A pressure sewer system incluiding a possible 24,340 LF of HDPE collector sewers, 41,030 LF of HDPE service line, 140 simplex residential grinder pump stations, 11 duplex residential grinder pumping stations, 1 quadplex grinder pumping station with odor control system, and 1 conventional submersible pump station with odor control system.
Louisville Water Company is requesting Bids for furnish and install (1) underground packaged booster pump station complete with associated piping, electrical, and site work.
General concrete sidewalk and curb maintenance and new sidwalk and curb construction work to be performed for the City of Frankfort on an as needed, cafeteria style project scope with bid unit prices to remain in affect for a period of one year from the stated bid opening date.
RFB-186-12
This project will include the installation of foundation in an existing asphalt parking lot for a pre-engineered canopy type structure. This structure will be surrounded by chainlike security fence with swinging gates. Installation of new electrical panel service with underground connection to new exterior panel with recreational vehicle connections. Security lighting will be installed with alternate for security camera. Metal roof with gutter and downspout system will be installed on the new canopy structure.
Demo and remove existing 3-story exterior stair case including lead-based paint containment/removal. Demo and remove part of existing concrete basement stairs as shown on plans to facilitate construction of new footer and stairs. Construct new footers and concrete basement stairs as shown on engineer’s plans. Construct new galvanized exterior fire escape/stairs as shown on plans.
Wilmore Streetscape Improvement and Pedestrian Mall Project
Wilmore Streetscape Improvement and Pedestrian Mall Project
The City of Wilmore Streetscape Improvement and Pedestrian Mall Project includes approximately 1085 linear feet of full-death grade, drain and surfacing roadway reconstruction of East College Street and North Walnut Street including a 212 linear feel 7’ x 3’ RCBC. The current one-way portion of Gillispie Street between North Walnut and Lexington Avenue is to be closed to vehicular traffic and reconstructed into a Pedestrian Mall (approximately 340 linear feet). The two-way portion of Gillispie Street within the project area will be resurfaced (approximately 1245 linear feet). Lexington Avenue will be resurfaced (approximately 1245 linear feet). Full-depth construction turnouts on Lexington Avenue will be constructed at the Asbury Theological Seminary Library and Gillispie Pedestrian Mall entrance. Grade, drain and surfacing for new parking lots will be constructed on both sides of Walnut Street at the Gillispie and Walnut intersection and at the Walnut and College intersection. Grade, drain, and surfacing for an 8’ wide multi-use pathway will be constructed between East College Street and Morrison Street (approximately 365 linear feet). Stream reconstruction (approximately 280 linear feet) in included in the project with grade, drain and surfacing for an 8’ multi-use pathway along the stream (approximately 305 linear feet). New sidewalks, lighting, signage, striping, and landscaping will be constructed and installed within the project area. New city water, sewer, and conduit for utilities will be constructed within the project area.
Louisville Water Company is requesting Bids for the installation of approximately 1665 lineal feet of 8-inch PVC water main, 120 lineal feet of 8-inch DWP water main, and 50 lineal feet of 16-inch steel casing (open) cut). Also included with the project is the installation of 3 fire hydrants, the installation, transfer, renewal, or relocation of 8 customer services.
Transylvania Beach Sanitary Sewer, Force Main, Pump Station, and Drainage Improvements
Transylvania Beach Sanitary Sewer, Force Main, Pump Station, and Drainage Improvements
Louisville Water Company (LWC) is requesting bids for the Supply and Installation of approximately 3,750 LF of 12-inch PVC sewer; 270 LF of 1 1/2-inch, 2,540 LF of 2 1/2 -inch and 2,040 LF of 3-inch PVC force main; 435 LF of 4-inch PVC service connections; 28 tees; 15 service stacks; a submersible pump station and control panel; a grinder pump station with connection to a Louisville Water Company control panel; removal and replacement of approximately 2,100 LF of chain link fencing; and miscellaneous appurtances thereto all as shown on the Drawings and Specifications. The drainage portion of the project consists of clearing and grubbing brush and trees and clean up of Louisville Water Company property, construction of approximately 2,550 feet of drainage swale including contouring ground to drain to the swale; seeding and planting; furnishing and installing approximately 180 LF of 24-inch RCP storm sewer and two headwalls; and miscellaneous appurtenances thereto all as shown on the Drawings and Specifications.
