Bullock Pen Water District – Looped Water Lines Phase 14
Bullock Pen Water District – Looped Water Lines Phase 14
Construction of Contract 1 – White Chapel/Chipman Ridge section of the Looped Water Lines, Phase 14 project will consist of construction of 1,440′ of 6″ PVC waterline, 500′ of 8″ HDPE waterline, jack & bored casing pipe, directional bored casing pipe, gate valves, wet tap, dry tap, air release valve, fire hydrant, bypass meter, and all other necessary appurtenances.
Construction of Contract 2 – Mitts/Chipman Ridge section of the Looped Water Lines, Phase 14 project will consist of construction of 2,720′ of 6″ PVC waterline, 160′ of 8″ HDPE waterline, service lines, directional bored casing pipe, gate valves, wet tap, dry tap, air release valve, fire hydrant, meters, and all other necessary appurtenances.
Construction of Contract 3 – Williamstown Master Meter Connection section of the Looped Water Lines, Phase 14 project will consist of construction of 1,940′ of 6″ PVC waterline, 520′ of 8″ HDPE waterline, jack & bored casing pipe, gate valves, wet tap, dry tap, air release valve, fire hydrant, master meter assembly, and all other necessary appurtenances.
Construction of Contract 4 – Vallandingham/Osborne section of the Looped Water Lines, Phase 14 project will consist of construction of 2,100′ of 6″ PVC waterline, 380′ of 8″ HDPE waterline, service lines, directional bored casing pipe, gate valves, dry taps, air release valve, fire hydrants, meters, concrete & pipe encasement, asphalt replacement, gravel driveway replacement, and all other necessary appurtenances.
Crittenden, KY