Uncategorized

Big Sandy Waterline Extensions Contract G

Big Sandy Waterline Extensions Contract G

a) 2,250 LF – 3″ CL Water Lines
b) 1,600 LF – 2″ CL 250 PVC Water Lines and 3/4″ CL 200 Service Lines
c) 2 EA – Tie-ins
d) 4 EA – 3″ and 2″ Gate Valves and Blow-offs

Big Sandy Water District, KY

Click Here to View

Champions Court I Student Housing Bid Package 3

Champions Court I Student Housing Bid Package 3

Champions Court I Student Housing Bid Package 3

Champion Court I Student Housing is a new dorm located on University of Kentucky’s campus between Blazer Hall and Memorial Coliseum. The new dorm will be approximately 285,000 sf that is 8 levels. It will be a concrete framed structure. Site improvements include new site utilities and plaza areas.

Bid Package 3 is the exterior skin and interiors bid package.

Work Categories Bidding on May 1, 2013

WC03-T Structural & Misc Steel
WC03-U Decorative Railing
WC03-V Finish Carpentry
WC03-X Roofing
WC03-Z Joint Sealants
WC03-CC Windows – Vinyl (Labor Only)
WC03-DD Aluminum Storefront, Curtainwall and Glazing
WC03-EE Drywall & Ceilings
WC03-FF Painting
WC03-JJ Wire partition Shelving
WC03-KK Window Treatments
WC03-LL Landscape
WC03-MM Site Concrete
WC03-NN Testing and Balancing

Lexington, KY

Click Here to View

WKU-PDC-2013-065 Downing University Center Food Service Equipment

WKU-PDC-2013-065 Downing University Center Food Service Equipment

This shall be for furnishing the food service equipment for the newly renovated Downing University Center Fresh Foods dining area. Successful contractor shall furnish, deliver, and install the equipment. Final Utility connections will be by others.

Bowling Green, KY

Click Here to Order

13-63 / Oracle Workspace Optimization — John L. Huber Building

13-63 / Oracle Workspace Optimization — John L. Huber Building

Louisville Water Company is requesting bids to provide all labor, rigging, equipment and materials to remodel and reconfigure the third floor and portion of the basement of the Louisville Water Company’s John L. Huber Building to provide office workspace for fifty-six (56) additional people and other work as noted in the plans and contract documents.

Louisville, KY

Click Here to Order

Various Branchline Extensions Contract 24

Various Branchline Extensions Contract 24
Contract 24 will consists of the construction of approximately 12,000 linear feet of 3 inch waterlines. The Contractor shall furnish all materials, equipment and labor necessary to complete the construction of the waterline, appurtenances and reclamation. Time of completion for the contract is 180 days.
Vicco, KY

Click Here for More Details

A contract to furnish all labor, materials and other necessary equipment for the Dupont Area Sidewalk Construction Project

A contract to furnish all labor, materials and other necessary equipment for the Dupont Area Sidewalk Construction Project # 3041

Louisville, Ky

Click Here to Order

Allen County Career Technical Center Site Package

Allen County Career Technical Center Site Package

New Allen County Career Technical Center
Bowling Green, KY

All bidding contractors will be required to obtain a Proposal Form from Alliance Corporation. Please contact Judy Reeves of Brenda Thompson at 270-651-8848. Any bidder requesting a Proposal Form who has not previously obtained a set of plans and specs from Lynn Imaging shall be required to purchase the Volume 1 Project Manual at a cost of $25.00 non refundable with the check made payable to Alliance Corporation. Review section 01900 Bid Package Descriptions for scope of work designations and responsibility.

The following bids are requested:
010 – Grading and Storm Drainage

Bowling Green, KY

Click Here to View

Contract 2 Tank Rehab & WTP Pumps Quicksand Project

Contract 2 Tank Rehab & WTP Pumps Quicksand Project
Tank Rehab and WTP Pumps consists of two vertical turbine pumps, SCADA / telemetry system modifications, electrical work, steel water storage tank modifications, water tank repainting, and water tank valve vault together with all related work as specified and shown on the Drawings.
Jackson, KY
Click Here for More Details

Contract 1 Waterline Quicksand Project

Contract 1 Waterline Quicksand Project
Waterlines consists of about 13,000 feet of 10-inch PVC water main, directional drilled river and creek crossings, and road bores, together with all related work as specified and shown on the Drawings.
Jackson, KY
Click Here for More Details

Highview Estates — Paving, Curb, and Drainage Structure Improvements

Highview Estates — Paving, Curb, and Drainage Structure Improvements

1. Asphalt Overlay 2,250 Tons
2. Asphalt Base Failure Repair 220 S.Y.
3. Concrete Curb Repair 300 EA.
4. Concrete Curb Replacement 100 L.F.
5. Concrete Curb Box Inlet Repair 3 EA.

