Uncategorized

RFB-163-15 Wayland Stream Restoration Ph 1

AML Reclamation Project
Estimate:
$220,000.00
The project will consist of removing existing failing gabions along Steele Creek, construction of a concrete gravity wall for stream bank stabilization, installation of a sheet piling wall and sediment removal.

Floyd County

click here to order

RFB-162-15 Pleasant Run-Homestead Wetlands

AMD Abatement Project
Estimate:
$246,553.75
The proposed project (approximately 0.8 acres total) consist of replacing a gabion wall which has deteriorated and fallen into and impeded flow in Pond Creek with non-reinforced concrete block wall with leveling pad. The site is located on KY Hwy. 199 (Pond Creek Road) between the communities of Pinsonfork and McVeigh. Traveling from the Pikeville area, it can be reached following Hwy. 119 to a right turn onto Hwy. 199 and proceeding about 5.8 miles (the highway name will become interchangeable with Pond Creek Road) to the residence on the right (4733 Pond Creek Road). A waste area, approximately 5 acres in size, only part of which is anticipated to be used, is available just off of Hwy. 119, about one mile west of the community of Huddy at 37° 35’ 56.7” N; 82° 17’ 40.2” W. Materials resulting from any tree cutting are not to be placed in the waste area, but are to be chipped on site or otherwise disposed of per the property owner’s wishes. Additional roadway stone is included to maintain access to the waste area.
Two portions of deteriorating gabion adjoining an existing free-standing concrete wall behind the Daniels residence will be replaced with non-reinforced wall, and a length of sheet piling wall is included to hold up additional stream bank (currently supported by lengths of wood) as shown in the plans. A third and longer section of deteriorating gabion, part of which has collapsed into Pond Creek, will also be replaced with non-reinforced concrete block wall. Failed or failing gabions are to be removed, although class II stone rendered may be used on site. A wooden walking bridge behind the Daniels residence accessing across Pond Creek is to be replaced in-kind.
A hazardous portal located roughly 400 feet northwest of the Daniels residence (37° 32’ 39.6” N; 82° 15’ 39.2” W) is to be closed with wildlife access.

Hopkins, Kentucky

Click here to order

Madison County Area Technology Center Roof Replacement

Madison County Area Technology Center Roof Replacement

Removal of approximately 25,000 SF (amount to be verified by the Contractor) of existing roofing down to existing roof deck and replacement with a new modified bitumen roofing system including all insulation, flashing, metal roof edging, gutters, downspouts, coping, etc.

Richmond, KY

Click Here to View

Garrison-Quincy Water District – Well Project

Garrison-Quincy Water District – Well Project

Contract II – Well Project
A 200 gpm gravel packed well, test well, well pump, associated piping, raw water line and site work, electrical and all appurtenances as shown on the plans and specifications, complete in place.

Garrison, KY

Click Here to View

Garrison-Quincy Water District – Water Treatment Plant Improvements

Garrison-Quincy Water District – Water Treatment Plant Improvements

Contract I – WTP Improvements Project

Water Treatment Plant Improvements shall include but not limited to furnishing and installation of all equipment, labor and equipment necessary to complete the project. This shall include all required demolition of existing items, installation of two (2) vertical pressure filters, air wash blower, piping, valves, controls, meters, electrical, dehumidifier, provide electric to proposed Well #6, excavation, seeding, strawing etc. as shown on the plans and described in the specifications, complete in place.

Garrison, KY

Click Here to View

Elizabethtown Regional Airport – Construct T-Hangar Addington Field

Elizabethtown Regional Airport – Construct T-Hangar Addington Field

This project consists of the construction of an 11,650 S.F. T-Hangar building with concrete floor, lighting and concrete apron.

Elizabethtown, KY

Click Here to View

Green River Valley Water District Contract # 1

Green River Valley Water District Contract # 1

Contract consists of the installation of a 1,000 KW Emergency Generator at the District’s Water Treatment Plant. The project includes transfer switches, disconnects, and wiring to power the treatment plant and two high service pump stations.

Munfordville, KY

Click Here to View

LFUCG Wolf Run Wet Weather Storage Facility

LFUCG Wolf Run Wet Weather Storage Facility

Providing all construction supervision, labor, materials, tools, test equipment necessary for the construction of a 1.8 million gallon wastewater storage tank, a diversion structure, a 7.3 million gallon a day wet weather pump station and valve vault, a discharge valve vault, and the installation of approximately 250 linear feet of sanitary sewer line. The project will also consist of all site and electrical work.

Lexington, KY

Click Here to View

Mill Creek Pump Station Demolition Plan and Lees Lane Flood Pump Station Demolition Plan

Mill Creek Pump Station Demolition Plan and Lees Lane Flood Pump Station Demolition Plan

Demolition of the Mill Creek Flood Pump Station to below grade and the removal of three Mill Creek Culvert sluice gates. Site access from 6730 Elmwood Avenue, Louisville, KY. Demolition of the Lee’s Lane Flood Pump Station and the removal of three sluice gates (Gates 130, 131, & 132). Site access from 6730 Elmwood Avenue, Louisville, KY.

Louisville, KY

Click Here to Order

15-34 / 900 Plan-Lake Forest Parkway 16″ Water Main Installation Project

15-34 / 900 Plan-Lake Forest Parkway 16″ Water Main Installation Project

Louisville Water Company is requesting Bids for the furnish and installation of 35± linear feet of 8-inch Pressure Class 350 ductile iron water main, 15± linear feet of 12-inch Pressure Class 350 ductile iron water main, and 1,565± linear feet of 16-inch Pressure Class 350 ductile iron water main utilizing traditional trench installation techniques. Also included is the opening and closing of a few valves, the replacement of 1,525± linear feet of 5-ft wide concrete sidewalk with a new 6-ft wide concrete sidewalk, and the resurfacing of one (1) street intersection with the restoration of all sites to pre-construction conditions following work.

