Housing Authority of Berea – Capital Fund Program KY36P090501 – 14 & 15
Housing Authority of Berea – Capital Fund Program KY36P090501 – 14 & 15
The work to be performed consists of:
Base Bid: Site KY090-001 (143/145,164/166,168/170 Morgan S1.)
A. Shingle Roof Replacement Bid Alternates 1 & 2: Site KY090-001 (127/129 and 135 Morgan S1.)
A. Shingle Roof Replacement
Work includes providing all items, articles, materials, operations or methods herein listed, mentioned or scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and incidentals as necessary for their completion.
This project is for the renovation of rooms 304, 305, 306, 307, and 308 and includes abatement and installation of new flooring in the corridor of Erikson Hall. These rooms will be updated to have new floor, wall, and ceiling finishes, new electrical and data, HVAC and furniture. The new configuration will consist of three classrooms and five offices.
This project renovates the restrooms on floors 1 through 3 of Bradley hall. These renovations are primarily for upgrades to meet the current ADA and Kentucky code standards and to provide the students and staff with improved facilities. The restroom renovations on the main and second floors are the base bid and the third floor will be bid as an alternate #1. The first floor will become a female-only restroom and the second floor will become male-only. The third floor restroom will be a female restroom. The work will include; demolition, reconfiguration, new fixtures, accessories, and finishes. The shower area on each floor will be converted into a janitor/storage closet. In addition, one existing valve is being replaced on the domestic water main and one new valve is being installed on the water line to Kinkead and Breckinridge halls.
CEMCS Remediation Frankfort Locations
This project is for providing electrical meters and associated components in select existing electrical switchgear, panels, and disconnect switch locations.
Ashland Independent Schools will receive bids to furnish all labor and materials to complete the: Ashland Independent Schools – Alumni Gymnasium Exterior Restoration
Estill County High School Partial Interior Renovation – Bid Package 2: Bleacher Replacement
Estill County High School Partial Interior Renovation – Bid Package 2: Bleacher Replacement
This project includes replacement of all bleachers in the High School gymnasium. It also includes scoreboards, divider curtains and replacement of two stairs for added egress.
The project scope includes Multi-phased renovation project of the existing high school. Major work includes technology upgrades , restroom and locker room renovations, ceiling replacement, secure entry vestibule , door and bleacher replacement, and locker alcove upgrades.
Consisting of the items as listed in the Bid Schedule beginning on page P-6, Part 1lI, Form of Proposal, of this document, for the Carver Center Restroom Renovation, 522 Patterson St., Lexington-Fayette County, Kentucky.
Ballard Wildlife Management Area Office
Estimate:
$241,294.00
This project, KDFWR Ballard County Office Complex, located at Wildlife Lodge Road, LaCenter, Kentucky in Ballard County, shall generally consist of the new construction of an approximate 2,330 square feet office building with living quarters. The proposed facility is an elevated one story wood framed structure with Pre-engineered wood truss roof framing and a combination of isolated masonry piers and continuous foundation walls atop reinforced concrete slab/grade beams and footings. The project includes all associated Mechanical, Electrical and Plumbing elements such as primary services, fixtures/devices, equipment and all related appurtenances. The project site is being reclaimed from a previously razed structure and shall include certain site improvements such as minor earthwork, select removal, and alterations.
Green River Correctional Complex
Estimate:
$198,500.00
This project consists of installing a new generator and automatic transfer switch (ATS) to provide emergency back-up power to an existing motor control center. This project also includes disconnecting the emergency feed to an existing ATS and re-feeding the ATS from the new emergency generator. This project will include testing and commissioning of the new generator and ATS prior to moving of existing loads to the generator. This project will include final testing of the new generator and all ATSs after the generator & ATSs installation has been completed and is feeding the existing loads.
Madison County Schools – Foley and Silver Creek Additions and Renovations
Madison County Schools – Foley and Silver Creek Additions and Renovations
Furnishing of all labor, materials, equipment and services for the following bid packages,
Bid Package #1 Foley Middle School Renovation and Additions
Bid Package #2 Silver Creek Elementary School Renovation
Bid Package #3 Combined Bid; Foley Middle School Renovation and Additions, And Silver Creek Elementary School Renovation
Estimate is $7,000,000 for bid package # 1, $3,500,000 for bid package #2, $10,500,000 for combined bid.
