14-163 / 34th Street Area Water Main Replacement Project
14-163 / 34th Street Area Water Main Replacement Project
Louisville Water Company is requesting Bids for Installation of 1,035 +/- linear feet of 12-inch Pressure Class 350 ductile iron water main, 3,355 +/- linear feet of 8-inch Pressure Class 350 ductile iron water main, 685 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main and 285 +/- linear feet of 4-inch Pressure Class 350 ductile iron water main. Also included with the project is the installation of 5 fire hydrants and the transfer, renewal, relocation or discontinue of 126 customer services.
The work to be performed consists of: Caveland Manor Apartments: KY 067-01
A. Window Replacement (Contractor is responsible for installing two sample windows prior to ordering windows).
Oldham County Environmental Authority New Regional Wastewater Treatment Plant
Oldham County Environmental Authority New Regional Wastewater Treatment Plant
Construction of a new 1.25 mgd Wastewater Treatment Plant in Oldham County Kentucky. The Plant processes include headworks , master pump station, 3 Basin-Sequencing Batch Reactors (SBR), wasted sludge storage tank, post equalization tank, effluent pump system and UV disinfection system. The work includes all site work, piping, electrical and control systems as necessary for a complete treatment plant, ready for continuous operations by Oldham County Environmental Authority.
Work of this proposed contract comprises of an interior fit-up to include new finishes such as solid vinyl tile, carpet, lay-in ceiling system , paint, and casework. Replacing HVAC units and new ductwork, new lighting and wiring, new fire protection system. Replace plumbing fixtures.
Lexington Fire Department Restroom Renovation Fire Station 01
Lexington Fire Department Restroom Renovation Fire Station 01
Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, of this document, for the Lexington Fayette County, Kentucky.
Fire Station #1 restroom renovation includes the demolition of the existing restroom with shower and renovation construction for two restrooms with showers on the second floor of the historic fire station. The existing construction is brick veneer on clay tile substrate exterior and bearing walls, wood studs/plaster wall finish, plaster ceiling on wood framing. In general the new finishes will be gypsum board and ceramic tile. DWV piping will extend down to the existing sanitary connection in the basement through a new chase, working with and around the exiting structural system. The new rest rooms will have all new HVAC, plumbing and electrical work. Existing utilities are to be extended to the new location for piping, electric and HVAC.
City of New Albany Flood Control District Improvements
City of New Albany Flood Control District Improvements
Project Description:
Removal of six raised concrete crosswalks and adjacent portions of asphalt pavement.
Removal of a curb ramp and associated concrete sidewalk that accesses greenway.
Construction of five raised asphalt crosswalks and one flush asphalt crosswalk.
Construction of a curb ramp and associated sidewalk that accesses greenway.
Crosswalks will utilize an imprinted aggregate reinforced preformed thermoplastic pavement marking system.
Pavement markings for Water Street, crosswalks and associated parking areas.
Removal and installation of signage.
Using phased construction to retain access to boat ramp.
Raw Water Intake Improvements Winchester Municipal Utilities Contract 77
Raw Water Intake Improvements Winchester Municipal Utilities Contract 77
CONTRACT 77 (587 -11-C-8) Raw Water Intake Improvements shall consist of the following:
The furnishing and installation of a new raw water pump, pump control valve, and associated piping and valves. For a complete list of work items please reference the enclosed Form of Proposal.
Raw And Finished Water Transmission Mains Winchester Municipal Utilities Contract 76
Raw And Finished Water Transmission Mains Winchester Municipal Utilities Contract 76
CONTRACT 76 (587-11-C-7) Raw and Finished Water Transmission Mains shall consist of the followlnq:
The furnishing and installation of approximately 49,825 L.F. of 24-inch ductile iron pipe, approximately 920 L.F. of 36-inch steel cover pipe, bores, and accessories. For a complete list of work items please reference the enclosed Form of Proposal.
