Project MC6971 UKGS 7th Floor Acute Bed Space
Project MC6971 UKGS 7th Floor Acute Bed Space
Contractors to furnish labor and materials for the renovation of the 7th Floor UKGS to make 24 rooms patient ready
Lexington, KY
Project MC6971 UKGS 7th Floor Acute Bed Space
Contractors to furnish labor and materials for the renovation of the 7th Floor UKGS to make 24 rooms patient ready
Lexington, KY
Casey County Community and Education Center
Construction of a one-story 13,765 square foot building for use as a community space and adult education and training and includes associated site work, general construction, fire protection, plumbing, HVAC, and electrical.
The estimated construction cost is 3.25 million.
Liberty, KY
WT Young LIbrary B-29 Suite Renovation
Partial renovation of five rooms in the basement of the Young Library to create three new offices for the new presentation learning center as well as creating open learning areas for the center. Project will include electrical, HVAC modifications, reorganizing the current layout, fit and finish upgrades.
Lexington, KY
KRCC Maple Ridge Apartments
Subcontract construction portions of Maple Ridge Apartments, including, but not limited to, sanitary sewerage and domestic water, hot-mix asphalt paving, masonry, HVAC, packages waste water treatment plant, electrical, metal porch and stair fabrication, and exterior finishes.
Perry Co, KY
NKCC-08.03-14 Campus Recreation Renovation Bid Package 3
The bid package consists of drilled foundations and concrete
Highland Heights, KY
OBannon Woods State Park Road and Parking Improvements
Bids shall be taken from Prime Contractors pre-qualified by the Public Works Certification Board in the following classification: 1611.02 Asphalt Construction of Roads and Parking Lots.
Harrison Co, IN
New Pleasant View Elementary
The New Pleasant View Elementary project consists of a 45,380 square feet new construction. The project includes sitework, concrete, masonry, structural steel, finishes, mechanical, fire protection and electrical.
Williamsburg, KY
Parksville Water District Contract 2 SCADA System
Furnish, install and place into operation a new SCADA System.
Engineer’s Estimate – $ 185,000
Parksville, KY
Parksville Water District Contract 1 – Alum Water Transmission Main
Furnish, install and place into operation a new Transmission Main along Alum Springs Crosspike
Engineer’s Estimate – $400,000
Parksville, KY
West Shelby Water District Phase 2 – Horizon Group Waterline Extension
This contract consists of approximately 2,680 LF of 16” Ductile Iron waterline, 455 LF of Bored Steel Encasement for 16” pipe, 120 LF of Open Cut Steel Encasement for 16” Pipe, 380 LF of 8” PVC waterline, 80 LF of Bored Steel Encasement for 8” Pipe, 500 LF of 6” PVC waterline and appurtenances.
West Shelby Water District, KY
Arch and Column Replacement at Community Corrections Entrance
Arch and Column Replacement
Lexington, KY
RFB-150-14
Scope of Work:
This project involves renovating four bathrooms in the Meadows Group Home. The bathrooms are similar except one has a roll in shower and three have a bath tub. The demolition of the project will include removal of the floor, the existing fixtures, and the existing gypsum board from 4’-0” to the floor. New subfloor and joist will be installed. In areas to receive mud set sloped tile floor the joists will be recessed. All bathrooms will receive new tile floors and walls to 4’-0” AFF. A new tile roll in shower will be installed. New water closets will be installed. The vanities will be replaced with new wall mount solid surface countertops with new drop in sinks. A goal of the project is to provide durable finishes that will stand up to a high use level.
Mount Washington, Kentucky
Requesting Qualifications for a Construction Manager At Risk for the Georgetown Police Department Building Project
Georgetown, KY
Georgetown/Scott County EMA/OHS Antenna Tower Replacement
The project is considered a “Turn-Key Project” and consists of the replacement of the existing Emergency Management communication antenna tower with a new self-supporting type antenna tower with antennas and waveguide ice bridge to the existing building and shall include all design engineering and all associated work for a complete antenna tower installation ready for use by the Owner. After new tower is installed and operational as confirmed by the Owner, the existing tower shall be removed as part of the scope of work.
Georgetown, KY
First United Methodist Church
Georgetown, KY
Ewing School Force Main Project
The work to be bid upon is described as follows:
15,000 LF 6” PVC Force Main
12,000 LF 4” PVC Force Main
2,000 LF 3” PVC Force Main
6,000 LF 2” PVC Force Main
110 Individual Residential Grinder Pump Station
1 – 180gpm Pump Station with Odor Control
All Appurtenances
Flemingsburg, KY
RFB-149-14
Hopkinsville Community College
Estimate: $125,000.00
The project consists of removing and old generator located in the Admin. Bldg. and
associated transfer switch and providing a new generator located at the exterior of the
Admin. Bldg., transfer switches and associated distribution equipment with additional
capacity to handle existing and new anticipated loads. The new emergency power
distribution system will be separated into NEC 700 emergency loads and NEC 702
optional standby loads. Existing HVAC equipment used for cooling of data equipment
loads will be removed from the normal power distribution system and reefed from the
new emergency NEC 702 optional standby loads distribution system. The project
includes and expansion of the existing thru the building management system. The
project will include testing and commissioning of the new emergency power distribution
system prior to refeeding existing loads from the new distribution system.
