American Legion Park Pool REBID
American Legion Park Pool REBID
Elizabethtown, KY
American Legion Park Pool REBID
Elizabethtown, KY
City of Richmond – Gibson Bay Stream Bank Stabilization Project
The project is a stream bank stabilization project consisting of approximately 490 linear feet of large block gravity retaining wall ranging from 405ft to 9.0ft in height. The project must be completed within thirty (30) days of the notice to proceed.
Richmond, KY
CCK-2011-15 Tobacco Health R & D Center Replace Condensate Line
The project is for the replacement of two sections of condensate piping on the north side of the Tobacco Health R&D Center.
Lexington, KY
2397.0 Football Training Center And Practice Fields Design Release 2
The New Football Training Facility consists of an approximately 100,000 sf addition onto the existing Nutter Field House. This addition will house multiple functions for the University of Kentucky Football Team. In addition, this project will include two new practice fields and associated site improvements. A list of trade contracts for this work is listed below.
Design Release #2 Trade Contracts (CCK-2004-5) shall include:
02A – Building Concrete
02B – Steel
02C – Conveying Equipment
Lexington, KY
15-27 / Cherry Grove Grid Tie
Louisville Water Company is requesting Bids for furnish and install 470 +/- LF of 6-inch ductile iron PC350 water main, and 125 +/- LF of 6-inch restrained joint ductile iron PC350 water main, including one creek corssing and (1) one fire hydrant. Significant clearing will be required.
Louisville, KY
15-09 / Broadway Area Water Main Replacement Project
Louisville Water Company is requesting Bids for the installation of 5,860 +/- linear feet of eight (8)-inch Pressure Class 350 ductile iron water main and 400 +/- linear feet of six (6)-inch Pressure Class 350 ductile iron water main. Also included with the project is the installation of 13 fire hydrants and the transfer, renewal, relocation or discontinue of 92 customer services.
Louisville, KY
15-21 / 1st Street Area Lead Service Renewals
Louisville Water Company is requesting Bids for renewal of lead services on 1st Street, Ormsby Avenue and Hill Bend Place. Design information indicates a total of 74 customer service renewals, 6 customer service discontinues, and 14 meter exchanges.
Louisville, KY
Main Lobby of City Hall Annex Building #3370
A contract for the Renovation of the Main Lobby of City Hall Annex Building.
Louisville, KY
Central Park Pargola Repairs #3368
A Price Contract for a portion of Louisville Metro Government’s need for Central Park Pergola Repairs for a twelve (12) month period.
Louisville, KY
Franklin County Cooperative Extension Service Office Building Renovations and Addition
Project Description:
The Franklin County Cooperative Extension Service Office is an existing two level building consisting of a first floor and basement. This project contains the following work:
– 145 square foot addition to the first floor main entrance
– 55 square foot addition to the basement main entrance
– Canopy additions to first floor and basement main entrances
– Interior office renovation
The Work includes, but is not limited to, demolition, earthwork, termite control, asphalt paving, concrete work, unit masonry assemblies, rough carpentry, interior architectural woodwork, building insulation, exterior insulation and finish systems, asphalt shingles, sheet metal flashing and trim, firestopping, joint sealants, standard steel doors and frames, pre-hung wood doors and frames, folding doors, aluminum entrances and storefronts, door hardware, glazing, gypsum board assemblies, resilient floor tile, ceramic tile, carpet, acoustical wall panels, painting, cast signs, louvers and vents, electrical (power, communication, and lighting) systems, clean-up and removal of construction debris.
Frankfort, KY
CCK-2009-15 North Farm Forage Greenhouse
Contractor to furnish labor and material to construct the Forage Greenhouse on the North Farm.