Eastern Kentucky University
Estimate:
$52,413,396.00
The project includes construction of a six-story addition to the New Science Building at Eastern Kentucky University. The new Phase 2 wing includes classrooms, teaching laboratories, research laboratories, offices, chemical storage areas, and support spaces totaling approximately 148,058 gross square feet. The first story of the new building will be at-grade, with the sixth floor housing mechanical and electrical equipment only. Sitework includes clearing and site preparation, installation of site utilities, earthwork and excavation, and landscaping work necessary for construction of the new building. The structural system includes drilled piers, spread concrete footings, poured-in-place architectural concrete stair tower and elevator shafts, steel superstructure with sprayed fire-resistive materials, and composite concrete floor slabs on metal decking. Exterior building materials include aluminum curtainwall and storefront framing systems, brick veneer, formed zinc wall panels, and a two-ply SBS-modified membrane roof. Interior materials include polished concrete floors, resinous flooring, carpet tile, ceramic tile, resilient base, painted gypsum board, acoustical ceilings. Specialized building components include one traction service elevator, extensive laboratory casework, and fixed laboratory equipment. The building is fully fire-suppressed, with piped laboratory gases, and includes a variable-air-volume HVAC system. All of the Phase 2 building systems are fed from the central systems in the Phase 1 building. The project also includes installation of an additional chiller in the Phase 1 mechanical room, fit up of approximately 6,575 gross square feet of laboratory space on the first floor of the Phase 1 building, and construction of a new stand-alone one-story greenhouse of approximately 3,806 gross square feet. The project includes five allowances for specialized systems, and one additive alternate for the packaged greenhouse.
Blue Sky Pumping Station And Force Main Contract 3
Blue Sky Pumping Station And Force Main Contract 3
Consisting of the construction and/or furnishing of items as listed in the Bid Schedule, Part III, Form of Proposal , of this document, for Blue Sky Pumping Station and Force Main, Contract 3 Wastewater Treatment Plant Closure, Lexington-Fayette Urban County Government, Lexington Fayette County, Kentucky.
Ashland National Guard Armory
Estimate:
$492,983.00
The project consists of the numerous façade improvements at the Ashland National Guard Armory. The building was constructed in approximately 1947. Approximately three years ago, the South wall of the building was stabilized and the (3) exterior walls of Drill Hall were repaired by replacing cracked brick and adding masonry expansion joints. This project will include tuck pointing, brick replacement, concrete wall parge coating, and the addition of masonry expansion joints for the remaining North half of the building. In addition, the exterior façade of the entire building will be cleaned and sealed. Minor exterior concrete patching is also included.
Kentucky School for the Blind
Estimate:
$ 45,000.00
D. The Work consists of furnishing and installing door security improvements for the following buildings:
1. Langan Gym
2. Richie Building
3. The Student Center
4. Food Service Building (Alternate 1)
5. Classroom/Library
The existing “Kantech” door access system is to remain and all additions and modifications are to utilize the “Kantech” access system. Contractor must be certified for “Kantech Corporate Addition”.
Alternate 1 includes all work associated with the Food Service Building.
Project consists of replacement of HVAC pneumatic and electronic controls for existing air handler and VAV boxes with new DDC control system including, graphics, programming, air flow monitors, actuators, sensors, valves, etc., as needed to meet the sequence of operations.
Demolition items and Interior renovations to include gyp board walls and plaster repair ; wall coverings and general plaster wall restoration ; interior painting; interior wood trims ; new doors and frames ; Acoustic Ceilings ; new and restoration of metals Ceilings ; carpet and VCT tile ; stair treads ; custom cabinetry wood working. Min or mechanical system repair/duct cleaning ; General electrical modifications additions ; new electrical fixtures replacements; aluminum store front windows and entry door with glazing. Window treatments throughout the building; Exterior painting and exterior repairs to clocktower louvers and building soffits. General caulking and cleaning of the exterior windows .
Breathitt County Area Technical Center Roof Replacement
Breathitt County Area Technical Center Roof Replacement
Removal of existing built-up roofing and rigid insulation down to cementitious wood-fiber (Tectum) roof deck. The new roof shall consist of new roof insulation , PVC roof membrane, wood blocking , metal trim, gutters and downspouts. Roof area is approximately 13,200 square feet.
3282 Roadway Maintenance and Improvements Contract
3282 Roadway Maintenance and Improvements Contract
A price contract for a portion of Louisville Metro Government’s need for the Roadway Maintenance & Improvements Contract for a period of twelve (12) months.
Hopkinsville Water Environment Authority (HWEA) 12″ Natural Gas Main Extension REBID
Hopkinsville Water Environment Authority (HWEA) 12″ Natural Gas Main Extension REBID
Project includes the furnishing and installation of all materials, equipment, labor and incidentals required for the construction of: Tasks A, B, C, and D consisting of 34,600 linear feet of 4″ to 12″ diameter HDPE natural gas lines and associated appurtenances.