Shell Travel Center Center
Shell Travel Center Center
This is roughly 6300 SF Pre-Engineered Building.
This bid is for sub-contractors only
Cave City, KY
Shell Travel Center Center
This is roughly 6300 SF Pre-Engineered Building.
This bid is for sub-contractors only
Cave City, KY
CCK-1962-14 Safety and Security Building 23 Renovation
Renovation to improve the operations center by reorganizing a partial area of the first floor. Other work includes infilling an exterior stair to create two new offices and providing direct egree from the first floor to exterior of the building.
Lexington, KY
Painted Stone Elementary Insulation of Building Envelope
Furnishing of all labor, materials and the performance of all work required for the installation of insulation in the building envelope of Painted Stone Elementary.
Shelbyville, KY
City of Nicholasville Memorial Plaza Site Improvements
Project consisting of but not limited to, water line construction, storm line construction, sidewalk placement. final asphalt surface place, topsoiling, seeding and straw together with all related work as specified and shown on the drawings
Nicholsville, KY
Georgetown Scott County Museum HVAC Replacement
Project consists of removal of the existing HVAC systems in the building and replacement with new HVAC systems using existing ductwork; and providing all associated work, including but not limited to, existing window insulated panel infill, roofing patching, wall patching including finishes, caulking and other work as indicated and as necessary for a complete, weather-tight, fully functional and operational, and finished installation.
Georgetown, KY
Georgetown Scott County Museum Lighting Replacement
Project consists of removal of the existing lighting in the Museum main display area and replacement with new lighting and controls; and providing all associated work, including but not limited to, wall patching including painting, caulking and other work as indicated and as necessary for a complete, fully functional and operational and finished installation.
Georgetown, KY
LFUCG West Hickman Trunk Sewer A
The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for the construction of approximately 200 linear feet of 60 inch, 1,200 linear feet of 54 inch, 2,800 linear feet of 48 inch, and 900 linear feet of 18 inch gravity sewer main and all of the associated structures.
Lexington, KY
Fayette Co Cooperative Extension Office Audio Visual and Lighting Upgrades
Project consists of removal of existing light fixtures and lighting control systems in the building and replacement with new dimming LED Light Fixtures and Lighting Control Systems; removal of the existing audio systems in the building and replacement with new audio systems providing new High Definition Cameras, High Definition OH Projectors, Motorized Screens, HD Video Capturing and Recording, HD Display Monitors, Smart Podiums, Wireless Interface and Wireless Handheld Control of all Systems; and providing all associated work, including but not limited to wall patching including finishes, caulking and other work as indicated and as necessary for a complete, fully functional and operations, and finished installation.
Lexington, KY
Bull Hole 30,000 Gallon Water Storage Tank
Construction of a new pedestal storage tank with a capacity of 30,000 gallons.
Letcher Co, KY
Housing Authority of Floyd County
Authority of Floyd County (Handrail and Guardrail Replacement at Exterior Steel Stairs at KY157-08 Warco)
Floyd Co, KY
NKCC-29-14 New Gateway Sign
New Gateway Sign at University Drive and Johns Hill Road.
Highland Heights, KY
CCK-1961-14 Little Library Rooms 301 & 302 Renovation
Contractor to furnish labor and materials to renovate rooms 301 and 302 of the Little Library
Lexington, KY
Roadway Rehabilitation Man O War at Harrodsburg Road
The work entails rehabilitation of four (4) lanes of southbound Man O’ War Boulevard at the intersection of Harrodsburg Road. Work shall consist of excavating approximately 1300 square yards of existing pavement and dense graded aggregate (DGA) base, and then rebuilding with 6” of DGA base and 10” of Portland cement concrete pavement. Work shall also include installation of pre-formed traffic control loops and reestablishment of signal control via the new loops. Additional tasks shall include joint sealing, traffic markings, bituminous transition zones and related work.
Lexington, KY
North Nelson Water District US 31E Waterline Relocation Phase 2
This contract consists of approximately 3,960 LF of 8″ waterline, 1,400 LF of 6″ waterline, 3,065 LF of 4″ waterline and 890 LF of 3″ waterline, 28 tie-in connections and all necessary appurtenances. This is a relocation of existing facilities. No rock trenching will be allowed on this project.
North Nelson Water Dist, KY
Garrard County Emergency Operations Center
The Following Bids are Requested:
1 PAVING
2 GENERAL TRADES
3 MASONRY
4 ROOFING
5 ALUMINUM WINDOWS AND STOREFRONTS
6 DRYWALL AND FRAMING, ACOUSTICAL CEILINGS
7 PAINTING / COATINGS
8 FLOORING
9 MECHANICAL
10 ELECTRICAL
11 COMBINATION
Lancaster, KY
Pine Creek, Cram Creek and Pert Creek Phase 2 Water System Improvements
Construct approximately 38,120 feet of 3-inch through 8-inch water main, prefabricated booster pump station, master meter vault, pressure reducing vaults, and related appurtenances.
Letcher Co, KY
Idle Hour Trunk Sewer Replacement
The Project Includes providing all construction, labor, material, tools and test equipment necessary for the construction of 2,287 ft or 21 inch sanitary sewer, 195 ft of 10 inch sanitary sewer, 710 ft of 8 inch sanitary sewer, 34 manholes, and all other necessary appurtenances
Lexington, KY
The Sampson Branch Watershed Project
This project consists of the providing of all materials labor and equipment for the construction of: Furnish and install, complete and ready for service, 505 L.F. of 60″ diameter storm drain under +/- 30 feet of cover. Remove and/or grout approximately 480 L.F. failed 48″ storm drain. Relocate utilities and restore surfaces as necessary. Maintain existing storm drainage throughout construction.
London, KY
Click Here to View
Eagles Nest Pump Station
Contract 12 consists of one (1) above ground water pump station.
Pulaski Co, KY
Fleming 2012 Water Project
Approximately 46,000 LF of 3-inch to 8-inch water line replacement and upgrade, including appurtenances.
Engineer’s Estimate is $900,000
Fleming Co, KY
Harlan Housing Authority Waste Line Replacement
Waste Line Replacement (six-story Apartment Building)
Harlan, KY
Putnam Stadium Locker Rooms
The project scope is to install aluminum grandstand bleachers and press box along with the demolition of the existing stadium structure. The project scope will include electrical and plumbing work, along with concrete foundations for masonry, roofing and railings.
Ashland, KY
Runway 6-24 Crack Repairs and Overlay Project Wendell H Ford Airport
Runway 6-24 Crack Repairs and Overlay Project
Chavies, KY
City of Frankfort Forest Villa Manhole Rehabilitation
The project scope includes the rehabilitation of a manhole and an open cut repair of one of its pipe penetrations along with replacement of the cover of a second manhole with a hatched lid.
Frankfort, KY
City of Frankfort Crestwood I&I Rehabilitation Project
Frankfort, KY