Uncategorized

RFB-213-15 Electrical Sub-Metering Project-Group 2

CEMCS Remediation Frankfort Locations
This project is for providing electrical meters and associated components in select existing electrical switchgear, panels, and disconnect switch locations.

Frankfort, Kentucky

click here to order

Ashland Independent Schools – Alumni Gymnasium Exterior Renovation

Ashland Independent Schools – Alumni Gymnasium Exterior Renovation

Ashland Independent Schools will receive bids to furnish all labor and materials to complete the: Ashland Independent Schools – Alumni Gymnasium Exterior Restoration

Ashland, KY

Click Here to View

Estill County High School Partial Interior Renovation – Bid Package 2: Bleacher Replacement

Estill County High School Partial Interior Renovation – Bid Package 2: Bleacher Replacement

This project includes replacement of all bleachers in the High School gymnasium. It also includes scoreboards, divider curtains and replacement of two stairs for added egress.

Irvine, KY

Click Here to View

CCK-2034-15 Dairy Barn Concrete

CCK-2034-15 Dairy Barn Concrete

Contractor to furnish labor and material to construct concrete pad for the Dairy Barn.

Lexington, KY

Click Here to View

Rowan County Senior High School Renovations

Rowan County Senior High School Renovations

The project scope includes Multi-phased renovation project of the existing high school. Major work includes technology upgrades , restroom and locker room renovations, ceiling replacement, secure entry vestibule , door and bleacher replacement, and locker alcove upgrades.

Morehead, KY

Click Here to View

ACC-UL Student Housing

ACC-UL Student Housing

Louisville, KY

Click Here to View

LFUCG – Carver Center Restroom Renovation

LFUCG – Carver Center Restroom Renovation

Consisting of the items as listed in the Bid Schedule beginning on page P-6, Part 1lI, Form of Proposal, of this document, for the Carver Center Restroom Renovation, 522 Patterson St., Lexington-Fayette County, Kentucky.

Lexington, KY

Click Here to View

Owen County Upper Elementary Storm Drainage Repairs

Owen County Upper Elementary Storm Drainage Repairs

The project scope includes installation of new drainage structures and piping to remediate existing issues with the current storm water system.

Owenton, KY

Click Here to View

RFB-208-15 RE-ADVERTISEMENT OF RFB-170-15

Ballard Wildlife Management Area Office
Estimate:
$241,294.00
This project, KDFWR Ballard County Office Complex, located at Wildlife Lodge Road, LaCenter, Kentucky in Ballard County, shall generally consist of the new construction of an approximate 2,330 square feet office building with living quarters. The proposed facility is an elevated one story wood framed structure with Pre-engineered wood truss roof framing and a combination of isolated masonry piers and continuous foundation walls atop reinforced concrete slab/grade beams and footings. The project includes all associated Mechanical, Electrical and Plumbing elements such as primary services, fixtures/devices, equipment and all related appurtenances. The project site is being reclaimed from a previously razed structure and shall include certain site improvements such as minor earthwork, select removal, and alterations.

La Center

click here to order

RFB-206-15 Emergency Power Expansion – Building K

Green River Correctional Complex
Estimate:
$198,500.00
This project consists of installing a new generator and automatic transfer switch (ATS) to provide emergency back-up power to an existing motor control center. This project also includes disconnecting the emergency feed to an existing ATS and re-feeding the ATS from the new emergency generator. This project will include testing and commissioning of the new generator and ATS prior to moving of existing loads to the generator. This project will include final testing of the new generator and all ATSs after the generator & ATSs installation has been completed and is feeding the existing loads.

Central City

click here to order

Madison County Schools – Foley and Silver Creek Additions and Renovations

Madison County Schools – Foley and Silver Creek Additions and Renovations

Furnishing of all labor, materials, equipment and services for the following bid packages,

Bid Package #1 Foley Middle School Renovation and Additions
Bid Package #2 Silver Creek Elementary School Renovation
Bid Package #3 Combined Bid; Foley Middle School Renovation and Additions, And Silver Creek Elementary School Renovation
Estimate is $7,000,000 for bid package # 1, $3,500,000 for bid package #2, $10,500,000 for combined bid.

Richmond, KY

Click Here to View

Pulaski County Schools – Athletic Improvements

Pulaski County Schools – Athletic Improvements

Project consists of: The furnishing of all labor, materials , supplies, tools, equipment, services , etc., necessary for the construction of the Pulaski County Athletic Improvements, for three bid packages listed below:
Bid Package No. I: Pulaski County High School Football Field Synthetic Turf Installation
Bid Package No.2: Southwestern High School Football Field Synthetic Turf Installation
Bid Package No.3: Combined Bid Package – Pulaski County & Southwestern High Schools

Somerset, KY

Click Here to View

CCK-2031-15 Front Renoation of Chi Omega House

CCK-2031-15 Front Renoation of Chi Omega House

This project includes the removal and replacement of the front covered porch, replacement and adding of first floor windows, addition of the thru-wall mechanical unit, lighting upgrades and added patio with fencing.