Taylorsville, KY

Click Here to Order

RFB-192-13 Lincoln Village Retrofit

RFB-192-13
Department of Juvenile Justice
Estimate: $120,000.00

The demolition of drywall and 6″ floor base as shown on Drawings and specifictions; installation of new drywall on all interior walls; installation of new 20 doors and hardware sets; removal and installation of select lights and air vents; removal of all damaged floor VCT and installation of new tile to replace them; Application of biocide over all removed drywall areas and paint all wall and ceiling surfaces and frames; remove all painted light switchs, outlets, etc. as called for in Specifications and replace with new ones to match the existing that are to be removed; patch and repair any damaged drywall walls and ceilings that are to remain.

Elizabethtown, Kentucky

Click here to order

Franelm Road Culvert Replacement Project

Franelm Road Culvert Replacement Project

This project will provide for the installation of a 10’ x 6’ concrete box culvert and all appurtenant work. Project is located on Franelm Road at Bruce Creek in the Merlyn Acres Subdivision, Louisville Metro Council District 25.

Louisville, KY

Click Here to Order

RFB-193-13 Elm Fork & Minors Creek Stream Restoration

RFB-193-13
Dept. of Fish & Wildlife
Estimate: $1,114,879.00

The proposed work consists of the restoration and enhancement using Natural Channel Design techniques of approximately 8,562 linear feet of stream including Elm Fork, Minors Creek, and six headwater tributaries. Tasks to be performed in order to achieve project goals include construction of proposed channel benches; excavation of proposed floodplains; reshaping of existing channels; construction of in-stream structures; preparation of soil for seeding; native planting and seeding; installation of erosion control fabric and mulch; and harvesting, transporting, installing, and maintaining live stake and vegetative materials. Elm Fork, Minors Creek, and their tributaries are first, third, and fourth order streams with intermittent and perennial flow regimes. The project will involve the restoration of approximately 4,549 linear feet of Elm Fork, 2,109 linear feet of Minors Creek, and 1,904 linear feet of tributaries. Restoration will include in-stream structures such as log vane/rootwad combinations, toe wood/sod mat, live brush layering, rock and log step pools, rock cross vanes, and constructed riffles as well as vegetation of the stream banks and establishment of a forested riparian corridor against the stream.

Kleber WMA, Owen County, KY

Click here to order

RFB-186-13 Shower Renovation

RFB-186-13
Lake Cumberland Youth Development Camp
Estimate: $137,461.00

The Work includes removing fluid applied floor coating down to existing concrete slab at areas indicated on drawings (approximately 1,189 sf). New quarry tile will be installed over the same area which includes, toilet areas, lavatory areas, a laundry area, storage areas, dressing area, and a shower area. The shower and dressing areas are to also receive electric resistance radiant heating systems beneath the new tile to help reduce mold and mildew in these areas. The shower area is 11’ x 15’ and currently utilizes two 6 head gang shower pillars. These gang shower pillars will be removed and replaced with 10 shower stalls, 3’ x 3’, each stall with its own drain and surface mounted shower supply tower. Shower stall partitions will be floor mounted, overhead braced solid plastic type with breakaway curtains, no doors. The Work also includes cleaning existing C.M.U. walls and painting them with mold and mildew resistant paint. As an alternate to the paint in the shower area, the Work will include 1/4” solid surfacing wall panels from the top of the tile base to the ceiling. The Work also includes replacing a substantial portion of the existing plumbing, both supply and waste. The work area is a over an unfinished basement making the existing plumbing easily accessible. The Work also includes a new ductless HVAC system and additional ceiling lighting. Refer to drawings and specifications for additional information.

Monticello, Kentucky

Click here to order

RFB-189-13 HRO Building Demolition Military Affairs

RFB-189-13
Boone National Guard Center
Estimate: $ 70,472.00

The Boone National Guard Center DMA HRO Demolition package consists of two buildings and associate site grading. Building 1 (HRO) is a two story structure that includes a two story covered porch. The structure consists of steel structural framing, wood truss roof framing, and concrete slab on grade with footers. Exterior walls include brick and vinyl cladding. Building 2 (EST) is a five year old pre-engineered metal building, slab on grade with concrete piers.

