Carlisle, Kentucky
Work is to include installation and construction of approximately 660 LF of 12 inch Ductile Iron
Gravity Sewer, 1,050 LF of 8″ & 10″ PVC gravity sewer, 640 LF of 18″ Steel Casing that includes a 12″ PVC carrier pipe and 2,030 LF of 6″ Force Main, 12 Concrete Manholes and the upgrade of 2 sewer lift
stations.
CCK-2633-22 2402.16 PAV A. 12th Floor Fit Up – Interiors
CCK-2633-22 2402.16 PAV A. 12th Floor Fit Up – Interiors
The UK 12th Floor Fit Out package includes the fit-out work for construction on the 12th floor of Pavilion A.
This work includes the construction of 64 ICU patient rooms, a pharmacy, auxiliary support spaces, and
installation of 2 owner provided air handler units.
City of Winchester – Town Branch Building Demolition
City of Winchester – Town Branch Building Demolition
The project scope includes demolition of the existing Building, located at 12 – 18 E. Broadway Street, and construction of
a poured retaining wall to support surrounding fill once building is removed.
The Lexington-Fayette Urban County Airport Board (LFUCAB) invites the submittal of
Proposals from professional firms interested in the refurbishment of the AVGAS bulk storage
tank at Blue Grass Airport.
This invitation is for renovation of the Giles Gallery as specified in the following bid at Eastern Kentucky University’s
Richmond Campus. The work includes furnishing all labor, materials, equipment and services necessary for the complete
project.
The project includes removal and replacement of three air handling units and new temperature controls at new air handling units. Electrical work incudes removal and replacement of existing switchboard and work associated with air handling replacements. Minor plumbing, fire protection and general construction associated with air handling unit replacements.