RFB-88-15 Roof Replacement Harlan Appalachian Youth Challeng

Department of Military Affairs
Estimate:
$302,605.00
The project consists of the demolition of existing ballasted and un ballasted EPDM roof including existing above deck insulation. The new roof installation will be a new two ply modified bitumen roof. New roof system shall include rigid board insulation above the roof deck. Existing metal flashings will be removed then replaced. Portions of existing metal siding will be removed and replaced. New parapet coping will be included in ares to receive new roof and in soom areas of the existing roof which are to remain

Grays Knob, Kentucky

click here to order

RFB-87-15 Women’s Dormitory Restroom Upgrade (Tower III)

Carl D. Perkins Center
Estimate:
$396,996.00
The project includes the renovation of the five existing bathrooms located on the 1st and 2nd floors of the residential building. The scope of work for this current construction project includes but is not limited to: selective demolition, removal and replacement of plumbing systems, replacement of existing light fixtures, concrete slab and metal deck replacement, doors and frames, hardware, interior finishes including tile work (walls, floors and base), drywall and painting, toilet compartments and accessories. The work effort will be executed in the fall/winter 2014/15. The building will be partially occupied during all phases of construction work. In addition there is a sixth existing restroom which will be bid as an alternate.

Thelma, Kentucky

click here to order

RFB-86-15 Kitchen Upgrades Carl D. Perkins

Estimate: $160,000.00

The project includes the renovation of the existing Dish Room located off the Kitchen
on the 1st floor of the facility. The scope of work for this current construction project
includes but is not limited to: selective demolition, removal and replacement of
plumbing systems, replacement of existing light fixtures, coiling shutter doors, interior
finishes drywall, FRP panels and painting, new ceiling tile and grid, and stainless steel
countertops, splashes, trims and surrounds-both new and reworking existing. The
work effort will be executed in the fall/winter 2014/15. The building will be partially
occupied during the construction work.

Thelma, Kentucky

click here to order

Danville Community Arts Center Accessible Ramp and Steps and Parking Lot Upgrades

Danville Community Arts Center Accessible Ramp and Steps and Parking Lot Upgrades

This project provides for the removal of existing concrete steps, concrete walk/curbs and asphalt pavement and construction of a new concrete accessible ramp/steps/rails and new asphalt pavement as shown on drawings and specified.
This project includes one additive alternate to install limestone veneer on the visible walls of the ramps and steps.

Danville, KY

Click Here to View

American Legion Park Pool

American Legion Park Pool

Elizabethtown, KY

Click Here to View

Lexington Fire Station 1 Restroom Renovation REBID

Lexington Fire Station 1 Restroom Renovation REBID

Fire Station #1 restroom renovation includes the demolition of the existing restroom with show and renovation construction for two restrooms with showers on the second floor of the historic fire station. The existing construction is brick veneer on clay tile substrate exterior and bearing walls, wood studs/plaster wall finish, plaster ceiling on wood framing. In general the new finishes will be gypsum board and ceramic tile. DWV piping will extend down to the existing sanitary connection in the basement through a new chase, working with and around the exiting structural system. The new restroom will have all new HVAC, plumbing, and electrical work. Existing utilities are to be extended to the new location for piping, electric, and HVAC.

Lexington, KY

Click Here to View

Meade Activity Center

Meade Activity Center

Project consists of A two story pre-engineered metal building frame with face brick and metal wall panels over steel girts and batt insulation on the metal building frame. The roof consists of metal roof panels over metal purlins, batt insulation and metal liner panel. Interior walls are metal studs and gyp board, including around the elevator shaft.

Brandenburg, Kentucky


Click Here to View

Innovation Launchpad Project

Innovation Launchpad Project

Construction of an approximate 5,500 s.f. renovation of an existing building located at 149 East Main Street, Morehead, Kentucky

Morehead, KY

Click Here to View

Kenova Floodwall Gate Closure Project

Kenova Floodwall Gate Closure Project

This project consists of the providing of all materials, labor, and equipment for the construction of:
Contract I : Permanent Closure of Floodwall Gates #2, # 12, 13, #13A, and # 14
Contract 2: Additive Alternates: Permanent Closure of Floodwall Gates #3, #7, #8, #9, # 10

Kenova, WV

Click Here to View

Scott County Road Department Salt Barn Building

Scott County Road Department Salt Barn Building

The following bids are requested:
1 EARTHWORK
2 GENERAL TRADES
3 COMBINATION

Georgetown, KY

Click Here to View

Louisville City Football Club Locker Room Facility at Slugger Field #3305

Louisville City Football Club Locker Room Facility at Slugger Field #3305

Request for Proposal a contract to provide all labor, materials and other necessary equipment for the Louisville City Football Club Locker Room Facility at Slugger Field.

Louisville, KY

Click Here to Order

Barbour Lane Pump Station Ventilation Upgrade and Odor Control Project

Barbour Lane Pump Station Ventilation Upgrade and Odor Control Project

Barbour Lane pump station is located at 4640 Barbour Lane, Louisville KY 40241. Project includes upgrade of the existing ventilation system to provide 12 air changes/hour and the addition of a carbon adsorber odor control sytem to treat the odorous air from the pump station wet well.