Frankfort, Kentucky

Click here to order

2362.0 CM Services for Renovate/Expand Commonwealth Stadium

2362.0 CM Services for Renovate/Expand Commonwealth Stadium

Lexington, KY

Click Here to View

Unit Price Concrete 2013 City of Frankfort

Unit Price Concrete 2013 City of Frankfort

General concrete sidewalk and curb maintenance and construction and new sidewalk and curb construction work to be performed for the City of Frankfort on an as needed, cafeteria style project scope with bid unit prices to remain in affect for a period of one-year from the stated bid opening.

Frankfort, KY

Click Here to View

Washington County High School Highway Entrance

Washington County High School Highway Entrance

Washington County High School Highway Entrance
300 West US 150 Bypass Highway
Springfield, KY 40069

Springfield, KY

Click Here to View

Housing Authority of Paintsville

Housing Authority of Paintsville

Capital Funding Program KY36P027-501-11 & 12

Paintsville, KY

Click Here to View

East Jessamine Elementary Bleachers

East Jessamine Elementary Bleachers

Nicholasville, KY

Click Here to View

RFB-187-13 SGH Restroom Renovation

RFB-187-13
Shelbyville Group Home
Estimate: $ 43,323.00

This project involves renovating two bathrooms in the Shelbyville Group Home. The bathrooms are similar except one has a roll in shower and one has a bath tub. The demolition of the project will include removal of the floor, the existing fixtures, and the existing gypsum board from 4’-0” to the floor. New subfloor and joist will be installed. In areas to receive mud set sloped tile floor the joists will be recessed. Both bathrooms will receive new tile floors. A new tile roll in shower will be installed as will a new tub. The toilet and associated grab bars can be salvaged and reinstalled. The vanities will be replaced with new wall mount porcelain lavatories. A goal of the project is to provide durable finishes that will stand up to a high use level. The project includes two alternate bid items which are to renovate the remaining two bathrooms in the same building.

Alternate No. 1: Renovation of Second Roll In Shower Bathroom.

Alternate No. 2: Renovation of Tub Bathroom.

Shelbyville, KY

Click here to order

North Bullitt High School & College & Career Center

North Bullitt High School & College & Career Center
At the Contractor’s option, North Bullitt High School College & Career Center, Bid Package 1 – General Construction may be bid individually and/or as a combined bid with the Bullitt East High School College & Career, Bid Package 1 – General Construction.

At the Contractor’s option, North Bullitt High School College & Career Center, Bid Package 2 – Technology may be bid individually and/or as a combined bid with the Bullitt East High School College & Career, Bid Package 2 – Technology.
Shepherdsville, KY
Click Here for More Details

Bullitt East High School-College & Career Center

Bullitt East High School-College & Career Center
At the Contractor’s option, Bullitt East High School College & Career Center, Bid Package 1 – General Construction may be bid individually and/or as a combined bid with the North Bullitt High School College & Career, Bid Package 1 – General Construction.

At the Contractor’s option, Bullitt East High School College & Career Center, Bid Package 2 – Technology may be bid individually and/or as a combined bid with the North Bullitt High School College & Career, Bid Package 2 – Technology.
Mt. Washington, KY
Click Here for More Details

13-23 / Breckinridge Lane Water Main Grid-Tie Project

13-23 / Breckinridge Lane Water Main Grid-Tie Project

Louisville Water Company is requesting Bids for the installation of 580 linear feet of eight (8)-inch DPW water main along Breckenridge Lane at 4401 Breckenridge Lane. Also included with the project is the installation of 75 linear feet of sixteen (16)-inch steel casing pipe and the installation of two (2) fire hydrants.

Louisville, KY

Click Here to Order

RFB-182-13 Russell Court Apt Roof Replacement

RFB-182-13
Kentucky State University
Estimate: $149,800.00

Scope of work includes demolition of existing roof covering, and installation of 2-ply modified bitumen roof system (including tapered insulation and roof drains) at Kentucky State University’s Russell Court Apartments, as well as installation of supplemental drainage, and replacement of metal fascia, and flashing/counterflashing

Frankfort, Kentucky

Click here to order

Subscribe