Effluent Line and Pumping Station

Effluent Line and Pumping Station

The scope of work includes four (4) new effluent pumps, structural modifications to the existing effluent pumps wet well, a new 36-inch ductile iron and reinforced concrete gravity effluent line, a new 24-inch ductile iron force main, a new gatewell with 36-inch sluice gate and electric actuator and an energydissipation feature between the end of the gravity line and Mill Creek.

Clarksville, IN

Click Here to Order

Campton Waste Water Improvements

Campton Waste Water Improvements

Contract 1: Provide the labor, equipment, materials for construction of @27,000 LF of 8-inch sewer pipe, fittings and service line and appurtenances; 140 – 4-foot diameter manholes complete with frames and covers, and 50 grinder pumps with inline and end of line clean outs; latral kits, check and ball valves and all other appurtenances.

Contract 2: Provide the labor, equipment, materials for the construction of four submersible pump stations with 4-inch force mains and 6-inch force mains.

Campton, KY

Click Here to View

PARC Garage Repairs #2818

PARC Garage Repairs #2818

To furnish all labor, material and necessary equipment for PARC Garage Repairs.

Louisville, KY

Click Here to Order

Fountain Square Beautification Project

Fountain Square Beautification Project

The scope of construction includes demolition of the existing fountain, sidewalks, walls, site amenitites and electrical components, the installation of a new fountain, sidewalk pavement with pavers, light poles and fixtures, irrigation, landscaping, retaining walls and seat walls.

Somerset, KY

Click Here to View

KY 11 – Maysville Rd Utility Relocations Project

KY 11 – Maysville Rd Utility Relocations Project

Construction of approximately 3,200 linear feet of 12″ ductile waterline, 80 linear feet of 8″ ductile iron waterline, 40 linear feet of 6″ ductile iron waterline, 40 linear feet of 8″ PVC waterline, and appurtenances. Construction of approximately 4,00 linear feet of 6″ PVC forcemain, 160 linear feet of 2″ PVC forcemain, 400 linear feet of 8″ PVC gravity sewer, and 3 sanitary sewer manholes.

Mt Sterling, KY

Click Here to View

Hopkinsville Housing Authority

Hopkinsville Housing Authority

The project consists of Porch Canopies, Gutters, Aluminum Fascia Replacement, Handrails, Planter Boxes, Facade Upgrades, Stone Veneer, Concrete Walks, Retaining Wall, Site Lighting, Landscaping

Hopkinsville, KY

Click Here to View

City of Greenup Hydrants Project

City of Greenup Hydrants Project

Install 15 fire hydrants, more or less, on new and/or existing Greenup water system lines at various locations within Lloyd, Maloneton, Load, Little Sandy valunteer fire dept service areas.

Greenup, KY

Click Here to View

Lexington Streetscape Phase One Improvements, Site Amenities Package

Lexington Streetscape Phase One Improvements, Site Amenities Package

The project will require contractors with experience in the fabrication and installation of the following:
1. Custom architectural metals and glass assemblies
2. Custom signing and wayfinding features
3. Cut stone masonry
4. Specialty lighting
5. Streetscape furnishings
6. Site cast concrete

Lexington, KY

Click Here to View

Airfield Electrical at Big Sandy Regional Airport

Airfield Electrical at Big Sandy Regional Airport

To furnishing all labor, materials, and equipment and performing all work necessary to replace runway lighting circuit, electrical transformers, and runway identifier lights and add taxiway hold signs.

Debord, KY

Click Here to Order

RFB-36-13 Bond Forfeiture Group VI PBG 12

RFB-36-13
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 35.19 acres of mine land in PIKE County, Kentucky. The work will consist of earthwork, gradework, site prep, pond removal, sub-drain installation, Rock-Chimney drain installation and revegetation, among other items, on 2 bond forfeiture permits.

For continued project description see Special Conditions

Pike County, Kentucky

Click here to order

Fern Creek I and I Rehabilitation Project

Fern Creek I and I Rehabilitation Project

The project is located near Fern Creek High School and consists of CIPP lining of 8 inch diameter (14,380 LF), 10 inch diameter (300 LF), 12 inch diameter (457 LF), 15 inch diameter (1,105 LF) pipes and lateral tophats (233 EA). Additional items include Manhole Epoxy Coating (13 EA), Manhole Castings (17 EA), Chimney Seals (35 EA) and other related miscellaneous items.

Louisville, KY

Click Here to Order

WKU Track and Field Restroom and Concession Building

WKU Track and Field Restroom and Concession Building

WKU will be construction a new Track and Field Restroom & Concession Building on the main campus located near the WKU Track on South Street. As this is a new building all trades assocaited with new construction of this type will be needed under a General Contractor.

Bowling Green, KY

Click Here to Order

RFB-41-13 Dawkins Line Trail Department of Parks

RFB-41-13
This project is the development of a multi-use path in Johnson County and Magoffin County along the former Dawkins Railroad Line. The trail will have an equistrian-friendly crushed aggregate surface. The existing railroad bridges will be repaired and retrofitted with new decking and safety handrails for equistrian, pedistrian, and bicycle use. Stormwater drainage items will be cleaned, modified, and/or replaced to properly drain surface water. Safety signage meetingt the Manual on Uniform Traffic Control Devices (MUTCD) guidelines will be placed at trail intersections with public roads. Much of the project is in remote areas and access is limited. Many areas require crossing existing railroad structures to access. The project is a lump sum base bid project with addiitive alternates.

