City of St Matthews – Washburn Quiet Zone Improvements
City of St Matthews – Washburn Quiet Zone Improvements
The project provides for all labor, materials, and equipment necessary to provide roadway improvements to Washburn Ave in order to establish a Quiet Zone in compliance with Federa l Railroad Administration (FRA) regulations. CSX will concurrently repair the railroad approach slabs.
CCK-2038-15 McVey Hall Undergraduate Space Renovation
CCK-2038-15 McVey Hall Undergraduate Space Renovation
This project is for the renovation of 28 undergraduate spaces, on the first and second floors in McVey Hall. The spaces occupied by the Undergraduate Services will receive new interior finishes, doors, blinds, lighting, and fire alarm systems. Some spaces will receive a drop acoustical ceiling and minor space reconfigurations will be made to other spaces to accommodate the Undergraduate Service’s needs. A student lounge is also included in this design package and includes new finishes and a wall mounted TV. The UK preferred schedule of operations is that the first floor will be completed prior to any work commencing on the second floor.
Corbin Independent Schools – Corbin Middle School Entrance
Corbin Independent Schools – Corbin Middle School Entrance
Project consists of construction of a new entrance road to the existing school. The roadway construction includes installation of a culvert to cross a stream and relocations of utilities.
1. Project cost range is anticipated to be under $645,000.
CCK-2035-15 Repair/Upgrade/Improve Civil/Site Infrastructure – Scott Street Parking Lot
CCK-2035-15 Repair/Upgrade/Improve Civil/Site Infrastructure – Scott Street Parking Lot
Proposed construction activities include demolition of the Reynolds Warehouse No.3 buildings and three residential structures and installation of a 224 space parking lot with storm sewer, lighting, video surveillance , and site grading. This project is located at 313-347 Scott Street, Lexington , Kentucky 40508. The total area disturbed by the proposed construction activities is approximately 2 acres.
The project includes site concrete, utilities and general trades as required to provide and construct a new 2,016 SF greenhouse for the Washington County High School.
Mount Sterling Water And Sewer – Waterline Project North Maysville Street Phase 3
Mount Sterling Water And Sewer – Waterline Project North Maysville Street Phase 3
This project consists of approximately 1,600 linear feet of 8″ water main, minimal quantities of 4 and 6 inch, services along with related accessories.
CCK-2036-15 Frazee Hall Counseling Center Office Renovation
CCK-2036-15 Frazee Hall Counseling Center Office Renovation
This project is for the renovation of the first and second floor counseling offices at Frazee Hall. The first floor offices will have a waiting area, a storage rooms and offices with registration windows. The second floor will have a waiting area and three offices, two for student use and one for counseling. The walls for this area will be soundproof. All spaces will receive new carpet tile, Vinyl wall base, paint and new drop ceilings. Construction will be performed in two phases – Phase 1: Rooms 106 through 106C (must be completed before construction of Phase 2 can begin) and Phase 2: Rooms 201 through 201C.
Housing Authority of Berea – Capital Fund Program KY36P090501 – 14 & 15
Housing Authority of Berea – Capital Fund Program KY36P090501 – 14 & 15
The work to be performed consists of:
Base Bid: Site KY090-001 (143/145,164/166,168/170 Morgan S1.)
A. Shingle Roof Replacement Bid Alternates 1 & 2: Site KY090-001 (127/129 and 135 Morgan S1.)
A. Shingle Roof Replacement
Work includes providing all items, articles, materials, operations or methods herein listed, mentioned or scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and incidentals as necessary for their completion.
This project is for the renovation of rooms 304, 305, 306, 307, and 308 and includes abatement and installation of new flooring in the corridor of Erikson Hall. These rooms will be updated to have new floor, wall, and ceiling finishes, new electrical and data, HVAC and furniture. The new configuration will consist of three classrooms and five offices.
This project renovates the restrooms on floors 1 through 3 of Bradley hall. These renovations are primarily for upgrades to meet the current ADA and Kentucky code standards and to provide the students and staff with improved facilities. The restroom renovations on the main and second floors are the base bid and the third floor will be bid as an alternate #1. The first floor will become a female-only restroom and the second floor will become male-only. The third floor restroom will be a female restroom. The work will include; demolition, reconfiguration, new fixtures, accessories, and finishes. The shower area on each floor will be converted into a janitor/storage closet. In addition, one existing valve is being replaced on the domestic water main and one new valve is being installed on the water line to Kinkead and Breckinridge halls.
CEMCS Remediation Frankfort Locations
This project is for providing electrical meters and associated components in select existing electrical switchgear, panels, and disconnect switch locations.
Ashland Independent Schools will receive bids to furnish all labor and materials to complete the: Ashland Independent Schools – Alumni Gymnasium Exterior Restoration
Estill County High School Partial Interior Renovation – Bid Package 2: Bleacher Replacement
Estill County High School Partial Interior Renovation – Bid Package 2: Bleacher Replacement
This project includes replacement of all bleachers in the High School gymnasium. It also includes scoreboards, divider curtains and replacement of two stairs for added egress.
The project scope includes Multi-phased renovation project of the existing high school. Major work includes technology upgrades , restroom and locker room renovations, ceiling replacement, secure entry vestibule , door and bleacher replacement, and locker alcove upgrades.
Consisting of the items as listed in the Bid Schedule beginning on page P-6, Part 1lI, Form of Proposal, of this document, for the Carver Center Restroom Renovation, 522 Patterson St., Lexington-Fayette County, Kentucky.
Ballard Wildlife Management Area Office
Estimate:
$241,294.00
This project, KDFWR Ballard County Office Complex, located at Wildlife Lodge Road, LaCenter, Kentucky in Ballard County, shall generally consist of the new construction of an approximate 2,330 square feet office building with living quarters. The proposed facility is an elevated one story wood framed structure with Pre-engineered wood truss roof framing and a combination of isolated masonry piers and continuous foundation walls atop reinforced concrete slab/grade beams and footings. The project includes all associated Mechanical, Electrical and Plumbing elements such as primary services, fixtures/devices, equipment and all related appurtenances. The project site is being reclaimed from a previously razed structure and shall include certain site improvements such as minor earthwork, select removal, and alterations.
Green River Correctional Complex
Estimate:
$198,500.00
This project consists of installing a new generator and automatic transfer switch (ATS) to provide emergency back-up power to an existing motor control center. This project also includes disconnecting the emergency feed to an existing ATS and re-feeding the ATS from the new emergency generator. This project will include testing and commissioning of the new generator and ATS prior to moving of existing loads to the generator. This project will include final testing of the new generator and all ATSs after the generator & ATSs installation has been completed and is feeding the existing loads.
Madison County Schools – Foley and Silver Creek Additions and Renovations
Madison County Schools – Foley and Silver Creek Additions and Renovations
Furnishing of all labor, materials, equipment and services for the following bid packages,
Bid Package #1 Foley Middle School Renovation and Additions
Bid Package #2 Silver Creek Elementary School Renovation
Bid Package #3 Combined Bid; Foley Middle School Renovation and Additions, And Silver Creek Elementary School Renovation
Estimate is $7,000,000 for bid package # 1, $3,500,000 for bid package #2, $10,500,000 for combined bid.