Louisville, KY

Click Here to Order

Campton School Apartments

Campton School Apartments

Scopes of Work:
Electrical
Fire Suppression
Elevator
HVAC

Campton, KY

Click Here to View

2014 Wellfield Improvements Project

2014 Wellfield Improvements Project

Project consists of the cleaning and testing of an existing raw water intake well, the installation of well column and above ground casing and column, elevated platform, pump, motor, motor control, electrical and telemetry systems, lightning protection, pre-cast vault, valves, manhole , and ductile iron waterline.

Campbellsburg, KY

Click Here to View

14-172 / Rehab – 60 Inch RCP — Bluegrass, Hazelwood, and Manslick

14-172 / Rehab – 60 Inch RCP — Bluegrass, Hazelwood, and Manslick

Louisville Water Company is requesting Bids for the supply and installation of 850 Internal Joint Seals, the removal, supply and installation of seven (7) access manholes, and the removal and installation of seven (7) air valves along the interior of approximately 11,000 feet of 60-inch concrete transmission main. Also included with the project is the reremoval, suply and installation of one (1) 12-foot section of 60-inch main and the rehabilitation or installation of new gate valves, air valves, drains, etc. per the attached plans.

Louisville, KY

Click Here to Order

I-75 Frontage Road Waterline And Sanitary Sewer Replacement

I-75 Frontage Road Waterline And Sanitary Sewer Replacement

The primary scope of work includes the installation of approximately 124 feet of 4-inch PVC force main, 2,557 feet of 8-inch, lO-inch, and 12-inch PVC gravity sewer, 721 feet of 12-inch PVC force main, 22 sanitary sewer manholes, 772 feet of 6-inch and 8-inch ductile iron waterline, 4,600 feet of 12-inch and 16-inch ductile iron waterline, various size and lengths of steel casing pipe (open cut and bore and jack), various service reconnections, and related appurtenances.

London, KY

Click Here to View

Walhampton Stormwater Improvement Project

Walhampton Stormwater Improvement Project

The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for Walhampton Stormwater Improvements Project.

Lexington, KY

Click Here to View

New Taylor County Primary Center

New Taylor County Primary Center

The New Taylor County Primary Center project consists ofa 57,461 square feet new construction. The Facility will be two story with ICF Structural Wall System with Brick, Metal Panel Veneer. Floor System will be Concrete Slab on grade and concrete on Metal Deck/Bar Joist. Roof will be low slope PVC Membrane on 6″, poly ISO Insulation / Bar Mechanical System will be VRF sized to accommodate future phases.
The site is located at 1209 East Broadway, Campbellsville, KY 42178

Campbellsville, KY

Click Here to View

2363.0 Academic Science Building Bid Package 05

2363.0 Academic Science Building Bid Package 05

TC05A – Structural, Decking and Misc Fabrications
TC05B – Concrete Flatwork

In general, Bid Package 5 includes the necessary work items required to furnish and install all building structural steel framework including but not necessarily limited to all structural steel shapes, bar joists, joist girders, steel composite floor deck, shear studs, steel roof deck, pan fill stairs, all miscellaneous steel floor edge and floor openings edge material, brick relief angles, all elevator related steel work and all steel embed-in-concrete items. Reinforced concrete floor slabs on metal composite decking and slabs-on-grade in basement and on the first floor including, but not necessarily limited to, vapor barrier, under slab drainage course, steel reinforcing, expansion joints and installation of all required embeds as per the construction documents, and acceptance of existing subgrade condition.

Lexington, KY

Click Here to View

Housing Authority of Irvine

Housing Authority of Irvine

Mountain Crest
Roof Replacement consisting of the following:
Fasica Metal
Gutters and Downspouts
Vinyl Soffit
Roof Vent Replacement

Irvine, KY

Click Here to View

14-159 / 770 Pressure Zone – Bullitt County

14-159 / 770 Pressure Zone – Bullitt County

Louisville Water Company is requesting Bids for the furnishing and installation of 430 +/- linear feet of eight (8)-inch PVC DR 18 water main and 1,650+/- linear feet eight (8)-inch Ductile Iron Pressure Class 350 restrained and non-restrained joint water main. The installation of seven (7) 1” or smaller service PRV’s on Robert Burden Road. Installation of one (1) fire hydrant, and one (1) creek crossing, and restore site.

Louisville, KY

Click Here to Order

New Administration Building – Corbin Manor Apartments

New Administration Building – Corbin Manor Apartments

The project consists of:
Construction of New Administration Building

Corbin, KY

Click Here to View

Elizabethtown Housing Authority Boiler Replacement

Elizabethtown Housing Authority Boiler Replacement

Boiler Replacement at KY54-03 (Huddleson House)

Elizabethtown, KY

Click Here to View

2362.0 Commonwealth Stadium Overhead & Sectional Doors

2362.0 Commonwealth Stadium Overhead & Sectional Doors

Please Note – the Technical Specifications and Plans for this rebid package are the same as the Technical Specifications and Plans for Design Release 3A and 3B. Only the Bid Manual is different.
This scope of work consists of thirty (30) Overhead Doors and one (1) Sectional Door.

Lexington, KY

Click Here to View

Lisa Way Sanitary Sewer Extension

Lisa Way Sanitary Sewer Extension

Furnishing and installation of approximately 515 LF of 8-inch PVC gravity sewer and accessories.

Somerset, KY

Click Here to View