Runway 6-24 Crack Repairs and Overlay Project Wendell H Ford Airport
Runway 6-24 Crack Repairs and Overlay Project Wendell H Ford Airport
Runway 6-24 Crack Repairs and Overlay Project
Chavies, KY
Runway 6-24 Crack Repairs and Overlay Project Wendell H Ford Airport
Runway 6-24 Crack Repairs and Overlay Project
Chavies, KY
City of Frankfort Forest Villa Manhole Rehabilitation
The project scope includes the rehabilitation of a manhole and an open cut repair of one of its pipe penetrations along with replacement of the cover of a second manhole with a hatched lid.
Frankfort, KY
City of Frankfort Crestwood I&I Rehabilitation Project
Frankfort, KY
Meadows Northland Arlington Neighborhood Improvement Project Phase 5C
Construct all associated sanitary and storm sewer piping and structures as shown. Provide all erosion control measures, concrete sidewalk, curb and gutter, and asphalt paving as required.
Lexington, KY
Mckee Housing Authority Sidewalks and Porch Pads
The replacement of sidewalks and installation of additional porch pads.
McKee, KY
TARC Customer Service Kiosk Replacement
The Transit Authority of River City will receive sealed bids for the furnishing of all labor, materials and the performance of all work required for the Union Station TARC Customer Service Kiosk Replacement Project.
Louisville, KY
Lexington-Fayette Urban County Housing Authority Central Office Exterior Improvements
Central Office Exterior Improvements
Lexington, KY
Stratton Branch AML Water Supply Project
This project consists of providing all materials, labor, and equipment for the construction of a water distribution system including 4,230 of PVC water line, 1,880 LF of ductile iron water line, 1,150 LF of HDPE service line, and 27 residential meters.
Prestonsburg, KY
Cerulean 300,000 Gallon Water Storage Tank Barkley Lake Water District
The construction of a 300,000 gallon water storage tank, site work, yard piping, access road, and fencing.
Cerulean, KY
Water System Improvements Barkley Lake Water District
The installation of approximately 6,795 LF of 6-inch PVC pipe, 305 LF of ductile iron pipe, hydrants, water booster pumping station, telemetry and accessories.
Trigg Co, KY
Kentucky Division of Water
Estimate:
$140,400.00
The project consists of the following main activities:
Remove accumulated sediment from the existing Beech Creek Dam spillway stilling basin and downstream channel; Remove rock in the channel bottom to lower the water level in the stilling basin; and Locate, install additional piping, clean, and videotape the existing foundation drains.
Manchester, Kentucky
Butler Reserve Center Renovation Military Affairs
Estimate: $3,332,943.00
The Work consists of selective demolition and renovation to an existing military administrative/training building located next to Bowman Field, in Louisville, Kentucky, that consists of a 52,000 S. F., 2-story administration wing and a 12,000 S. F., one-story Assembly wing. Interior renovation work will entail: replacement of existing floor finishes throughout most of the facility, replacement of limited ceiling tiles, construction of limited interior walls with doors and frames, new HVAC, electrical upgrades, limited plumbing, painting; while exterior work will primarily consist of tuck pointing and sealing existing masonry as well as constructing a new “Rain Screen” wall system that will be comprised of brick,
aluminum and glass. Site work will include asphalt paving, limited grading and landscaping.
Louisville, Kentucky
CCK-1959-14 Dairy Barn
Construction of a new 22,800 SF Dairy Housing Research and Teaching Facility. The facility consist of two clay floor animal holding pack areas separated by cow feed bunk lanes and a middle feeding drive lane. The structure is to be structural steel columns and beams with light gage purlins and girts to support the exposed fastened metal roofing.
The site is greenfield. Minor grading will be required with adequate site available material.
Water is available nearby the site. The project will connect to an existing meter vault and run to a water room where a backflow preventer is located as well as a manifold to supply lines for future watering stations. Drain lines are connected to an existing waste drainage system. Sanitary sewer work is not required in this project.
Electric service is available from a nearby pole on site. This project will run empty conduit to a meter (where KU will run conductor in the conduit from the pole). This project includes a main disconnect, 200 AMP breaker panel and supply for receptacles and Owner provided, contractor installed lights and fans. Provisions for future communications is provided, but the communication work is not include in this contract.
This project moves four cow brushes from nearby barns as well as installs an automatic feed system for 16 cows in the southeastern pack.
Lexington, KY
Clark County Middle School
Roof Recoat
Winchester, KY
Franklin County Fiscal Court Buildings Electrical Conversion
Electric Conversion of elevator, HVAC and kitchen equipment for the Franklin County Fiscal Court Buildings located at 313-315 West Main Street, 321 W Main Street and First United Methodist Church building located at 211 Washington Street, Frankfort, KY.
Frankfort, KY
Water Street Arch Culvert
The scope of work includes a Unit Price Contract to provide Pre-cast Arch Culvert and related products.
Richmond, KY
City of Frankfort Unit Price Concrete Projects
General concrete sidewalk and curb maintenance and construction and new sidewalk and curb construction work to be performed on an as needed, cafeteria style project scope with bid unit prices to remain in affect for a period of one year.
Frankfort, KY
Fuel System Installation Addington Field Elizabethtown Regional Airport
This project consists of the removal of two underground 12,000 gallon UST’s and their components, the construction of an above ground fuel farm that includes a 12,000 Jet A and 100LL fuel tank and their components and the construction of a 50’x50’ concrete fueling apron.
Elizabethtown, KY
Fire Station 5 Restroom
Fire Station #5 restroom renovation includes the demolition of the existing restroom with shower and renovation construction for two restrooms with showers on the second floor of the historic fire station. The existing construction is wood framed floors and interior walls. The exterior walls are brick masonry. The existing restroom plumbing, elect5rical, HVAC and all finishes will be removed. Two new restrooms with ceramic tile showers will be constructed in the same location including a portion of the existing hallway. Finishes will be gypsum board and ceramic tile.
City of Taylorsville Utility Relocations – SR 55 at Blue Bridge
Utility Relocations – SR 55 at Blue Bridge
a. 3700 LF of 6” C900 PVC & Ductile Iron Waterlines
b. 1000 LF 8” HDPE Horizontal Drilling Waterlines
c. 19 EA 6”/8” Gate Valves
d. 4 EA Fire Hydrants
e. 1 EA Control Valve & Vault
f. 450 LF 8” Gravity Sewer
g. 120 LF 12” Steel Bore & Jack w/ 8” Gravity Sewer
Taylorsville, KY
Southern Madison Co Water District Scaffold Cane Tank Project
Scaffold Cane Tank Project
Engineer’s Construction Cost Estimate is $250,000
City of Hardinsburg Contract 9 – Water Storage Tank Improvements
One 250,000 gallon elevated water storage tank including all related appurtenances as shown, demolishing of existing 100,000 gallon elevated water storage tank, tank rehabilitation of existing.
Hardinsburg, KY
CCK-1958-14 Blazer Hall ESL Classroom
Convert 10 existing rooms into 5 new ESL classrooms and create 6 new offices, demo and abatement to be performed by UK EHS. Additional work as described in drawings will be completed by General Contractor. This work includes patching carpet, installing VCT/base, painting and electrical modifications among other items.
Lexington, KY
Barbourville Housing Authority Kitchen Upgrades
Kitchen Upgrades
Barbourville, KY
Adair Co High School Career Readiness Center Building Addition and Bus Canopies
Building Addition and Bus Canopies
Columbia, KY