Louisville, KY

Click Here to Order>

15-31 Beech Grove Road South Grid-Tie

15-31 Beech Grove Road South Grid-Tie

Louisville Water Company is requesting Bids for the furnishing and installation by bore and jack method, 140+/- lineal feet of 30-inch steel casing pipe and 290 +/- lineal feet of 16-inch Pressure Class 350 ductile iron water main and appurtenances. Restoration of the site and all of the above made ready for use in accordance and compliance with the contract documents.

Click Here to Order

15-13 / Harrods Creek Area Water Main Replacement

15-13 / Harrods Creek Area Water Main Replacement

Louisville Water Company is requesting Bids for Installation of 370 +/- linear feet of 8-inch Pressure Class 350 ductile iron water main, 2130 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main, 790 +/- linear feet of 4-inch Pressure Class 350 ductile iron water main, and the bore and installation of 45 +/- linear feet of 12-inch steel casing pipe. Also included with the project is the installation of 4 fire hydrants, the installation of 1 customer service, the transfer, renewal, relocation or discontinue of 25 customer services, and 1 meter exchange.

Louisville, KY

Click Here to Order

HVAC Temp Control System Upgrade at the Youth Detention Center #3388

HVAC Temp Control System Upgrade at the Youth Detention Center #3388

To furnish all labor, material and necessary equipment to upgrade the HVAC Temp Control System at the Youth Detention Center.

Louisville, KY

Click Here to Order

KY 1448 East Maple Leaf Water And Sewer Line Relocation

KY 1448 East Maple Leaf Water And Sewer Line Relocation

Installation of approximately 1,070 feet of 16″ PVC SDR-21, 9,542 feet 10″ PVC SDR21, 3,015 feet of 6″ PVC SDR 21 waterlines; 1,055 feet of 8″ gravity sewer, 2,044 feet of 3″ PVC SDR-21 force main, steel casing pipe (bore and jack) , 7 manholes, connections to existing waterlines and sewer lines, and various valves and appurtenances.

Maysville, KY

Click Here to View

H. L. Disney New Classroom Building

H. L. Disney New Classroom Building

Alliance Corporation is soliciting Subcontractor and Material proposals on this project, excluding the metal building.

Prestonsburg, Kentucky

Click Here to View

Fulton Airport – Construct 10 Unit T-Hangar

Fulton Airport – Construct 10 Unit T-Hangar

Construct 10 Unit T-Hangar

Fulton, KY

Click Here to View

City of Booneville – KY 30 Waterline Replacement

City of Booneville – KY 30 Waterline Replacement

Work is to include installation of approximately 4,500 LF of 6-inch waterline. Flushing hydrants, (2) pressure reducing valves and a highway bore and jack.

Booneville, KY

Click Here to View

Northern Madison County Sanitation District Muddy Creek Force Main Installation

Northern Madison County Sanitation District Muddy Creek Force Main Installation

Muddy Creek Force Main Installation, Project KY 52

Richmond, KY

Click Here to View

CVC Louisville

CVC Louisville

Project consists of an existing one-story building used formerly as a restaurant renovated for use as a cooking business. Renovation includes complete rework of the building interior including walls and finishes, new restrooms, and new fire protection, plumbing, HVAC, and electrical. Building exterior renovation includes new exterior wall facings and entrance canopy and a limited scope of sitework.
Construction Contract: Bids will be received for the following work.
1. General Trades (all trades)

Louisville, KY

Click Here to View

City of Danville – Weisiger Park REBID

City of Danville – Weisiger Park REBID

Construction includes but is not limited to demolition, grading, site utilities, concrete paving, site lighting, a decorative fountain, brick masonry, steel railings, pedestrian lighting, sod, seed and landscape planting.

Danville, KY

Click Here to View

Bourbon County Senior Citizens Center

Bourbon County Senior Citizens Center

Construction of the Bourbon County Senior Citizens Center

Paris, KY

Click Here to View

Cumberland Falls Highway Water District

Cumberland Falls Highway Water District

This contract consists of approximately 18,000 L.F. of 12-inch transmission main, one underground booster pump station , one Solenoid Valve and appurtenances.

Corbin, KY

Click Here to View

Boyd County High School Bleacher Replacement

Boyd County High School Bleacher Replacement

Project consists of removal and replacement of existing outdoor bleachers at the existing high school. Note, Owner is providing removal of existing materials and haul of offsite.

Ashland, KY

Click Here to View

Jacobs Creek Interceptor Phase II

Jacobs Creek Interceptor Phase II

The project consists of constructing approximately 3,479 feet of 18 to 24-inch diameter gravity sanitary sewer and all appurtenant work.

New Albany, IN

Click Here to View

Maxwell Elementary School HVAC Replacement And Minor Renovation

Maxwell Elementary School HVAC Replacement And Minor Renovation

This work includes replacing 43 heat pump units located above corridor and classroom ceilings including hose kits, bypass pipes and startup. This replacement includes labor to install piping, ductwork, connections, controls rework, and electrical disconnecting and reconnecting. In order to access the heat pumps above the ceilings , in each room or corridor where a heat pump is to be removed and replaced, a portion of the existing ceiling grid will need to be removed to access the required MEP work, and new ceiling grid will need to be installed in those locations. All ceiling tiles in rooms or corridors where heat pumps are to be replaced, or as shown on the drawings are to be removed and replaced with new. An alternate will be included to replace all ceiling grid in rooms or corridors where heat pump units are to be removed and replaced.

Lexington, KY

Click Here to View