Project consists of: The furnishing of all labor, materials , supplies, tools, equipment, services , etc., necessary for the construction of the Pulaski County Athletic Improvements, for three bid packages listed below:
Bid Package No. I: Pulaski County High School Football Field Synthetic Turf Installation
Bid Package No.2: Southwestern High School Football Field Synthetic Turf Installation
Bid Package No.3: Combined Bid Package – Pulaski County & Southwestern High Schools
This project includes the removal and replacement of the front covered porch, replacement and adding of first floor windows, addition of the thru-wall mechanical unit, lighting upgrades and added patio with fencing.
2382.0 Repair/Upgrade/Improve Mechanical Systems Old Fine Arts Building Phase 2
2382.0 Repair/Upgrade/Improve Mechanical Systems Old Fine Arts Building Phase 2
This is the second phase of a project to replace and upgrade major mechanical systems in the Fine Arts Building which includes replacement/upgrade of the air handling units and associated temperature controls, exhaust fans and reheat coils. This phase of the project includes replacement exhaust fans EF-2 (and relabeling as EF-9) which serves the 3rd floor restrooms, E-4, E-5, removing E-7 but not replacing, and adding EF-8. It also includes replacing the air handling units serving the Tuska Gallery (S-5) and Guignol Theater (S-4); it also includes replacing additional reheat coils and sprinkling the building.
Mountain Comprehensive Health Corporation – Whitesburg Clinic Renovation
Mountain Comprehensive Health Corporation – Whitesburg Clinic Renovation
Mechanical and electrical work for the renovation of the Whitesburg Clinic, located at 226 Medical Plaza Lane, Whitesburg, KY, which contains approximately 8,000 gross square feet.
15-59 690 Plan- Forest Hill Hydro-Booster Pumping Station Renovation
15-59 690 Plan- Forest Hill Hydro-Booster Pumping Station Renovation
Louisville Water Company is requesting bids for the Renovation of an existing underground hydro-booster pumping station including pump and motor replacement, electrical and control work, site work, meter prv work, EPSC, and restoration.
McLean County Schools Central Office – Maintenance And Central Storage Fit-Up
McLean County Schools Central Office – Maintenance And Central Storage Fit-Up
Renovations to provide for new Central Office facility, new Central Storage space and new space for District Maintenance staff. Work to include demolition of existing interior fit-up and new construction consisting of light gauge steel framing , gypsum board, suspended acoustic ceilings, various floor finishes, doors and windows, hardware, paint, casework , etc. , as expected for typical office construct ion. Lighting , Electrical , Mechanical and Plumbing renovations are included, along with modifications to existing automatic fire suppression system . Limited concrete and masonry work is included, along with minor site work. Existing structure is a pre-engineered metal building and is 32,100 square feet , mixed use occupancy, 30,000 sf Storage, 2,100 sf Business. Finished facility will be a mixed-use occupancy; 22,987 sf Storage and 9,113 sf Business . An Alternate Bid will include site work to be performed in addition to Base Bid site work.
Elizabethtown Community and Technical College
Estimate:
$185,000.00
Work under this contract consists of furnishing all labor, materials, equipment and services to re-roof approzimately 16,500 square feet of the Occupational Technical Building (OTB) 100. New roofing membrane shall be a granular surfaced 2-ply SBS modified bitumen over tapered rigid insulation. The work will entail complete removal of the existing modified bitumen roofing system and rigid insulation down to existing metal deck. Existing stainless steel copings and counterflashing shall be salvaged and reused.
RFB-196-15 Boiler Replacement Louisville Career Center
Education & Workforce Development
Estimate:
$175,960.00
Work of the Project includes removal and replacement of hot water heating boilers located in the basement mechanical equipment room. Work includes but not limited to the following. Demolition of two existing cast iron hot water boilers and associated pumps, vents and piping. Installation of three high efficiency gas fired condensing boilers including associated hot water and natural gas piping. Installation of new metal modular chimney system from boilers through the roof. Electrical wiring of HVAC equipment. Alterations and additions to existing DDC automation system.