RFB-149-14 Emergency Power Distribution Phase 2
RFB-149-14
Hopkinsville Community College
Estimate: $125,000.00
The project consists of removing and old generator located in the Admin. Bldg. and
associated transfer switch and providing a new generator located at the exterior of the
Admin. Bldg., transfer switches and associated distribution equipment with additional
capacity to handle existing and new anticipated loads. The new emergency power
distribution system will be separated into NEC 700 emergency loads and NEC 702
optional standby loads. Existing HVAC equipment used for cooling of data equipment
loads will be removed from the normal power distribution system and reefed from the
new emergency NEC 702 optional standby loads distribution system. The project
includes and expansion of the existing thru the building management system. The
project will include testing and commissioning of the new emergency power distribution
system prior to refeeding existing loads from the new distribution system.
Hopkinsville, Kentucky