You are invited to bid on supplying all equipment, materials, labor, permits, etc for the Downing University Center Renovation: Bid Pkg #1 Site Utility Relocation on the campus of Western Kentucky University. Mr. Dan Chaney, Project Manager shall be in charge of this project. Please contact Warren Whitfield, Manager of Construction Purchasing by e-mail at warren.whitfield@wku.edu for any information or clarifications you may need about the bid. As soon as an answer is available it will be e-mailed back to you. If it affects the bid specifications, a written Advice of Change will be issued to all bidders.
RFB-184-12 Generator Installation Technical Campus Building B
RFB-184-12
The work consists of the following: Supply and install a new emergency diesel generator and concrete pad on the exterior of the building, associated emergency distribution panel and transfer switches. Install new feed switches in the existing switchgear. Rework the existing elevator power feed into the emergency system. Install new branch panels and associated feeds to designated areas of the facility. Remove existing emergency lighting inverter system. Rework existing branch circuit feeds from the emergency lighting inverter system and selected receptacle circuits into the new emergency panels.
CALL 418 CONTRACT ID 122951
GRAYSON, HARDIN COUNTIES
121GR11M102-FE02 & JL04
BRIDGE CLEANING AND PAINTING IN GRAYSON AND HARDIN COUNTIES
GRAYSON COUNTY
FE02 043 0079 B00053N: BRIDGE CLEANING AND PAINTING IN GRAYSON COUNTY KY 79 OVER
LONG ROUGH RIVER . BRIDGE PAINTING & CLEANING.
GRAYSON COUNTY
FE02 043 1214 B00065N: BRIDGE CLEANING AND PAINTING IN GRAYSON COUNTY KY 1214 OVER
GRINDSTONE FORK CREEK . BRIDGE PAINTING & CLEANING.
HARDIN COUNTY
JL04 047 1288 C00030N: BRIDGE CLEANING AND PAINTING WITH REPAIRS IN HARDIN COUNTY
CR 1288 OVER NOLIN RIVER . BRIDGE PAINTING & CLEANING. SYP NO. 04- 8630.00.
CALL 201 CONTRACT ID 122601 JEFFERSON COUNTY
IM 0659(020)
JOHN F. KENNEDY MEMORIAL BRIDGE OVER OHIO RIVER
THE DBE PARTICIAPTION GOAL IS 0.00%.
JEFFERSON COUNTY
FD52 056 0065 136-138: TENNESSEE- LOUISVILLE ROAD (I 65) BRIDGE OVER OHIO RIVER
(MP136.901) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00202N: I 64 EAST AND WEST TO I 65 NORTH BRIDGE OVER I 64 (MP5.444) .
BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00177N: NB EXIT RAMPS TO I-64 EB & WB BRIDGE OVER I-64 EB AND
WITHERSPOON ST. (MP5.459) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00176N: I 64 RAMP FROM I 65 SOUTH BOUND BRIDGE OVER I 64 (MP5.387) .
BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00178N: I 64 RAMP TO I 65 BRIDGE OVER I 64 EB & WITHERSPOON ST (MP5.
391) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0065 B00175N: TENNESSEE- LOUISVILLE ROAD (I 65) BRIDGE OVER I-64 EB& WB &
RIVER ROAD (MP136.506) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0065 4811-B: CLARKSVILLE- LOUISVILLE ROAD (I 65) BRIDGE OVER RIVERSIDE
DRIVE & MARKET ST. (MP0.108 INDIANA) . BRIDGE REPAIRS. SYP NO. 5 -801.00.