Equestrian View Final Pavement Construction Plans
Equestrian View Final Pavement Construction Plans
Pavement Construction Plans
Lexington, KY
Equestrian View Final Pavement Construction Plans
Pavement Construction Plans
Lexington, KY
Jeffersontown Gaslight Recreational and Workplace Bicycle and Pedestrian Trail
Jeffersontown, KY
This project calls for a proposed eight to ten foot wide asphalt or concrete (where indicated) shared use path along Bluegrass Parkway from Hurstbourne Parkway to Blankenbaker Parkway.
Pikeville Fire Station REBID
New Construction of 4,217 SF fire station with three drive through truck bays
Pikeville, KY
Hopkins Elementary School Renovation & Addition
This project includes the construction of a new addition that consists of five classrooms and six resource rooms with support spaces. Construction includes load bearing CMU walls, steel truss system with metal decking and asphalt shingle roofing. The mechanical system includes heat pump units to match the existing building system. Renovation of some existing spaces is included in the project scope, including new finishes and a secure entry vestibule.
Somerset, KY
UK Agriculture Information Center
The project includes renovation of the existing study room open area to provide for a new Training Room. By additive alternate, a Multi-Purpose Classroom will be constructed in the existing open study room area, along with the removal of an existing glazed partition wall and new carpet flooring installation. The work includes new metal stud/gypsum partition walls, steel frames, wood doors, door hardware and new finishes including rubber wall base, carpet tile, painting, acoustical ceiling system and corner guards. The newly renovated areas will also include new HVAC, power/data and reworked existing lighting and other miscellaneous work.
Lexington, KY
Green River Valley Water District Rio Verde Dam Improvements
Contract consists of the installation of a grout curtian to reduce the seepage along the west abutment of the Rio Verde Dam, 920 LF of 24″ HDPE pipe and appurtenances to divert the base flow around the dam, and various dam remedial improvements.
Green River Valley Water District, KY
Madisonville WWTP
The project scope includes replacement of existing variable frequency drives, modifications to the existing SCADA system programming, and associated wiring, conduit, and connections.
Madisonville, KY
Click Here for More Details
17th Street Flood Pump Station Dry Weather Overflow Elimination Project
The scope of the work includes installation of a new hydraulic and electric motor actuators, stems and gate; installation of a motor control center (MCC), electrical, instrumentation and controls, rerouting plumbing and process piping; and installation of gravity sewer and manholes.
Louisville, Ky
RFB-70-14
General Butler State Resort Park
Estimate:
$ 31,800.00
The project consists of roof replacement on one (1) building; Lodge Kitchen Roof. Remove existing roof membrane system down to existing roof deck. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over two layer insulation, and cover board insulation. Provide crickets and tapered edge where indicated. Provide new metal components; e.g. metal counter flashings, scuppers, conductor heads, downspouts, plumbing vent flashings, metal expansion joint, etc. Existing RTU to be removed & re-set.
Carrollton, Kentucky
RFB-58-14
Bond Forfeiture Group V LON 13
Estimate:
$222,197.50
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 106 acres of mine land in Letcher County, Kentucky. The work will consist of earthwork grading, pond removal, hoe ramming, 24” HDPE pipe installation and revegetation, among other things, on six bond forfeiture permits. For continued project description see Special Conditions.
Letcher County, Kentucky
RFB-66-14
Bluegrass Station
Estimate: $392,482.00
The project involves re-roof work on center bay of a located at Bluegrass Station in
Lexington, KY. The two side bays have been reroofed recently. The existing
approximately 63,000 square foot roof to be removed is an ballasted EPDM single ply
system on metal deck. There is reason to be believe that a significant amount of the
metal deck shall need to be replaced. The new roof system is TPO single ply system
that is adhered attached over a 1 1/2″ rigid board insulation. The ballast will be
disposed of on site.
Fayette County, Kentucky
The Kentucky Center for the Performing Arts
Estimate:
$285,162.00
Removal of a portion of the building’s existing roofing and insulation to the existing structural deck and replacement with a new mopped down reinforced rubberized asphalt membrane, insulation and extensive green roof system. In addition the project includes 20ft. Of angled and curved vegetative wall panels.
Louisville, Kentucky
National Guard Armory
Estimate:
$109,193.00
This Work includes the removal and replacement of existing translucent fiberglass sandwich panel system in existing rough opening. The existing exterior cementitious stucco on the front elevation will be removed down to existing C.M.U. substrate and replaced with prefinished metal wall panels over galvanized hat channel furring, over 1 ½” rigid insulation, over fluid applied water-proofing. Existing brick and cut stone masonry will be pressure cleaned and re-pointed as necessary to condition agreed to be satisfactory by Contractor’s mock-up at Pre-Installation conference. Specifically, brick masonry will be re-pointed every sixth course where brick masonry ties have rusted and dislodged mortar joints outward from face of brick. Re-pointing Work will include installing new weep vents in existing brick masonry at upper and lower portions of exterior wall to provide adequate ventilation of existing brick veneer. Existing brick masonry chimney will be demolished to a point 24″ above existing shingle roof plane. Bricks from demolished chimney are to be salvaged and re-used in replacing spalled or damaged brick masonry units in existing exterior walls to be re-pointed. The Work also includes installing new aluminum z-channel trims around existing louvers to conceal rough sealant joints.
Jackson, Kentucky
Leslie Co Veterans Cemetery Mass Regrade
Hyden, KY
Click Here foe More Details
Russell Family Medical Center Re-Bid for Earthwork Only
The Russell Family Medical Center project consists of approximately 28,892 square feet of new construction. The project includes sitework.
Russell Springs, KY
Click Here for More Details
A price contract for a portion of Louisville Metro Government’s need for HVAC Water Services #3104
A price contract for a portion of Louisville Metro Government’s need for HVAC Water
Treatment Services for a twelve (12) month period.
Louisville, KY
Tea 21 Sidewalk Improvements
Construction of approximately 3,000 LF of 4-foot wide concrete sidewalk replacement
Hartford, KY
Yuko-En on the Elkhorn The Four Seasons Villa Project RFP
Request for Proposals
Georgetown, KY
A price contract for a portion of Louisville Metro Government’s need for Professional Window Cleaning #3103
A price contract for a portion of Louisville Metro Government’s need for Professional
Window Cleaning for a 12-month period.
Louisville, KY
4H Cabin, Feltner 4H Camp, London KY
Contractor to furnish labor and material to construct a cabin at Feltner 4H Camp, London, KY
London, KY
City of Jenkins Water Plant Filter Improvements
New filter media, wash troughs, surface agitators, underdrains and controls, new flow meters and electric actuated valves, painting and piping modifications
Jenkins, KY
Demolition 1065 Building Fayette Co Health Department
Complete demolition and off site disposal of an existing one-story light steel frame and masonry building.
Lexington, KY
Clinton County Wellness Center Renovation
Albany, KY
Stormwater Restoration City of Berry
Upgrade of existing stormwater system.
Berry, KY
Housing Authority of Williamsburg HVAC Upgrades
HVAC Upgrades
Williamsburg, KY