Johnson and Magoffin Co., KY

Click here to order

North Buckman Street Main Replacement and Pressure Reducing Station Project

North Buckman Street Main Replacement and Pressure Reducing Station Project

Louisville Water Company is requesting Bids for the installation of +/- 2,050 lineal feet of 16-inch DPW water main, +/- 430 lineal feet of 12-inch DPW water main, +/- 3,530 lineal feet of 12-inch PVC water main, +/- 50 lineal feet of 8-inch DPW water main, and +/- 1,295 lineal feet of 6-inch PVC water main. The project also includes pressure reducing station and installation of 10 fire hydrants and 58 customer services.

Louisville, KY

Click Here to Order

12-117 / John L. Huber Building Emergency Operations Center

12-117 / John L. Huber Building Emergency Operations Center

Louisville Water Company is requesting bids to provide all labor, rigging, tools, equipment and materials to provide and install a new AV conferencing system, distributed antenna system, related electrical work and other work as noted in the contract documents.

Louisville, KY

Click Here to Order

Franklin Housing Authority

Franklin Housing Authority

Roofing Replacement

Franklin, KY

Click Here to View

Fulton Housing Authority

Fulton Housing Authority

Parking Areas, Concrete Walks, Storage Buildings, Stamped Concrete Porch Steps, Vinyl Railings/Rencing, Vinyl Porch Columns, and Porch Roof Modifications

Fulton, KY

Click Here to View

Ashland Housing Authority

Ashland Housing Authority

Work includes: work to alleviate landslide damage to site by the replacement of sidewalks with the addition of individual porches to assist in drainage away from the building, fill and grade work for drainage away from the building, and construction of lawn area swales and retaining wall.

Ashland, KY

Click Here to View

Wastewater System Improvements – Berry, KY

Wastewater System Improvements – Berry, KY

Upgrade of existing wastewater collection and treatment facilities.

Berry, KY

Click Here to View

RFB-38-13 Construct Human Resource Office (HRO) Building

RFB-38-13
The project consists of construction of a one-story, Human Resources Office Building that will be built adjacent to the existing G-1 Building. The building includes approximately 5,514 gross square feet in the Base Bid. The structure will be comprised of load bearing insulating concrete form walls with a brick veneer and precast concrete roof deck. The roof system will be an EPDM single-ply system. Interior walls will be non-load bearing metal framing with painted gymsum board.

Frankfort, Kentucky

Click here to order

RFB-31-13 Electrical Upgrades – Southwest Campus Electrical Upgrades –

RFB-31-13
The work consists of upgrading the primary electrical distribution system and
emergency power systems at JCTC. A new Owner supplied S&C pad mounted
primary switch and attendant expansion of the primary distribution system to form a
complete primary electric tie loop for the campus is required. Additionally removal and
replacement of the existing emergency power system serving the campus with three
diesel gensets and attendant low voltage distribution is included.

Louisville, Kentucky

Click here to order

RFB-33-13 ADA Evaluation & Remediation Lees Campus

RFB-33-13
The project is an upgrade of selected campus areas to make them ADA accessible in
compliance with the Kentucky Building Code and ADAAG current guidelines. This work
occurs in two campus areas and consists of; earthwork, concrete retaining walls,
concrete walks and steps, brick veneer masonry over CMU units, cut stone wall caps,
wood framing/decking, exterior gypboard soffits, break metal flashing, fascia and rain
drainage system, TPO roofing system, lighting, painting and asphalt paving, patching

Click here order

RFB-34-13 Bond Forfeiture Group V LON 12

RFB-34-13
Work will consist of reclamation work on approximately 65.65 forfeited acres of mine
land in CLAY County, Kentucky. The work will consist of earthwork, pond removal,
and revegetation of approximately 24 acres of disturbed land, among other items, on 4
bond forfeiture permits.

Clay County, Kentucky

Click here to order

Rood and Riddle Equine Hospital New Pharmacy and Training Facility

Rood and Riddle Equine Hospital New Pharmacy and Training Facility

The project consists of the construction of approximately 15,521 SF new Pharmacy and Training Center building that will be built on the campus of Rood and Riddle Equine Hospital. The Project consists of construction of a two story brick veneer building with concrete slab on grade, wood framed walls, wood engineered “I” joist and steel frame second floor framing, with wood truss roof system. Lump Sum Bid Proposals shall be addressed to the Owner from qualified Sub-Contractors to the Owner’s Construction Manager as follows:
Hawkins Construction (CM)
Jeremy Leestma

Potential Sub-Contractors interested in bidding on the project shall contact Hawkins Construction prior to obtaining bid documents. Email hawkinsconstruction@dcr.net

Lexington, KY

Click Here to View

City of Munfordville Water System Improvements

City of Munfordville Water System Improvements

The work consists of constructing approximately 3,806 linear feet of 6-inch water line that will be divided into three projects. This contract will provide the necessary labor, materials, and apprutenant items necessary to complete the construction.

Munfordville, KY

Click Here to Order