Lexington, KY

Click Here to View

2382.0 Repair/Upgrade/Improve Mechanical Systems Old Fine Arts Building Phase 2

2382.0 Repair/Upgrade/Improve Mechanical Systems Old Fine Arts Building Phase 2

This is the second phase of a project to replace and upgrade major mechanical systems in the Fine Arts Building which includes replacement/upgrade of the air handling units and associated temperature controls, exhaust fans and reheat coils. This phase of the project includes replacement exhaust fans EF-2 (and relabeling as EF-9) which serves the 3rd floor restrooms, E-4, E-5, removing E-7 but not replacing, and adding EF-8. It also includes replacing the air handling units serving the Tuska Gallery (S-5) and Guignol Theater (S-4); it also includes replacing additional reheat coils and sprinkling the building.

Lexington, KY

Click Here to View

Mountain Comprehensive Health Corporation – Whitesburg Clinic Renovation

Mountain Comprehensive Health Corporation – Whitesburg Clinic Renovation

Mechanical and electrical work for the renovation of the Whitesburg Clinic, located at 226 Medical Plaza Lane, Whitesburg, KY, which contains approximately 8,000 gross square feet.

Whitesburg, KY

Click Here to View

15-59 690 Plan- Forest Hill Hydro-Booster Pumping Station Renovation

15-59 690 Plan- Forest Hill Hydro-Booster Pumping Station Renovation

Louisville Water Company is requesting bids for the Renovation of an existing underground hydro-booster pumping station including pump and motor replacement, electrical and control work, site work, meter prv work, EPSC, and restoration.

Louisville, KY

Click Here to Order

2427.0 Relocate Waterline on University Drive

2427.0 Relocate Waterline on University Drive

Relocate existing water line between University Drive and existing Blanding Housing Complex.

Lexington, KY

Click Here to View

McLean County Schools Central Office – Maintenance And Central Storage Fit-Up

McLean County Schools Central Office – Maintenance And Central Storage Fit-Up

Renovations to provide for new Central Office facility, new Central Storage space and new space for District Maintenance staff. Work to include demolition of existing interior fit-up and new construction consisting of light gauge steel framing , gypsum board, suspended acoustic ceilings, various floor finishes, doors and windows, hardware, paint, casework , etc. , as expected for typical office construct ion. Lighting , Electrical , Mechanical and Plumbing renovations are included, along with modifications to existing automatic fire suppression system . Limited concrete and masonry work is included, along with minor site work. Existing structure is a pre-engineered metal building and is 32,100 square feet , mixed use occupancy, 30,000 sf Storage, 2,100 sf Business. Finished facility will be a mixed-use occupancy; 22,987 sf Storage and 9,113 sf Business . An Alternate Bid will include site work to be performed in addition to Base Bid site work.

Calhoun, KY

Click Here to View

RFB-188-15 Roof Repairs Occupational Tech Bldg 100

Elizabethtown Community and Technical College
Estimate:
$185,000.00
Work under this contract consists of furnishing all labor, materials, equipment and services to re-roof approzimately 16,500 square feet of the Occupational Technical Building (OTB) 100. New roofing membrane shall be a granular surfaced 2-ply SBS modified bitumen over tapered rigid insulation. The work will entail complete removal of the existing modified bitumen roofing system and rigid insulation down to existing metal deck. Existing stainless steel copings and counterflashing shall be salvaged and reused.

Elizabethtown, Kentucky

click here to order

RFB-196-15 Boiler Replacement Louisville Career Center

Education & Workforce Development
Estimate:
$175,960.00
Work of the Project includes removal and replacement of hot water heating boilers located in the basement mechanical equipment room. Work includes but not limited to the following. Demolition of two existing cast iron hot water boilers and associated pumps, vents and piping. Installation of three high efficiency gas fired condensing boilers including associated hot water and natural gas piping. Installation of new metal modular chimney system from boilers through the roof. Electrical wiring of HVAC equipment. Alterations and additions to existing DDC automation system.

Louisville, Kentucky

click here to order

Augusta Independent School

Augusta Independent School Phase I renovations

Augusta, Kentucky

click here to order

Housing Authority of Danville

Roof Replacement Nichols, Community Building Renovation AMP 201
Work will include the following: ROOF REPLACEMENT NICHOLS, COMMUNITY BUILDING RENOVATION AMP 201

Danville, Kentucky

click here to order

Morehead Utility Plant Board – MSU Lift Station

Morehead Utility Plant Board – MSU Lift Station

This contract consists of approximately 350 LF of 8″ gravity sewer, 1 manhole, 1225 LF of 2″ SDR 11 HDPE force main, one duplex sewage pumping station and other appurtenances

Morehead, KY

Click Here to View

City of Livingston – Sidewalk Construction Project REBID

City of Livingston – Sidewalk Construction Project REBID

The work to be bid upon is described as follows:
Construct approximately 1,840 SY of Concrete Sidewalk and Ramps
Construct 40 LF of 18″ Storm Pipe, 2 Storm Inlets and 1 Headwall
Construct approximately 1,500 LF of Concrete Curb and Gutter Construct 673 SY of Concrete Entrance Pavement
Landscaping, Street Lighting, & Street Furniture

Livingston, KY

Click Here to View

2370.0 Construct Bathrooms in Arboretum

2370.0 Construct Bathrooms in Arboretum

The project is construction of foundation systems to support a pre-manufactured toilet structure to be purchased by allowance sum and delivered and installed by others. The project also includes site utility work and the attachment of these utilities to the stub-outs provided by the pre-manufactured toilet building manufacturer. The work generally consists of the following:
• Earthwork
• Concrete foundation systems
• Installation of site utilities, including hook-ups to the building
• Concrete paving
• Seeding of disturbed soil

Lexington, KY

Click Here to View

Subscribe