Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-8, Part III, Form of Proposal, of this document, for the Clays Mill Road Improvements, Section 2C Project, Lexington-Fayette County, Kentucky.
Jeffersontown Interceptor Project and Jeffersontown WQTC Decommissioning Project
Jeffersontown Interceptor Project and Jeffersontown WQTC Decommissioning Project
The project will include the installation of approximately 1,303 linear feet of 36-inch sanitary sewer, 45 linear feet of 8-inch sanitary sewer, 80 linear feet of 15-inch sewer, 17 sanitary sewer manholes, approximately 2,140 linear feet of CIPP lining and associated appurtenances. This project also includes the decommissioning of the Jeffersontown Water Quality Treatment Center. The project is generally located in the general area of Jeffersontown, KY.
Mill Creek PS Demolition, and Mill Creek Culvert Gate Removal, and Lees Lane Flood PS Demoliton and Gates 130, 131, 132 Removal
Mill Creek PS Demolition, and Mill Creek Culvert Gate Removal, and Lees Lane Flood PS Demolition and Gates 130, 131, 132 Removal
Demolition of the Mill Creek Flood Pump Station to below grade and the removal of three Mill Creek Culvert sluice gates. Site access from 6730 Elmwood Avenue, Louisville, KY & Demolition of the Lee’s Lane Flood Pump Station and the removal of three sluice gates (Gates 130, 131, & 132). Site access from 6730 Elmwood Avenue, Louisville, KY.
Construction of approximately 3,300 linear feet of 6 inch waterline and the installation of one (1) hydropneumatic pump station. The Contractor shall furnish all materials , equipment and labor necessary to complete the construction of the waterline, appurtenances and reclamation.
This project provides for removal of existing concrete steps, concrete walk/curbs and asphalt pavement and construct ion of a new concrete accessible ramp/steps/rails and new asp halt pavement as shown on drawings and specified. New Indiana Limestone pane ls shall be installed on east side of existing porch where 4 original panels are removed. No other Limestone Cladding required .
Renovate the entire third floor of Blazer Hall for the temporary relocation of Student Center Services offices. Scope also includes renovation of five rooms in the Blazer basement for the Student Center Cat’s Den.
Annual General Maintenance and Repairs for Aquatic Facilities #3314
Annual General Maintenance and Repairs for Aquatic Facilities #3314
A price contract for a portion of Louisville Metro Government’s need for the Annual General Maintenance and Repairs for Aquatic Facilities for a period of twelve (12) months.
This Contract is for the construction and installation of a 1.4 million gallon off-line, cast-in-place concrete, covered, sanitary sewer overflow storage basin including dewatering pumps, 433 linear feet of 21-inch sanitary sewer, 35 linear feet of 12-inch sanitary sewer force main, and all other related appurtenances located at 1910 Charbdin Place, near Blankenbaker Lane and Camargo Road in northeastern Jefferson County.
Construction of a 16.7 Million Gallon below grade reinforced concrete storage basin with twelve flushing gates, wet well with three 100 HP chopper pumps and one 10 HP chopper pump, elevated catwalk, two stairwells, electrical, mechanical, instrumentation and control system, and site work as detailed in the Construction Documents.
Interim Hydraulic Improvements to the Hite Creek WQTC
Interim Hydraulic Improvements to the Hite Creek WQTC
Construction of improvements to the Hite Creek Regional Water Quality Treatment Center to increase the rated peak hourly flow capacity from 16 mgd to 24 mgd. Improvements include connection of force mains from the Harrods Creek Pump Station and the Meadow Stream Pump Station to the Preliminary Treatment Building through magnetic flow meters and a new junction chamber, a new grit removal tank, a new coagulant feed mixing chamber, a new 102 foot diameter secondary clarifier with RAS and scum pumping station, a new effluent Parshall flume metering structure, a new UV disinfection channel, a new cascade aerator and outfall to Hite Creek, a new plant drain and recycle pump station, a new chemical storage and feed building, related site work, electrical, piping and mechanical improvements. The Project is located at the Hite Creek Regional Water Quality treatment Center in northeast Jefferson County.
Rattlesnake Ridge Contract I-1 100,000 Gallon Elevated Water Tank
Rattlesnake Ridge Contract I-1 100,000 Gallon Elevated Water Tank
Contract No. 1-1- 100,000 Gallon Elevated Water Tank a.) 100,000 gallon elevated water tank & appurtenances
b.) Access road and Fencing
c.) Tank Demolition
City of Taylorsville Contract A Waterline Replacement
City of Taylorsville Contract A Waterline Replacement
The project includes but is not limited to the following:
CONTRACT “A” – WATERLINE REPLACMENTS (TOWN HILL, BANK ALLEY, MAIN STREET AND GARRARD STREET)
a.) 3880 L.F. 6″ C900 DRl4 PVC Waterline
b.) 1800 L.F. 1″ CL 200 PVC Service Line
c.) 16 EA 4″/6″ / 8″ Gate
d.) 4 EA Fire Hydrants
e.) 50 EA Relocate and Reconnect Meters
f.) 780 S.Y. Remove and Replace Sidewalk
g.) 130 L.F. Open Cut State Highway w/12″ steel casing & 6″ W.L. and flowable fill