2312.01 Center for Applied Energy Research Laboratory 2 Bid Package 3
2312.01 Center for Applied Energy Research Laboratory 2 Bid Package 3
TC-16 General Trades
TC-17 Drywall & Ceilings-Acoustic & Special
TC-18 Flooring
TC-19 Painting and Wallcovering
TC-20 Misc Metals/Stairs/Ornamental Stair
TC-21 Laboratory Casework
TC-22 Controlled Environment Rooms
TC-23 Fire Protection
TC-24 Plumbing
TC-25 Mechanical
TC-26 Electrical
TC-27 Final Cleaning
TC-28 Sitework and Site Concrete
TC-29 Asphalt Paving
TC-30 Landscaping and Hardware
This package involves all MEP, Interior Construction and Finishes, Controlled Environment Rooms and Final Sitework for the new CAER Laboratory #2, a 43 thousand SF research laboratory. The work will be performed under contract with the Construction Manager, Turner Construction Company and Finch Constructors.
This contract is intended to provide a portion of the HVAC maintenance and repairs on select Metro Louisville Government owned facilities. Such work is estimated to cost less than $10,000 per call out.
Seperate sealed BIDS for the construction of a one store Library, constructed with insulated concrete formed (ICF) exterior walls with brick masonry veneer. Exterior glazing to be insulated glass with low-e coatings and argon gas. The structural system is structural steel beams with prefabricated wood trusses. The roofing system is to be asphalt shingles. Interior partitions will be light gauge metal framing with gypsum board panels. The HVAC system will be a forced-air system with gas furnaces and electric cooling with remote exterior expansion coils. The electrical system is to be 3 phase 120/208V.
The project scope includes 68,000 square feet of the existing facility with the addition of 2,000 square feet of new construction. The work must be substantially complete no later than July 15,2012
Louisville Water Company is requesting Bids for Avish-Nitta Yuma Main Replacement. The referenced project runs along Ashbourne Rd., Nitta Yuma Drive, and an easement that connects the two roads. The project consists of the supply and installation of 12-inch DIPS DR 11 HDPE (905 ft. main bursting and 45 ft. bore), 8-inch DIPS DR 11 HDPE (2215 ft. main bursting, 140 ft. bore, and 410 ft. open trench), 6-inch DIPS DR 11 HDPE (325 ft. main bursting, 95 ft. bore, and 310 ft. open trench), and 4-inch DIPS DR 11 HDPE (360 ft main bursting). The project also includes installing 12-inch Pressure Class 350 ductile iron (60 ft lay-in-place and 85 ft. open trench), installing 355 ft. of 8-inch Pressure Class 350 ductile iron, installing 340 ft. of 6-inch Pressure Class 350 ductile iron, and installing 2-inch copper water main (75 ft. open trench and 175 ft. bore). Also included with the project is the installation/renewal/relocation of 4 new fire hydrants, the transfer/renewal/relocation of 21 customer services, the discontinue of 1 customer service, and 3 meter exchanges.
The scope of work consists of a full restaurant ground up build with site construction. All mechanical trades will be required as well as carpentry, framing, glass/glazing, drywall/metal stud, rough carpentry, finish carpentry, tile, acoustic ceiling, painting, and roofing.
Teachers College/Dyer Hall Roof Replacement
University of Cincinnati Project No. 11024A
Cincinnati, OH Click Here to Order
Red Lobster Lexington
Red Lobster Lexington
New construction of a 5,880 SF Red Lobster (New Prototype). Scopes of work as listed. Please be sure to review supplemental instructions as well as responsibility matrix. Subcontractors will also need to fill out unit price schedule. Construction will include site and building demolition of existing Max & Erma’s restaurant.
Lake Forest Pump Station, Force Main, and Gravity Sewer Phase II
Lake Forest Pump Station, Force Main, and Gravity Sewer Phase II
This Contract provides for the installation of approximately 3,112 linear feet of 27-inch sewer, 4,318 linear feet of 24-inch sewer, 136 linear feet of 18-inch sewer, 1,095 linear feet of 12-inch sewer, 58 linear feet of 8-inch sewer, 35 manholes, 94 linear feet of 27-inch sewer using trenchless technology, 84 linear feet of 12-inch sewer using trenchless technology, elimination of one (1) treatment plant, elimination of one (1) pump station, and other miscellaneous appurtenant work.
Rockcastle Board of Education For Alternate Learning
Rockcastle Board of Education For Alternate Learning
Project is approximatley 4,000 S.F. interior fit-up of the Academy for Alternate learning for the Rockcastle County Board of Education. The project includes but is not limited to the following components; Provide all labor and materials required for the general construction and oversight this interior fit-up project. Inclusive of demolition of the existing mechanical and electrical materials; Certain areas of the Fit-up construction work are adjacent to areas of the existing building where no work is called for. These adjacent areas shall be protected from damage, dust, and construction debris during the construction activities of this project. In General Terms School shall be in session during this contract period. All access to the site and job activities shall be coordinated with Rockcastle County Schools Facilities Personnel, Principal of the School, and the Architect to insure minimum intrusion to the learning environment and maximum safety and security of the children. Work Schedules and section of limitation regarding work area access shall be coordinated as part of the work and considered in the bidding process as described in the plans and specs.
Preliminary Treatment Building – Electrical Improvments
Preliminay Treatment Building – Electrical Improvements
The scope of work under this contract includes electrical replacement of conduit, tubing, power conductors, control wiring, junction boxes, lighting fixtures and related work in the lower level of the preliminary treatment building at the Fort Knox WWTP
You are invited to bid on furnishing all labor, materials, permits, and equipment needed to Construct South Way Storage Facility located on the campus of Westem Kentucky University.
HPP 0121 (006): MOUNTAIN PARKWAY (KY 9000) CONSTRUCT INTERCHANGE RAMPS AT KY 1057
AND MOUNTAIN PARKWAY, A DISTANCE OF 0.56 MILES. GRADE & DRAIN WITH ASPHALT SURFACE.
SYP NO. 10-00138.00.