Lexington, KY
CCK-2010-15 Lafferty Hall Tuckpointing 2015
Project Includes:
1. Tuckpointing of failed masonry head and bed joints all elevations 2. Replacement of mismatched mortar
3. Replacement of all damaged and cracked brick
4. Removal and reconstruction of the east planter walls (north and east elevations), installing hydraulic pressure control (wall drainage), and possibly including foundations (see unit prices)
5. Repairs and tuckpointing of the front entrance posts, and seating area (see drawings for elements that are excluded)
6. Removal and reconstruction of the east elevation of the front seat wall
7. Repairs and tuckpointing to the side entrance seating area and light posts
8. Re-caulking of all existing caulking joints on building (includes window and door preimeters)
9. Final cleaning and waterproofing of the building exterior
Lexington, KY
Louisville Metro Government’s need for Professional Boiler Services #3367
A price contract for a portion of Louisville Metro Government’s need for Professional Boiler Services for a twelve (12) month period.
Louisville, KY
Boyle County Middle School Renovation Phase III
The Work includes gymnasium HVAC renovation , partial re-roof (Polyurethane foam) , door and window replacement and Art Room renovation .
Danville, KY
CCK-2008-15 Good Samaritan Hospital Elevator A/B Refurbishment
The work includes but is not limited to the refurbishment of elevator A/B in Good Samaritan Hospital.
Lexington, KY
2402.1 PAV A 9th and 10th Floors BP03 Miscellaneous Steel
TC-015 – Miscellaneous Steel
Lexington, KY
Louisville Metro Government’s need for Professional HVAC Services for a period of twelve (12) months #3365
A price contract for a portion of Louisville Metro Government’s need for Professional HVAC
Services for a twelve (12) month period, per the departmental specifications,
Louisville, KY
CCK-2006-15 Feltner 4H Camp Cabin Interior Finishes
Contractor to furnish labor and material to finish the interior of a cabin at Feltner 4H Camp, London, KY
London, KY
West Shelby Water District 2015 Upgrades
This contract consists of approximately 4,700 L.F. of 6″ PVC, SDR-17 waterline, 71 service reconnections, 850 L.F. of free bore and appurtenances. This contract contains an additive alternate that may be included with the base project if funding permits. Additional time will be given for said alternate.
The Engineers Estimate for the project is $265,000 for the Base Project and $40,000 for Additive Alternate No.1.
Simpsonville, KY
East Clark County Water District – Ecton Road and Little Stoner Road Water Line Upgrade
CONTRACT 415 -14 -01 Ecton Road and Little Stoner Road Water Line Upgrade shall consist of the following :
The upgrade of approximately 11 ,850 L.F. of existing 6-inch and 3-inch PVC pipe to 8-inch and 6-inch C-900 PVC pipe, approximately 220 L.F. of 18-inch bore under Mountain Parkway, and accessories .
East Clark Co Water District, KY
Star Elementary School Renovation & Addition
Work includes renovation and addition to the Star Elementary School. Bids will be opened and read aloud.
Grayson, Kentucky
CCK-2005-15 Spindletop Hall Family Pool Renovation
This project is to coordinate with UK’s Unit Price Contractors for Electrical and Concrete to renovate the existing Family Pool at Spindletop Hall. The existing pool walls, floor, gutters etc. will remain (demolition of the existing shallow end steps will be included in this bid) and the deep end will be fill with stone to create a new concrete pool bottom, new stainless steel walls (including all required buttressing and support to be designed by pool contractor) and stainless steel gutter system including all new piping for features and standard supply and returns . All water feature piping is to be included in the base bid pricing and the water features will be listed in the Alternate Bid pricing on the bid form. As part of this work the under slab bonding grid will be provided and installed by the contractor and bonded/inspected by the electrical contractor and State Electrical Inspector and must be coordinated by the pool contractor prior to concrete being placed.
Lexington, KY
Electric Meter Center Replacement at Riverside Terrace – New Albany Housing Authority
Electric Meter Center Replacement
New Albany, IN
Floyd County Housing Authority – 51014 Modernization
Kitchen Cabinets & Vinyl Tile Flooring
Minnie, KY