Uncategorized

Electrical Distribution Upgrades, Kentucky State Reformatory

RFB-67-12
This project includes the removal of the existing 4KV electrical distribution at KSR and
installation of a new 15KV electrical distribution system. Included in the new 15KV distribution
system is new above ground 15KV fused distribution switches, new 15KV cables, new 15KV
transformers, and work inside some of the buildings as required. Also included in the project is
the upgrade of the existing 4KV emergency distribution system, and replacement and upgrade of
the existing overhead 4KV distribution system that is mainly outside the prison fence.

LaGrange, Kentucky

Click Here to Order

South 23rd Sidewalk Project

South 23rd Sidewalk Project

To furnish all labor, material and necessary equipment for the S. 23rd Sidewalk Project.

Louisville, KY

Click Here to Order

Pioneer Housing-Parrish Ave.

Pioneer Housing-Parrish Ave.

New two bedroon duplex.

Richmond, KY

click here to order

South Anderson Water District Phase VII Contract 12 Distribution Expansion

South Anderson Water District Phase VII Contract 12 Distribution Expansion

This project consists of approximately 78,000 LF of three and four inch water line and their appurtenances. Engineers Estimate: $1,000,000.

Lawrenceburg, KY

click here to order

South Anderson Water District Phase VII Contract 13 Transmission Main and Pump Station

South Anderson Water District Phase VII Contract 13 Transmission Main and Pump Station

This project consists of approximately 17,900 feet of 6, 8 and 10 inch water line, a 700 gpm pump station and its appurtenances.

Lawrenceburg, Kentucky

click here to order

South Anderson Water District Phase VII Contract 12 Distribution Expansion

South Anderson Water District Phase VII Contract 12 Distribution Expansion

This project consists of approximately 78,000 LF of three and four inch water line and their appurtenances. Engineers Estimate: $1,000,000.

Lawrenceburg, KY

click here to order

Indian Fork Trail Project Berea, KY

Indian Fork Trail Project

The scope of work includes the construction of a concrete bridge, 80 feet in lenght and 14 feet wide, for the future construction of a paved bike trail. Additional earthworks and grading will also be performed at each bridge abutment.

Berea, KY

click here to order

City of Greenup Phase 8 Waterline Extension Contract 4

City of Greenup Phase 8 Waterline Extension Contract 4

City of Greenup Phase 8 Water line Extension, Contract 4, Coal Branch Booster Station Upgrades, as shown on the plans, base bid, alternates, and unit price section.

Greenup, KY

click here to order

Emergency Generators Installation Project — Bid Package C

Emergency Generators Installation Project — Bid Package C

Furnish all labor, materials and necessary equipment for the Emergency Generators
Installations Project – Bid Package C (Install emergency generators at: 4th & 5th
Division of LMPD stations and at Haz-Mat 5, Truck 2 and Engine 11, Truck 7 of
Louisville Metro Fire Stations) for Public Works & Assets, per the attached
specifications (a portion of this project will be utilizing FEMA funds).

Louisville, Ky

Click Here to Order

#2488 Emergency Generators Installation Project — Bid Package B

#2488 Emergency Generators Installation Project — Bid Package B

Furnish all labor, materials and necessary equipment for the Emergency Generators Installations Project – Bid Package B (Install emergency generators at: 1st,2nd Division of LMPD stations and Engine 22, Truck 4 of Lou Metro Fire Station)for Public Works & Assets.

Louisville, KY

Click Here to Order

#2487 Emergency Generators Installation Project — Bid Package A

#2487 Emergency Generators Installation Project — Bid Package A

Furnish all labor, materials and necessary equipment for the Emergency Generators Installation Project – Bid Package A (Install generators at: 3rd, 6th,7th, and 8th Division LMPD stations)for Public Works & Assets.

Louisville, KY

Click Here to Order

Mitchell Creek Road Force Main Replacement London KY

Mitchell Creek Road Force Main Replacement

The scope includes the installation of 3,433 feet of 12-inch PVC force main, and related appurtenances.

London, KY

click here to order

Scott Fork Industrial Park Roadway Improvements Pikeville KY

Scott Fork Industrial Park Roadway Improvements

The project includes the widening of the existing Scott Fork Access Road to a minimum of 20 ft. the constructin of an intersection at the end of the existing road, and the construction of a right turn lane from northbound U.S. 119.

Pikeville, KY

click here to order

Sidewalk Replacement West Water Street Flemingsburg

Sidewalk Replacement West Water Street Flemingsburg

The project consists of approximately 1,050 LF of sidewalk replacement and approximately 200 LF of new sidewalk located in downtown Flemingsburg.

Flemingsburg, KY

click here to order

Pulaski County High School Bid Pack 3 1982 Building Renovation

Pulaski County High School Bid Pack 3 1982 Building Renovation

The scope includes renovation of approximately8,867 square feet of the existing 1982 building. The project includes reworking and renovating spaces on the main floor of this building along with new finishes and rebovated toilets on the lower level. Mechanical, electrical and plumbing work for this renovation includes a new makeup air unit, fire suppression, lighting and plumbing. In addition, there are multiple locations throughout the school that will have new HVAC and new electrical systems.

Somerset, KY

click here to order

Pulaski County High School Bid Pack 2 Gymnasium Floor Renovation

Pulaski County High School Bid Pack 2 Gymnasium Floor Renovation

The scope includes removal and replacement of the wood flooring system in the gymnasium. The existing subfloor is to remain in place.

Somerset, KY

click here to order

McBride Heights Sewers

McBride Heights Sewer

This project consists of the furnishing and installing of gravity sewers, manholes, property service connections, asphalt paving, and all other items shown on the plans and mentioned in the specifications for a complete project.