Hopkinsville, Kentucky
Davis Park View
Construction of two-duplex apartment building, two single family buildings and two-quadplex buildings located in the city of Lexington
The buildings will include one and two levels and be constructed with wood framing, brick veneer, fiber cement siding, metal roof, and other materials required by the funding source.
SCOPE of WORK
General Scope of Work includes excavation and paving, concrete, masonry and, structural steel, metals, rough and finish carpentry, thermal protection, roofing, all finishing trades, fire protection, plumbing, HVAC and Electrical work. MBE / WBE trades are encourged to participate.
Lexington, Ky
Bob O Link Trunk Sewer
The project includes providing all construction supervision, labor, materials, tools and test equipment for the replacement and upsize of approximately 6,500 linear feet of sanitary sewer from manhole WR4_480 upstream to WR4_29 within the Wolf Run Sewer Shed of Lexington-Fayette County, Kentucky
Lexington, KY
2239.74 Patient Care Facility
Pavilion A – 3rd Floor Pharmacy
TC-016 Clean Rooms
Lexington, KY
New Water Treatment Plant City of Greensburg
Construction of a new 2.0 mgd water treatment plant. The construction of a new raw water intake and pump station; operations, filter, and chemical building; flocculation and/or settling basins; clearwell and high service pump station; one sludge lagoons
Greensburg, KY
Raw Water and High Service Transmission Mains City of Greensburg
800 LF of 10-inch restrained joint, ductile iron water line pipe, 1600 LF of 10-inch PVC pipe, and 850 LF of 12-inch PVC water pipe and accessories; and 40 LF of 18-inch bore and cover pipe
Greensburg, KY
Midtown Sanitary Sewer Upgrades
Division A-Upper Sinking Creek Trunk Sewer
Section 1-Furnishing and installation of approximately 3,262 L.F. of 30-inch gravity sewer and accessories.
Section 2-Furnishing and installation of approximately 520 L.F. of 18-inch garvity sewer and accessories and 414 L.F. of 8-inch gravity sewer and accessories.
Division B-Improvements to the Sinking Creek Wastewater Treatment Plant
Section 1-Furnishings and Installation of variable speed drive equipment for the raw sewage pumps and lagoon effluent flow monitoring equipment and accessories.
Section 2-Removal and replacement of lagoon effluent flow control equipment and accessories.
Section 3-Diversion to chlorine contact basin.
Division C-Lower Sinking Creek Trunk Sewer
Section 1-Furnishing and installation of approximately 3,345 L.F. of 24-inch gravity sewers and accessories.
Section 2-Furnishing and installation of approximately 1,901 L.F. of 24-inch gravity sewer and accessories.
Section 3-Furnishing and installation of approximately 2,732 L.F. of 24-inch gravity sewer and accessories.
Somerset, Ky
Woodland Glen 5 Student Housing BP 4
Bid Package 4 is the finishes bid package for Woodland Glen 5 Student Housing.
Work Categories Bidding on Dec 17, 2013 @ 1:00 PM:
WC04-M Wood Framing Labor (Messer)
WC04-N Wood Framing Material
WC04-P General Trades (Messer)
WC04-R Gypcrete Underlayment
WC04-S Masonry (Previously Awarded)
WC04-T Structural Steel and Misc Steel
WC04-U Decorative Railing
WC04-V1 Manufactured Casework – Material Only
WC04-V2 Manufactured Casework – Labor Only
WC04-V3 Granite
WC04-V4 Custom Casework
WC04-W1 FRP – Material Only (Previously Awarded)
WC04-W2 FRP – Labor Only (Previously Awarded)
WC04-X Roofing
WC04-Y Fireproofing
WC04-Z Joint Sealants
WC04-AA1 Doors/Frames/Hardware
WC04-AA2 Access Control Hardware (Previously Awarded)
WC04-BB Windows – Vinyl – Material Only (Previously Awarded)
WC04-DD Aluminum Storefront, Curtainwall & Glazing
WC-EE1 Drywall and Ceilings
WC-EE2 Insulation
WC-FF Painting
WC-HH Misc Specialties
WC-JJ Wire Partition Shelving
WC-KK Window Treatments
WC-RR Tile (Previously Awarded)
Lexington, KY
Robertson County School New Greenhouse
New Greenhouse
A Pre-Bid Meeting will be held on Tuesday Nov 26th at 2:30 PM at 1760 Sardis Rd, Mt. Olivet, KY 41064
Mt. Olivet, KY