City Of Frankfort – Fort Boone Pump Station Replacement
City Of Frankfort – Fort Boone Pump Station Replacement
The project scope includes constructing a 660 gpm Submersible Pump Station consisting of a 10′ diameter wetwell, valve vault , 548 LF of 8′ gravity sewer, 272 LF of 8″ force main and the demolition of the existing pump station.
City Of Berea – Clay Drive – Woodford Avenue Sanitary Sewer Rehabilitation
City Of Berea – Clay Drive – Woodford Avenue Sanitary Sewer Rehabilitation
Sanitary sewer rehabilitation by means of both trench and trenchless technologies as shown on the drawings and/or Described in the Specifications. Approximatelv 2,500 LF of sewer line and 13 manholes are included in the scope of this sanitary sewer rehabilitation. The bids will include all provisions of the project including all associated work necessary to provide a finished product that meets the requirements set forth in the Contract Documents.
LaRue County Middle School Kitchen Floor Renovation
LaRue County Middle School Kitchen Floor Renovation
Project consists of removal of kitchen equipment. demolish existing quarry tile floor, install trench drain, move light switches, modify masonry openings and install new kitchen rolling security grilles, level sub-base, install new epoxy resin flooring system, and reinstall kitchen equipment.
Project cost range is anticipated to be around $100,000.
Construction Contract: Bids will be received for the following Work:
1. General Contract (all trades).
2349.1 Modifications To Soccer-Softball Water Line
2349.1 Modifications To Soccer-Softball Water Line
Modifications to the existing domestic water service at the Soccer-Softball Complex, Remove existing 8″ meter on the main feed and provide metering at individual 2″ lines feeding the complex. Re-feed dugout water services as shown.
CCK-2044-15 Front Reception Of The Chi Omega House – Phase 1 (Interior) And Phase 2 (Exterior)
CCK-2044-15 Front Reception Of The Chi Omega House – Phase 1 (Interior) And Phase 2 (Exterior)
This project will be in two phases – Phase I (interior to be completed summer 2015) and Phase II (exterior to be completed fall 2015). The work includes the removal and replacement of the front covered porch, replacement and adding of first floor windows and addition of the thru-wall mechanical units, lighting upgrades and added patio with fencing.
Hyden-Leslie Co Water District – Stone Coal Road and Elk Creek Waterline Relocations
Hyden-Leslie Co Water District – Stone Coal Road and Elk Creek Waterline Relocations
Stone Coal Road Waterline Relocations:
a. 3” CL 250 PVC waterline 500 LF
b. 1” CL 200 hdpe service line 30 LF
c. 4 HDPE DR9 (IPS) Horizon Directional Drill 60 LF
d. 3” Gate valves 4 EA
Elk Creek Waterline Relocations:
a. 3” CL 250 PVC waterline 280 LF
b. 1” CL 200 hdpe service line
c. 4 HDPE DR9 (IPS) Horizon Directional Drill 160 LF
d. 3” Gate valves 2 EA
Project consists of:
Wood studs, Drywall, Insulation, Brick Veneer, Metal Roof, Acoustical Ceilings, Paint, Aluminum Windows, Bank Equipment
Building Size: 3,585 square feet, single story, new construction
The Village Of Buckhorn – Buckhorn AML Water Supply Project
The Village Of Buckhorn – Buckhorn AML Water Supply Project
The contract will consist of the construction of approximately 38,600 linear feet of 6 and 3 inch waterlines, the installation of one ‘(1) hydro-pneumatic pump station and the rehabilitation of one (1) hydro-pneumatic pump station. The Contractor shall furnish all materials, equipment and labor necessary to complete the construction of the waterline, appurtenances and reclamation.
CCK-2043-15 Funkhouser 207 Kitchen Teaching Lab And Smart Classroom
CCK-2043-15 Funkhouser 207 Kitchen Teaching Lab And Smart Classroom
This project includes the fit-up for a completely functional kitchen with all associated equipment, along with a teaching classroom with smart technology and addition of new ductwork and exhaust fan for new cooking hood, and lighting/power upgrades.
The project includes the construction of a new park, structures, lighting, utilities, landscaping, playground, splash pad, other park amenities, and all other items necessary for construction of a complete park.
Boiler Plant Upgrades – Ramsey Building EKU
Estimate: $1,155,000.00
1 ). Base Bid:
A). Demolition and Installation of boiler feedwater system from the outlet of the water
softeners to the connection to the boiler. Work includes but not limited to installation of
the new deaerator, surge tank, boiler feed water pumps and all associated valves,
pipes and fittings; controls by others.
B). Demolition and Installation of floor drain in areas indicated on the drawings.
C). Demolition and Installation of new structural platforms and relocation of coal auger
motor as indicated on the drawings.
2). Alternate #1: Demolition and Installation of domestic water system from
underground water utility pipe to the inlet to the water softeners.
3). Alternate #2: Demolition and Installation of high pressure steam piping and meters
4). Alternate #3: Demolition and Installation of boiler bottom and surface blowdown
piping and associated worked.
5). Alternate #4: Installation of two new circulation fans.
Louisville Metro Government’s need for Bituminous Concrete (Hot Asphalt) & Liquid Asphalt Rebid #3434
Louisville Metro Government’s need for Bituminous Concrete (Hot Asphalt) & Liquid Asphalt Rebid #3434
A price contract for a portion of Louisville Metro Government’s need for Bituminous Concrete (Hot Asphalt) & Liquid Asphalt ReBid for a period of twelve (12) months.
The work is located in Lexington, Kentucky, on the University of Kentucky campus near the Gluck Equine Research Building and Nicholasville Road. Earthwork for parking lot with Underground detention basin; furnishing and installation of new storm sewer manholes; furnishing and installation of 15-inch, 18-inch, and 24-inch storm sewers and accessories; landscaping; installation of parking lot lighting, and accessories, removal of curb and gutter, and modification to drainage structures.
CONTRACT 5: LEVEE IMPROVEMENTS (Water & Sewer)
a.) 2 EA Remove existing sewer pump station and water control vault
b.) 34 CY Furnish and install flowable fill
c.) 470 LF Pressure grout existing lines
d.) 120 LF Cleans 8″ CIP
e.) 1 LS Miscellaneous items to be removed ie. Pipes, stumps, foundation, etc.
McCreary County Schools – Pine Knot Intermediate Roof Replacement
McCreary County Schools – Pine Knot Intermediate Roof Replacement
Project Description:
This project includes roof replacement of approximately 49,000 square feet. The majority of this demolition and installation work is asphalt shingles. New gutters and downspouts are included along with a vented nailbase insulated panel and interior ceiling replacement as well.