Jeffersonville, IN

Click Here to Order

Multiple Roof Repair/Replacement, Western State Hospital

RFB-76-11
Estimate: $215,900.00
The work to be performed under this contract includes the removal and replacement of all
roofing/flashings/etc. on Buildings #30, 31, 32 & 33 of the Nursing Facility at Western State
Hospital, Hopkinsville, Kentucky. The existing roofing material/gravel/insulation shall be removed
down to the existing gypsum decking. These materials have been tested and contain no
asbestos. The existing gypsum decking shall be repaired as required for the new roofing system.
Contractor shall install a new base sheet, insulation and 2 ply SBS modified bitumen roofing
system over the existing roof as shown on the roofing plans. All existing gutters, downspouts to
ground, flashings and counterflashings shall be removed and new materials shall be installed
per details. It shall be noted that there is existing transite formboard exposed on the underside of
the eave which contains asbestos, but this material shall not be dealt with or touched during the
roof/flashing work.
The base bid shall include all labor, materials, supervision and equipment for the work contained
and shown on Buildings #31 and 33. Additive alternate #1 shall be for all work contained on
Building #30. Additive alternate #2 shall be for all work contained and shown on Building #32.

Hopkinsville, Kentucky

Click Here to Order

22nd Street Main Relocation Project

22nd Street Main Relocation Project

Louisville Water Company is requesting Bids for The referenced project consists of the installation of +/-55 linear feet of 8-inch DPW water main, including valves, fittings, and two (2) tie-ins to existing water mains. The project also includes removing existing water main from a catch basin and grouting the walls (2) of the catch basin. Restoration includes sidewalk repair and milling and paving of a drive lane near the intersection of 22nd Street and Gaulbert Avenue.

Louisville, KY

Click Here to Order

HVAC & Lighting Upgrade Campbellsville NGA, 1503 E. Broadway

RFB-81-12
$237,939.00
This project involves the following:

1. Demolition of the existing building boiler, fan coil units, piping and thermostats
2. Installation of new split system heat pump VRV type, air handler, ductwork, grills and diffusers for a complete HVAC system.
3. Demolition of existing lighting and the installation of all new indoor lighting.

Campbellsville, Kentucky

Click Here to Order

Standby Generator System-Support Infrastructure, Wendell H. Ford Regional Training Center Military

RFB-77-12
$ 96,100.00
This project consists of installation of high voltage overhead line work (by Kentucky Utilities), fiber optic communications, natural gas and water supply to support power generation equipment by others. The contractor will furnish all coordination and pay all costs between Kentucky Utilities and the generation equipment supplier for the complete interface to the utilities companies existing overhead distribution system. The contractor shall furnish, install and test underground communication between the owner computer network, high voltage reclosures and the power generation equipment (by others).Domestic water will be provided to the generation site, originating at the Owner’s existing distribution system and extending underground to a yard hydrant. Natural gas will be extend from the utility company, adjacent to the site, reduced in pressure and extended both above and below grade and connected to three generators (by others).

Greenville, Kentucky

Click Here to Order

41st CST Expansion, Vehicle Storage Bay, Louisville, Kentucky

RFB-78-12
$628,232.00
The work of the project is defined by the contract documents and consists of the following:
A one story vehicle storage addition that includes but is not limited to site demolition, site utility relocation, site paving and striping, caissons, concrete foundations, selective building demolition, concrete masonry, structural steel and steel joists, insulation, metal roof and wall systems, doors, Overhead doors, painting, mechanical and plumbing work, electrical power, lighting and systems and an alternate for a solar PV system.

Louisville, Kentucky

Click Here to Order

FMS-5 Latrine and Cold Storage Building, Depart. of Military Affairs Boone National Guard Center

RFB-68-12
Estimate: $522,392.00

Work includes providing all required material, labor and equipment to perform selective demolition and associated reconstruction of project improvements as hereinafter described. Work includes removal and disposal of selected site and building improvements to accommodate construction of two (2) additions to Field Maintenance Shop (FMS #5) at Boone National Guard Center in Frankfort, Kentucky. One addition consists of a conventionally constructed Latrine facility with masonry load bearing walls, modified bitumen roof, porcelain tile, acoustic panel ceilings, and associated mechanical and electrical improvements. The second addition consists of one Pre-Engineered cold storage facility (unconditioned space) wrapped around an existing Pre-Engineered structure and attached to the existing Field Maintenance Shop.
Both additions are to be constructed on drilled concrete piers, supporting grade beams. Building slabs are ground supported. Site improvements are limited to utility relocation, patching and repairing disturbed site areas (paved surfaces), limited site concrete and fencing

Frankfort, Kentucky

Click Here to Order

Roof Replacement Building 106, Woodsbend Youth Development Center

RFB-71-12
$213,922.00
Work required for this project includes, but is not limited to the following: Removal of existing modified bitumen roofing and appurtenances, installation of new modified bitumen roofing and accessories.

West Liberty, Kentucky

Click Here to Order

Elevator Upgrade Carl D. Perkins Vocational Training, Carl D. Perkins Vocational Training Center

RFB-72-12
Estimate: $338,500.00
Upgrade two (2) five-story existing elevators (boys) and one (1) two-story existing
elevator (girls). The girls elevator cab will be enlarged inside the existing elevator
shaft. All mechanical and electrical operational equipment will be replaced with new
equipment and functional systems. Painting and minor flooring and wall materials will
be repaired by current maintenance staff.

Thelma, Kentucky

Click Here to Order